Well ID: 027-21501 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.848559,"lon":-78.244281,"icon":""}]} |
County: Centre | |
Municipality: Rush Township | |
Operator Name: CARRIZO OIL & GAS INC | |
Farm/Lease Name: COWFER 1 | |
First Permit Date: 2009-03-23 | |
Last Permit Date: 2009-03-23 | |
Spud Date: 2009-03-28 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: 3 | |
Latitude: 40.848559 | |
Longitude: -78.244281 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1814858 | 2009-07-22 | No Violations Noted | The following items were noted during the inspection:
-Met with Mr. Gary Byron, Enviro Consultant. -Currently flowing back frac into tanks. -Site sign and E & S plan were on site. -E&S BMPs were in place and working adequately. -Reserve pits met regulatory standards, freeboard at 4¿ & 5¿. |
|
1781587 | 2009-04-02 | No Violations Noted | drilling - open mine @309ft - cased&cemented to 353ft/ID&pit ok/E&S ok | |
1782427 | 2009-04-10 | No Violations Noted | review well records | |
1872608 | 2010-03-24 | De minimus Violations Noted | Drilling is completed, well is not in production.
2 pits are still open w/ safety fence around. Well tag not on well. |
|
1872824 | 2010-03-18 | Violation(s) Noted | - Well drilling was completed on 4/19/2009. Fraccing was completed on 8/24/2009. Well is completed and not yet in production. Site ID is still in place, no well tag in place.
-The site is permanantly stabilized. Two pits containing production fluids and precipitation remain on site. The front most pit had overtopped slightly. The fluids from the pit have only traveled about 3' across the ground surface. A sample was taken from the pit at the point it was overtopping. Gary Byron was notified of the overfilled pit and provided pictures showing that the issue was corrected. - The 9 month restoration period for this site has passed. This has also been discussed with Mr. Byron. |
584008 |
1872824 | 2010-03-18 | Violation(s) Noted | - Well drilling was completed on 4/19/2009. Fraccing was completed on 8/24/2009. Well is completed and not yet in production. Site ID is still in place, no well tag in place.
-The site is permanantly stabilized. Two pits containing production fluids and precipitation remain on site. The front most pit had overtopped slightly. The fluids from the pit have only traveled about 3' across the ground surface. A sample was taken from the pit at the point it was overtopping. Gary Byron was notified of the overfilled pit and provided pictures showing that the issue was corrected. - The 9 month restoration period for this site has passed. This has also been discussed with Mr. Byron. |
584010 |
1873003 | 2010-03-24 | Outstanding Violations - No Viols Req'd | -Since inspection dated on 3/18/2010, front pit has been pumped down. Both pits on site have greater than 2' of freeboard.
- Gary Byron is working on the submission of the request to have the restoration period of this site extended. |
|
2003593 | 2011-07-28 | Viol(s) Noted & Immediately Corrected | 620406 | |
2003630 | 2011-08-03 | No Violations Noted | ||
2024189 | 2011-09-30 | No Violations Noted | ||
2026178 | 2011-10-20 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2009-0 | BRINE | 1200.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | PA BRINE TRT - FRANKLIN PLT | |||
2010-3 | PRODUCED FLUID | 1040.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 | PA BRINE TRT INC - FRANKLIN PLT - VENANGO CO | FRANKLIN | PA |
2010-3 | DRILLING FLUID WASTE | 100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-3 | FRACING FLUID WASTE | 1100.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |