Well Details

Well ID: 37-005-30755
Loading map...
County: Armstrong
Municipality: Kiskiminetas Township
Operator Name: US ENERGY EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: J DITTY 1
First Permit Date: 2010-12-08
Last Permit Date: 2010-12-08
Spud Date: 2011-05-18
Unconventional: No
Configuration: Vertical
Well Status: ACTIVE
Violations: 4
Latitude: 40.581591
Longitude: -79.456488

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 1437.0 90.0 0.0 0.0 0.0 0.0
2012-0 2602.0 360.0 0.0 0.0 0.0 0.0
2013-0 2731.0 360.0 0.0 0.0 0.0 0.0
2014-0 1950.0 365.0 0.0 0.0 0.0 0.0
2011-0 1437.0 90.0 0.0 0.0 0.0 0.0
2013-0 2731.0 360.0 0.0 0.0 0.0 0.0
2012-0 2602.0 360.0 0.0 0.0 0.0 0.0
2014-0 1950.0 365.0 0.0 0.0 0.0 0.0
2015-0 1581.0 365.0 0.0 0.0 0.0 0.0
2016-0 1147.0 365.0 0.0 0.0 0.0 0.0
2017-0 968.0 365.0 0.0 0.0 0.0 0.0
2018-0 1580.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION COMMENT
1974150 2011-05-18 Violation(s) Noted 611440 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1974150 2011-05-18 Violation(s) Noted 611441 206B - Failure to implement an erosion and sedimentation control plan prepared in accordance with the Clean Streams Law.
1974150 2011-05-18 Violation(s) Noted 611442 78.53 - Failure to implement and maintain BMPs in accordance with Chapter 102.
1978365 2011-06-03 No Violations Noted Drilling was not ongoing, drillers were waiting to cement the string of casing that they had just finished placing. Pit had been lined and had more than the required two feet of lined freeboard. It did appear that nothing had been done to address the construction issues related to the pit. This could not be confirmed due to the pit being in use. Observed no additional accelerated erosion onsite. Operator had sparsely mulched the fill slope disturbed area. For future site construction the operator should endeavor to have the pit sidewalls sloped instead of perpendicular to the bottom of the pit and silt fencing should be installed so as not to concentrate the runoff flow to one area of the silt fence which will inevitably result in the he failure of the silt fencing.
2043356 2012-02-16 Violation(s) Noted 632249 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. 78.53
2054520 2012-03-28 Outstanding Violations - No Viols Req'd Drilling was completed on 06/10/11, well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Vegetation had grown in thicker, however the erosion issues had not been addressed as of the date of the inspection. Specifically the collection ditch at the base of the cut slope was not stabilized, and the runoff conveyed by the ditch was generating and transporting sediment off-site. In addition there were erosion rills developing off of the well pad onto the fill slope which were alos generating and transporting sediment.
2062705 2012-04-26 Outstanding Violations - No Viols Req'd Met onsite with operator representative Harry Mills to review the violations noted in the 02/16/12 and 03/28/12 inspections. The issue noted with the culvert outlet immediately adjacent to the well-site had been properly addressed. Reviewed with Mr. Mills the erosion control options to address the collection ditch on the well pad. Mr. Mills stated that a crew will be onsite shortly to begin regrading the ditch, rocking it, and seeding and mulching the area.
2064308 2012-05-02 Outstanding Violations - No Viols Req'd Erosion control measures as discussed with Mr. Mills during the 04/26/12 inspection had not been implemented as it was discussed during the 04/26/12 site meeting. Site had been mulched, however the collection ditch flowing from the end of the access road along the backside of the well-pad had not been stabilized with rock as it was discussed during the 04/26/12 site meeting.
2085649 2012-07-23 No Violations Noted Drilling had been completed well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Well-site had been regraded and the vegetative cover met the 70% uniform coverage criteria. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. The collection ditch flowing from the end of the access road along the bottom of the well-site cut slope had been stabilized with clearn durable rock.

For data sources see[2]