X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-021-21182"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 22:14, 17 June 2014

Well Details

Well ID: 37-021-21182
Loading map...
Operator Name: NTS ENERGY LLC
First Permit Date: 2011-11-10
Last Permit Date: 2011-11-10
Spud Date: 2011-12-19
Unconventional: No
Horizontal: No
Violations: 2
Latitude: 40.624258
Longitude: -78.7344

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2028941 2011-11-21 No Violations Noted Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard at the pit were present at the site. Filter fence was located on down gradient side of site. Phillips (Kline ¿ tool pusher) was contracted by NTS. Mine shaft was encountered at 110 feet to 115 feet interval. Mine casing (13 3/8¿ pipe) was set at 142 feet with cement basket at 60 feet. 100 sacks of Type 1 were used to cement mine casing with 15 bbls of return on the back side of pipe. Plug was down at 12/21/11 at 04:18 hrs. Phillips was waiting the 8 hour cement set up time.
2029945 2011-12-28 No Violations Noted Well Id sign and E&S plan were present at access road. At the time of the inspection, no E&S concerns and no freeboard at the pit were present at the site. Filter fence was located on down gradient side of site. Phillips (Kline ¿ tool pusher) was contracted by NTS. Conductor pipe (20¿ pipe) was set at 28 feet and was sanded in. Mine shaft was encountered at 110 feet to 115 feet interval. Water intervals were recorded at 29 feet and 300 feet. Mine casing (13 3/8¿ pipe) was set at 142 feet with cement basket at 60 feet. 100 sacks of Type 1 were used to cement mine casing with 15 bbls of return on the back side of pipe. Intermediate casing (7¿ pipe) was set at 969 feet and was cemented with 360 sacks of Type I with 20 bbls of return. Plug was down at 3:30 pm at 12/27/11. Phillips was currently drilling depth of 1,090 feet. The anticipated DTD was 3,550 feet.
2036821 2012-01-12 No Violations Noted Site visit was part of routine inspection.

E&S plan shows the pit being constructed on the cut side of the pad, however it was actually built on the fill side. These changes need to be addressed on the site plan with red pen and initialling. This was discussed with Steve Phillips (Owner). Site was rocked, slightly muddy but stable. The pit was constructed nearly 15 feet below the well pad due to rock on site, according to Mr. Phillips. A good deal of springs are around the site. After discussing these matters with Mr. Phillips, it was agreed upon to remove the cuttings for disposal rather than encapsulation. BMPs were properly installed and working adequately. No E&S issues. No violations noted at this time. PA DEP Water Quality Specialist April Weiland was present during inspection.

2052900 2012-03-23 Viol(s) Noted & Immediately Corrected Inspection also includes 021-21183. 635097
2052900 2012-03-23 Viol(s) Noted & Immediately Corrected Inspection also includes 021-21183. 635098

References