X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-051-24310"

m
m
Line 95: Line 95:
 
|-
 
|-
 
| 2011
 
| 2011
| [[ATLAS RESOURCES LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 1,126,169.00
 
| style="text-align: right;" | 1,126,169.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
Line 185: Line 185:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 190: Line 191:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-S02
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 220.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 870.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 510.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 115.00 Bbl
+
| style="text-align: right;" | 220.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| 301353
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 208: Line 219:
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-S02
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 228.00 Bbl
+
| Produced Fluid (in Barrels)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 199.00 Bbl
| PA0091472
+
| IDENTIFY METHOD IN COMMENTS
 +
| 34-167-29359
 
|-
 
|-
| 2010-S02
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 870.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 101.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| PA0101508
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 510.00 Bbl
+
| style="text-align: right;" | 794.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 115.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
| PA0091472
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 232: Line 254:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2010-S02
+
| 2010
| Produced Fluid (in Barrels)
+
| [[ATLAS RESOURCES LLC]]
| style="text-align: right;" | 101.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 228.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0101508
+
| PA0091472
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[ATLAS RESOURCES LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 244: Line 268:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2010-S02
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 199.00 Bbl
+
| style="text-align: right;" | 292.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
| 34-167-29359
 
| 34-167-29359
 
|-
 
|-
| 2010-S02
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 794.00 Bbl
+
| style="text-align: right;" | 210.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 34-099-23127
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 6,945.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 345.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-2-3995
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 200.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 8,405.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 55.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,185.00 Bbl
 
| style="text-align: right;" | 1,185.00 Bbl
Line 262: Line 324:
 
| 101674
 
| 101674
 
|-
 
|-
| 2011-S01
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 6,945.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 245.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,705.00 Bbl
 
| style="text-align: right;" | 2,705.00 Bbl
Line 274: Line 338:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 595.00 Bbl
+
| style="text-align: right;" | 16,265.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
| PA0095273
+
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
Line 286: Line 352:
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 8,405.00 Bbl
+
| style="text-align: right;" | 595.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| PA0095273
 
|-
 
|-
| 2011-S01
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 16,265.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 245.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
|
 
|-
 
| 2011-S01
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 780.00 Bbl
 
| style="text-align: right;" | 780.00 Bbl
Line 310: Line 366:
 
| 301353
 
| 301353
 
|-
 
|-
| 2011-S01
+
| 2012
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 210.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-099-23127
 
|-
 
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 292.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| 34-167-29359
 
|-
 
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 55.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
|-
 
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 345.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-121-2-3995
 
|-
 
| 2011-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 200.00 Bbl
+
| style="text-align: right;" | 600.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 106.00 Bbl
 
| style="text-align: right;" | 106.00 Bbl
Line 346: Line 380:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2012-S01
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 135.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 465.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2013-S01
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
Line 364: Line 387:
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2013
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 459.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2013-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 376: Line 394:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2013-S02
+
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 195.00 Bbl
+
| style="text-align: right;" | 654.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 35.00 Bbl
+
| style="text-align: right;" | 3,032.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
|-
 
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,942.00 Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 50.00 Bbl
+
| style="text-align: right;" | 85.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2014-S02
+
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,090.00 Bbl
+
| style="text-align: right;" | 2,543.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2015
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,085.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2015-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 0.01 Bbl
 
| style="text-align: right;" | 0.01 Bbl
Line 418: Line 429:
 
| 100172
 
| 100172
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 1,458.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,800.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,719.08 Bbl
 
| style="text-align: right;" | 1,719.08 Bbl
Line 436: Line 436:
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2016-S02
+
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 280.01 Bbl
+
| style="text-align: right;" | 2,080.01 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M01
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 222.50 Bbl
+
| style="text-align: right;" | 180.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| WMGR123SW019
+
|  
 
|-
 
|-
| 2017-M02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 280.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
|-
 
| 2017-M07
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 44.00 Bbl
 
| style="text-align: right;" | 44.00 Bbl
Line 472: Line 457:
 
| 34-119-28776
 
| 34-119-28776
 
|-
 
|-
| 2017-M07
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 112.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 109.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 65.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M09
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 335.00 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 170.00 Bbl
 
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2017-M12
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 165.00 Bbl
+
| style="text-align: right;" | 667.50 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 51.50 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW019
 
| WMGR123SW019
 
|-
 
|-
| 2018-M01
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align: right;" | 102.50 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 55.00 Bbl
+
| style="text-align: right;" | 221.50 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M03
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 56.00 Bbl
+
| style="text-align: right;" | 51.50 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| WMGR123SW019
 
|-
 
|-
| 2018-M04
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 111.00 Bbl
+
| style="text-align: right;" | 280.00 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 112.50 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M05
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 59.00 Bbl
+
| style="text-align: right;" | 603.50 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M06
+
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 709.50 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018-M07
+
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 465.00 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.50 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 105.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 112.50 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 112.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 350.00 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 04:36, 21 August 2019

Well Details

Well ID: 37-051-24310
Loading map...
Country: United States
State: Pennsylvania
County: Fayette
Municipality: Washington Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148320
Farm/Lease Name: FAYETTE BEAGLE CLUB UNIT 6H
License Status: Active
Spud Date: 2010-04-27
Permit Date: 2010-01-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.102789
Longitude: -79.793503

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 3,537.00 62 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 1,126,169.00 365 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 562,304.00 366 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 415,057.00 365 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 359,450.00 334 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 297,318.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 251,951.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 175,748.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 72,363.00 153 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 39,000.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 ATLAS RESOURCES LLC Fracing Fluid Waste (in Barrels) 870.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 510.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Drilling Fluid Waste (in Barrels) 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Fracing Fluid Waste (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 199.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 101.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 794.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 ATLAS RESOURCES LLC Drilling Fluid Waste (in Barrels) 115.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 ATLAS RESOURCES LLC Fracing Fluid Waste (in Barrels) 228.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010 ATLAS RESOURCES LLC Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 292.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 210.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 6,945.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 345.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 200.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 8,405.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 1,185.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 245.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 2,705.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 16,265.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 595.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2012 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 600.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 106.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 55.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 654.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 3,032.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 85.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 2,543.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) 0.01 Bbl LANDFILL 100172
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 1,719.08 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 2,080.01 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 180.00 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 44.00 Bbl INJECTION DISPOSAL WELL 34-119-28776
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 335.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 667.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 221.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 51.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 280.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 603.50 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 709.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid (in Barrels) RWC 802 465.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1885166 Primary Facility 2010-05-13 Drilling/Alteration No Violations Noted
1893292 Primary Facility 2010-06-08 Routine/Complete Inspection No Violations Noted
1952050 Primary Facility 2011-02-24 Routine/Complete Inspection No Violations Noted
1963481 Primary Facility 2011-04-05 Routine/Complete Inspection No Violations Noted
1981722 Primary Facility 2011-06-20 Site Restoration No Violations Noted
2081194 Primary Facility 2012-06-26 Routine/Complete Inspection No Violations Noted Site ID sign and E&S plan on site. Equipment looked in good shape, no leaks.
2274659 Primary Facility 2014-05-28 Routine/Complete Inspection No Violations Noted 2 wells onsite and producing. 4 tanks and e&s ok.
2735837 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted Well appears to be in production and properly equipped. On site inspection shows no apparent violations. NOVIO

For data sources see[6]

References