X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-23933"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-23933
 
| Well ID: 37-005-23933
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.902791, -79.353387 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.902791, -79.353387 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Wayne Township,_Armstrong_County,_Pennsylvania|Wayne Township]]
 
| Municipality: [[Wayne Township,_Armstrong_County,_Pennsylvania|Wayne Township]]
 
|-
 
|-
| Operator Name: [[ALCOVE INVESTMENTS]]
+
| Operator Name:  
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 19: Line 19:
 
| Farm/Lease Name: BASHLINE 2
 
| Farm/Lease Name: BASHLINE 2
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 11/29/1988
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/15/1988
+
| Permit Date: 1988-07-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.902791
 
| Latitude: 40.902791
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1988-07-15
 +
| New Permit Application
 +
|-
 +
| 1988-11-29
 +
| Performed Spud Operation
 +
|-
 +
| 1988-12-01
 +
| Drilling Completion
 +
|-
 +
| 1989-07-31
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 3,124.00
+
| style="text-align: right;" | 3124
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 3,018.67
+
| style="text-align: right;" | 3018.67
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,936.67
+
| style="text-align: right;" | 2936.67
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999
 
| 1999
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,520.33
+
| style="text-align: right;" | 2520.33
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,779.33
+
| style="text-align: right;" | 2779.33
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 1,961.67
+
| style="text-align: right;" | 1961.67
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 1,343.00
+
| style="text-align: right;" | 1343
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,261.00
+
| style="text-align: right;" | 2261
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 1,881.00
+
| style="text-align: right;" | 1881
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 1,395.00
+
| style="text-align: right;" | 1395
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,194.00
+
| style="text-align: right;" | 2194.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 173: Line 236:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 2,316.00
+
| style="text-align: right;" | 2316.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[ALCOVE INVESTMENTS]]
 
| [[ALCOVE INVESTMENTS]]
| style="text-align: right;" | 1,680.00
+
| style="text-align: right;" | 1680.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 200: Line 263:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 209: Line 272:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 218: Line 281:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 227: Line 290:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 236: Line 299:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 245: Line 308:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 254: Line 317:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 263: Line 326:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 272: Line 335:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 286: Line 349:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 387: Line 451:
 
| 82871
 
| 82871
 
| 12/01/1988
 
| 12/01/1988
| 01/10/1989
+
| 1988-12-01
 
| 301307 - Unpermitted discharge of IW (brine, drill cuttings, & oil spills)
 
| 301307 - Unpermitted discharge of IW (brine, drill cuttings, & oil spills)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 395: Line 459:
 
| 82872
 
| 82872
 
| 01/10/1989
 
| 01/10/1989
| 04/20/1989
+
| 1989-01-10
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 403: Line 467:
 
| 93231
 
| 93231
 
| 08/21/1990
 
| 08/21/1990
| 01/23/1991
+
| 1990-08-21
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 411: Line 475:
 
| 93234
 
| 93234
 
| 09/10/1990
 
| 09/10/1990
| 01/23/1991
+
| 1990-09-10
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 433: Line 497:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 02/27/1989
+
| 1989-02-27
 
| style="text-align: right;" | $675.00
 
| style="text-align: right;" | $675.00
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 442: Line 506:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 02/27/1989
+
| 1989-02-27
 
| style="text-align: right;" | $675.00
 
| style="text-align: right;" | $675.00
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 451: Line 515:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/10/1989
+
| 1989-01-10
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 460: Line 524:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 04/20/1989
+
| 1989-04-20
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 469: Line 533:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/23/1991
+
| 1991-01-23
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 480: Line 544:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 22:04, 1 June 2020

Well Details

Well ID: 37-005-23933
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Wayne Township
Operator Name:
Well Pad ID:
Farm/Lease Name: BASHLINE 2
License Status: ACTIVE
Spud Date:
Permit Date: 1988-07-15
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.902791
Longitude: -79.353387

For data sources see[1][2][3]

Well History

Date Event
1988-07-15 New Permit Application
1988-11-29 Performed Spud Operation
1988-12-01 Drilling Completion
1989-07-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1994 ALCOVE INVESTMENTS 4,332.00 365 0.00 0 0.00 0
1996 ALCOVE INVESTMENTS 3124 365 0.00 0 0.00 0
1997 ALCOVE INVESTMENTS 3018.67 365 0.00 0 0.00 0
1998 ALCOVE INVESTMENTS 2936.67 365 0.00 0 0.00 0
1999 ALCOVE INVESTMENTS 2520.33 365 0.00 0 0.00 0
2000 ALCOVE INVESTMENTS 2779.33 365 0.00 0 0.00 0
2001 ALCOVE INVESTMENTS 1961.67 365 0.00 0 0.00 0
2002 ALCOVE INVESTMENTS 1343 365 0.00 0 0.00 0
2003 ALCOVE INVESTMENTS 2261 365 0.00 0 0.00 0
2004 ALCOVE INVESTMENTS 1881 365 0.00 0 0.00 0
2005 ALCOVE INVESTMENTS 1395 365 0.00 0 0.00 0
2006 ALCOVE INVESTMENTS 2194.00 365 0.00 0 0.00 0
2007 ALCOVE INVESTMENTS 825.00 365 0.00 0 0.00 0
2008 ALCOVE INVESTMENTS 2316.00 365 0.00 0 0.00 0
2009 ALCOVE INVESTMENTS 1680.00 365 0.00 0 0.00 0
2010 ALCOVE INVESTMENTS 1,569.00 365 0.00 0 0.00 0
2011 ALCOVE INVESTMENTS 1,598.00 365 0.00 0 0.00 0
2012 ALCOVE INVESTMENTS 1,306.00 365 0.00 0 0.00 0
2013 ALCOVE INVESTMENTS 1,648.00 365 0.00 0 0.00 0
2014 ALCOVE INVESTMENTS 1,508.00 365 0.00 0 0.00 0
2015 ALCOVE INVESTMENTS 1,341.00 365 0.00 0 0.00 0
2016 ALCOVE INVESTMENTS 1,031.00 365 0.00 0 0.00 0
2017 ALCOVE INVESTMENTS 1,198.00 365 0.00 0 0.00 0
2018 ALCOVE INVESTMENTS 1,682.00 365 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
209875 Primary Facility 1988-11-23 Routine/Complete Inspection No Violations Noted GRADED
209876 Primary Facility 1988-11-29 Routine/Complete Inspection No Violations Noted RIGGING UP
209877 Primary Facility 1988-12-01 Drilling/Alteration Violation(s) Noted PIT LEAKING
209878 Primary Facility 1989-01-10 Routine/Complete Inspection Violation(s) Noted E&S VIOL
209879 Primary Facility 1989-04-20 Routine/Complete Inspection No Violations Noted E&S OK; NO TANK
209880 Primary Facility 1989-07-05 Routine/Complete Inspection No Violations Noted E&S OK
209881 Primary Facility 1989-07-18 Drilling/Alteration No Violations Noted E&S OK
213332 Primary Facility 1990-08-21 Routine/Complete Inspection Violation(s) Noted SITE, ROAD ERODING;NO TANK
213334 Primary Facility 1990-09-10 Routine/Complete Inspection Violation(s) Noted ROAD, SITE UNST-NOV SENT
213341 Primary Facility 1991-01-23 Routine/Complete Inspection No Violations Noted VIOLATION CORRECTED

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
209877 82871 12/01/1988 1988-12-01 301307 - Unpermitted discharge of IW (brine, drill cuttings, & oil spills) Environmental Health & Safety DRILL FLUID DISCHARGE
209878 82872 01/10/1989 1989-01-10 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety SITE/ACCESS RD UNSTABLE
213332 93231 08/21/1990 1990-08-21 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety ROAD, SITE UNSTABLE
213334 93234 09/10/1990 1990-09-10 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety ROAD, SITE UNSTABLE

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
82871 30268 CACP - Consent Assessment of Civil Penalty Comply/Closed 1989-02-27 $675.00
82871 30270 CACP - Consent Assessment of Civil Penalty Comply/Closed 1989-02-27 $675.00
82871 30593 NOV - Notice of Violation Comply/Closed 1989-01-10
82871 30594 NOV - Notice of Violation Comply/Closed 1989-04-20
93231 25637 NOV - Notice of Violation Comply/Closed 1991-01-23

For data sources see[6]

References