X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-051-24392

Well Details

Well ID: 37-051-24392
Loading map...
County: Fayette
Municipality: German Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148144
Farm/Lease Name: CROUSHORE 10H
First Permit Date: 2010-09-27
Last Permit Date: 2010-09-27
Spud Date: 2010-11-04
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.90288
Longitude: -79.908738

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 186626.0 79.0 0.0 0.0 0.0 0.0
2012-1 211316.0 182.0 0.0 0.0 0.0 0.0
2012-2 179556.0 184.0 0.0 0.0 0.0 0.0
2013-1 126134.0 181.0 0.0 0.0 0.0 0.0
2013-2 77167.0 184.0 0.0 0.0 0.0 0.0
2014-1 100113.0 181.0 0.0 0.0 0.0 0.0
2014-2 72055.0 153.0 60.0 153.0 0.0 0.0
2015-02 12627.0 28.0 0.0 0.0 0.0 0.0
2015-01 14749.0 31.0 0.0 0.0 0.0 0.0
2015-03 12678.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2010-2 DRILLING FLUID WASTE 13.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2010-2 DRILLING FLUID WASTE 2.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-1 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2011-1 DRILLING FLUID WASTE 130.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 FRACING FLUID WASTE 7.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 FRACING FLUID WASTE 24.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 FRACING FLUID WASTE 5.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 130.0 Bbl LANDFILL SWF 1032-WV0109 WASTE MANAGEMENT, INC - MEADOWFILL LANDFILL BRIDGEMENT WV
2011-2 PRODUCED FLUID 7.0 Bbl INJECTION DISPOSAL WELL 34-121-2-3995 HUNTERS SWIW #5 RENO OH
2011-2 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 PRODUCED FLUID 2.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL DEXTER CITY OH
2012-2 PRODUCED FLUID 4.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 954.33 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 476.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 PRODUCED FLUID 20.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1938090 2010-11-08 No Violations Noted HORIZONTAL MARCELLUS, ROCKY MOUNTAIN DRILLING # 1 DRILLING AND SETTING CONDUTOR 11/7/2010. E&S ARE IN GOOD CONDITION. WHIPSTOCK# 17 MOVING ON 11/8 2010.
1938092 2010-11-09 No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.CEMENTING 16"@ 6:00 PM TONIGHT.
1938095 2010-11-13 No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.SUCCESSFULLY CEMENTED 11 3/4" CASING STRING .STARTED @ 5:00 PM (11/12/2010). BUMB PLUG 8:15 PM ,FLOATS HELD. PITS ARE GOOD.
1938098 2010-11-18 No Violations Noted HORIZONTAL MARCELLUS, WHIPSTOCK # 17. E&S ARE IN GOOD CONDITION.PITS ARE IN GOOD CONDITION. PREPAIRING TO CEMENT 8 5/8" INTERMEDIATE CASING TONIGHT.
1943654 2010-01-07 No Violations Noted HORIZONTAL MARCELLUS, NOMAC -230 MOVING OFF (1/7/2010 ) @ MUDDED AND SECURE CAP ON WELL. PATTERSON -227 MOVING ON STARTING 1/10/2010 (NEW-RIG ).
1948352 2011-02-07 No Violations Noted
1955531 2011-03-08 No Violations Noted
1958157 2011-02-25 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION. SKIDDED OVER RIGGED UP STARTED DRILLING,PRESENT DEPTH @ 6020' TODAY.
1958186 2011-03-08 No Violations Noted HORIZONTAL MARCELLUS, E&S AND PITS ARE IN GOOD CONDITION.DRILLIND @ 8855' PREPAIRING PLUG BACK TO KICK OFF TO REACH LOWER MARCELLUS FORMATION.REPORTED SPILL IN HOPPER HOUSE WHERE VALVE WAS LEFT CRACK OPEN.IT SPRAY THE ENTIRE BUILDING INSIDE WITH BIO -DEGADEABLE MUD. THE DOORS WERE ALL CLOSED AT TIME. SMALL AMOUNT MUD REACHED THE CONTAIMENT AREA WHILE PRESSURE CLEANING AND RETRIEVING FLUIDS FROM INSIDE THE HOPPER HOUSE. SITE IS ALL CLEAN UP. WILL BE MONITORED DAILY BY CO. MAN AND ATLAS ENVIRONMENTAL PERSONNEL. MY BEST GUESS ESTIMATED IS UNDER 5 GALLONS OF FLUID. NO VIOLATIONS DEEMED WARRANT AT PRESENT TIME.
1961127 2011-03-28 No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION. WELL DRILLING COMPLETED 3/19/2011. CEMENTING PROD. STRING 3/20/2011.RIG STARTED MOVING TO NEW LOCATION 3/22/2011.
1961204 2011-02-02 No Violations Noted HORIZONTAL MARCELLUS,E&S AND PITS LOOK IN GOOD CONDITION.CONDUTOR CEMENTED IN @ 48' OF 24" CASING.
1964316 2011-04-06 No Violations Noted
1984802 2011-06-27 No Violations Noted
1989860 2011-07-20 No Violations Noted
2029225 2011-12-21 No Violations Noted Met onsite with Chevron representative Chad Eisenman. Drilling had been completed, well appeared tohave been equipped for production. Site grading work was in the process of being completed. Discussed final site restoration with Mr. Eisenmann while onsite. Site will be temporarily stabilized during the winter months and in the spring of 2012 final restoration will be completed.
2101453 2012-09-18 No Violations Noted Site ID sign in place, site fenced and gated, tanks in containment, wells labeled.

For data sources see[3]

References