X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24372

Well Details

Well ID: 37-051-24372
Loading map...
County: Fayette
Municipality: Redstone Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148606
Farm/Lease Name: JACKSON FARMS UNIT 39H
First Permit Date: 2010-07-08
Last Permit Date: 2010-07-08
Spud Date: 2010-08-12
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.96908
Longitude: -79.838602

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 50046.0 56.0 0.0 0.0 0.0 0.0
2011-2 548196.0 184.0 0.0 0.0 0.0 0.0
2012-1 474449.0 182.0 0.0 0.0 0.0 0.0
2012-2 293073.0 184.0 0.0 0.0 0.0 0.0
2013-1 211651.0 181.0 0.0 0.0 0.0 0.0
2013-2 225732.0 184.0 0.0 0.0 0.0 0.0
2014-1 180660.0 181.0 0.0 0.0 0.0 0.0
2014-2 152191.0 153.0 0.0 0.0 0.0 0.0
2015-02 19187.0 28.0 0.0 0.0 0.0 0.0
2015-01 20896.0 31.0 0.0 0.0 0.0 0.0
2015-03 23461.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2010-2 DRILLING FLUID WASTE 142.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2010-2 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 DRILLING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-2 FRACING FLUID WASTE 142.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2010-2 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 FRACING FLUID WASTE 8.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-1 PRODUCED FLUID 230.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE HUNTER DISPOSAL DEXTER CITY OH
2011-1 PRODUCED FLUID 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 50.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 FRACING FLUID WASTE 14.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 PRODUCED FLUID 1.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 PRODUCED FLUID 395.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 600.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 220.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 470.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FRACING FLUID WASTE 166.7 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 887.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 330.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 513.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 236.67 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1910087 2010-08-20 No Violations Noted HORIZONTAL MARCELLUS, TWO BASKETS USED DURING A BALANCE JOB ON 2ND MINE,HAVE GOOD FREE BOARD,SITE LOOKS GOOD,E&S GOOD.
1910867 2010-09-02 No Violations Noted HORIZONTAL MARCELLUS, TOP HOLE STRINGS COMPLETED, MOVING TO 37-H ON SAME PAD.
1916481 2010-09-24 No Violations Noted HORIZONTAL MARCELLUS,TD (9/24/2010) SET KICK PLUG @7007'. MOVING TO 38 -H (9/25/2010).
1938010 2010-09-06 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON -325 MOVING ON SOON. TOP HOLE FINISH BY NOMAC - 230. PITS AND E&S ARE IN GOOD CONDITION. HOLE FILLED WITH HEAVY MUD AND CAPPED.
1938012 2010-11-24 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON - 325 WALKING OVER TO 39 -H PAD. PITS AND E&S IN GOOD CONDITION. RIGGING UP AND STARTING TO DRIILNG.
1938014 2010-12-01 No Violations Noted HORIZONTAL MARCELLUS, PATTERSON -325 HAS TD, RUNNING 5 1/5" PROD, STRING TODAY.CIRCULATE AND START CEMENTING PROCEDURES. PITS AND E&S IN GOOD CONDITION.
1945294 2011-01-26 No Violations Noted
2095453 2012-08-27 No Violations Noted Site restored and in production, site ID sign in place, access road in good shape, tanks in secondary containment, no visible leaks.
2211952 2013-10-09 No Violations Noted Act 9 sign up, wells labeled, tanks in containment, no E&S issues.
2339847 2015-01-30 No Violations Noted 3 wells equipped for production. 6 tanks onsite. Site snow covered.

For data sources see[3]

References