X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24077"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-051-24077
 
| Well ID: 37-051-24077
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.04708, -79.834253 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.04708, -79.834253 | width=100% | height=100% }}  
 +
|-
 +
| County: [[Fayette County, Pennsylvania|Fayette]]
 +
|-
 +
| Municipality: [[Jefferson Township, Fayette County, Pennsylvania|Jefferson Township]]
 
|-
 
|-
 
| Operator Name: [[ATLAS RESOURCES LLC]]
 
| Operator Name: [[ATLAS RESOURCES LLC]]
 +
|-
 +
| Well Pad ID:
 +
|-
 +
| Farm/Lease Name: HENDERSON 7
 
|-
 
|-
 
| First Permit Date: 2008-09-16
 
| First Permit Date: 2008-09-16
Line 16: Line 24:
 
|-
 
|-
 
| Horizontal: No
 
| Horizontal: No
 +
|-
 +
| Well Status: ACTIVE
 
|-
 
|-
 
| Violations: 2
 
| Violations: 2
Line 34: Line 44:
 
!scope="col" | OIL PRODUCTION DAYS
 
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2013-0
+
| 2008-0
| style="text-align:right;" | 2613.0
+
| style="text-align:right;" | 0.0
| style="text-align:right;" | 365.0
+
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 43: Line 53:
 
|-
 
|-
 
|-
 
|-
| 2012-0
+
| 2009-0
| style="text-align:right;" | 3370.0
+
| style="text-align:right;" | 5810.0
| style="text-align:right;" | 366.0
+
| style="text-align:right;" | 247.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 52: Line 62:
 
|-
 
|-
 
|-
 
|-
| 2011-0
+
| 2010-0
| style="text-align:right;" | 3594.0
+
| style="text-align:right;" | 5398.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 61: Line 71:
 
|-
 
|-
 
|-
 
|-
| 2010-0
+
| 2011-0
| style="text-align:right;" | 5398.0
+
| style="text-align:right;" | 3594.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 70: Line 80:
 
|-
 
|-
 
|-
 
|-
| 2009-0
+
| 2012-0
| style="text-align:right;" | 5810.0
+
| style="text-align:right;" | 3370.0
| style="text-align:right;" | 247.0
+
| style="text-align:right;" | 366.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 79: Line 89:
 
|-
 
|-
 
|-
 
|-
| 2008-0
+
| 2013-0
 +
| style="text-align:right;" | 2613.0
 +
| style="text-align:right;" | 365.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2014-0
 +
| style="text-align:right;" | 2785.0
 +
| style="text-align:right;" | 365.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 88: Line 107:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 99: Line 124:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
|-
 
| 2012-0
 
| PRODUCED FLUID
 
| style="text-align:right;" | 55.0
 
| Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2009-0
 
| 2009-0
Line 116: Line 130:
 
| Bbl
 
| Bbl
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
 
| BRINE OR INDUSTRIAL WASTE TREATMENT PLT
|  
+
| PA0091472
| TUNNELTON LIQUIDS COMPANY
+
| TUNNELTON LIQUIDS TREATMENT FACILITY
|  
+
| SALTSBURG
|  
+
| PA
 
|-
 
|-
 
|-
 
|-
Line 133: Line 147:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 140: Line 160:
 
!scope="col" | COMMENT
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 
|-
 
|-
 
| 1763071
 
| 1763071
Line 146: Line 168:
 
|  
 
|  
 
| 554501
 
| 554501
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 
|-
 
|-
 
|-
 
|-
Line 153: Line 177:
 
|  
 
|  
 
| 554501
 
| 554501
 +
| 401CSL - Discharge of pollultional material to waters of Commonwealth.
 +
|
 
|-
 
|-
 
|-
 
|-
Line 160: Line 186:
 
|  
 
|  
 
| 554502
 
| 554502
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 167: Line 195:
 
|  
 
|  
 
| 554502
 
| 554502
 +
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 +
|
 
|-
 
|-
 
|-
 
|-
Line 173: Line 203:
 
| No Violations Noted
 
| No Violations Noted
 
| Follow-up to Henderson #7 Diesel fuel spill
 
| Follow-up to Henderson #7 Diesel fuel spill
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 180: Line 212:
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection conducted when there was a fuel spill at the Henderson #7.  Atlas took quick action to contain and clean-up the spill.
 
| Inspection conducted when there was a fuel spill at the Henderson #7.  Atlas took quick action to contain and clean-up the spill.
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 186: Line 220:
 
| 2008-12-22
 
| 2008-12-22
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 193: Line 229:
 
| 2008-12-22
 
| 2008-12-22
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 200: Line 238:
 
| 2008-12-24
 
| 2008-12-24
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 207: Line 247:
 
| 2008-12-27
 
| 2008-12-27
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 214: Line 256:
 
| 2008-12-29
 
| 2008-12-29
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 221: Line 265:
 
| 2008-12-30
 
| 2008-12-30
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 229: Line 275:
 
| No Violations Noted
 
| No Violations Noted
 
| id & e/s plan on site, rigging up for drilling
 
| id & e/s plan on site, rigging up for drilling
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 236: Line 284:
 
| No Violations Noted
 
| No Violations Noted
 
| drilling equipment being set up, site wet & muddy
 
| drilling equipment being set up, site wet & muddy
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 242: Line 292:
 
| 2009-02-11
 
| 2009-02-11
 
| No Violations Noted
 
| No Violations Noted
|  Compliance Evaluation inspection in response to 12/30/08 inspection report & 1/20/09 NOV. Walked well pad & perimeter ¿ no visual evidence or fuel oil odors detected from 12/15/08 Diesel fuel spill incident ¿ recent heavy rains + warm temperatures. Well site drainage pathways & standing pools of water had no oil sheens ¿ only exception was a light oil sheen observed in pooled water adjacent to Bull Dozer. Source of oil was traced to hydraulic oil leaks from Dozer. Operator agreed to immediately abate leaks + change out Dozer ASAP. In addition, observed open containers containing used oil filters & drip fluids. Better housekeeping recommended ¿ transfer all waste fluids & used filters into sealed containers. E & S control improvements observed along lower well site access road near stream crossing. Recent heavy rains did cause sediment wash out onto a wooded bench from well access road immediately below well pad. Operator agreed to immediately add additional E & S controls below wash out area + rework road
+
|  Compliance Evaluation inspection in response to 12/30/08 inspection report & 1/20/09 NOV. Walked well pad & perimeter ﾿ no visual evidence or fuel oil odors detected from 12/15/08 Diesel fuel spill incident ﾿ recent heavy rains + warm temperatures. Well site drainage pathways & standing pools of water had no oil sheens ﾿ only exception was a light oil sheen observed in pooled water adjacent to Bull Dozer. Source of oil was traced to hydraulic oil leaks from Dozer. Operator agreed to immediately abate leaks + change out Dozer ASAP. In addition, observed open containers containing used oil filters & drip fluids. Better housekeeping recommended ﾿ transfer all waste fluids & used filters into sealed containers. E & S control improvements observed along lower well site access road near stream crossing. Recent heavy rains did cause sediment wash out onto a wooded bench from well access road immediately below well pad. Operator agreed to immediately add additional E & S controls below wash out area + rework road
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 250: Line 302:
 
| No Violations Noted
 
| No Violations Noted
 
| sit pit e/s ok, down for cement time
 
| sit pit e/s ok, down for cement time
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 257: Line 311:
 
| No Violations Noted
 
| No Violations Noted
 
| review for cacp
 
| review for cacp
 +
|
 +
|
 
|  
 
|  
 
|-
 
|-
Line 263: Line 319:
 
| 2009-12-31
 
| 2009-12-31
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
Line 270: Line 328:
 
| 2009-01-05
 
| 2009-01-05
 
| No Violations Noted
 
| No Violations Noted
 +
|
 +
|
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 13:25, 26 June 2015

Well Details

Well ID: 37-051-24077
Loading map...
County: Fayette
Municipality: Jefferson Township
Operator Name: ATLAS RESOURCES LLC
Well Pad ID:
Farm/Lease Name: HENDERSON 7
First Permit Date: 2008-09-16
Last Permit Date: 2008-09-16
Spud Date: 2009-02-09
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 2
Latitude: 40.04708
Longitude: -79.834253

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2008-0 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 5810.0 247.0 0.0 0.0 0.0 0.0
2010-0 5398.0 365.0 0.0 0.0 0.0 0.0
2011-0 3594.0 365.0 0.0 0.0 0.0 0.0
2012-0 3370.0 366.0 0.0 0.0 0.0 0.0
2013-0 2613.0 365.0 0.0 0.0 0.0 0.0
2014-0 2785.0 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2009-0 BRINE 48.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2012-0 PRODUCED FLUID 55.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1763071 2008-12-30 Violation(s) Noted 554501 401CSL - Discharge of pollultional material to waters of Commonwealth.
1763071 2008-12-30 Violation(s) Noted 554501 401CSL - Discharge of pollultional material to waters of Commonwealth.
1763071 2008-12-30 Violation(s) Noted 554502 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1763071 2008-12-30 Violation(s) Noted 554502 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
1852778 2008-12-15 No Violations Noted Follow-up to Henderson #7 Diesel fuel spill
1852779 2008-12-16 No Violations Noted Inspection conducted when there was a fuel spill at the Henderson #7. Atlas took quick action to contain and clean-up the spill.
1852781 2008-12-22 No Violations Noted
1852786 2008-12-22 No Violations Noted
1852787 2008-12-24 No Violations Noted
1852788 2008-12-27 No Violations Noted
1852794 2008-12-29 No Violations Noted
1852796 2008-12-30 No Violations Noted
1770502 2009-02-17 No Violations Noted id & e/s plan on site, rigging up for drilling
1773645 2009-02-10 No Violations Noted drilling equipment being set up, site wet & muddy
1774441 2009-02-11 No Violations Noted Compliance Evaluation inspection in response to 12/30/08 inspection report & 1/20/09 NOV. Walked well pad & perimeter ﾿ no visual evidence or fuel oil odors detected from 12/15/08 Diesel fuel spill incident ﾿ recent heavy rains + warm temperatures. Well site drainage pathways & standing pools of water had no oil sheens ﾿ only exception was a light oil sheen observed in pooled water adjacent to Bull Dozer. Source of oil was traced to hydraulic oil leaks from Dozer. Operator agreed to immediately abate leaks + change out Dozer ASAP. In addition, observed open containers containing used oil filters & drip fluids. Better housekeeping recommended ﾿ transfer all waste fluids & used filters into sealed containers. E & S control improvements observed along lower well site access road near stream crossing. Recent heavy rains did cause sediment wash out onto a wooded bench from well access road immediately below well pad. Operator agreed to immediately add additional E & S controls below wash out area + rework road
1779562 2009-02-13 No Violations Noted sit pit e/s ok, down for cement time
1849187 2009-12-11 No Violations Noted review for cacp
1852797 2009-12-31 No Violations Noted
1852798 2009-01-05 No Violations Noted

For data sources see[3]

References