If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-23135 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.94336,"lon":-80.352834,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Morris Township | |
Operator Name: PENNECO OIL CO INC | |
Well Pad ID: | |
Farm/Lease Name: CROUSE 1 | |
License Status: Plugged OG Well | |
Spud Date: 12/18/2001 | |
Permit Date: 11/20/2001 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 39.943360 | |
Longitude: -80.352834 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2003 | 0.00 | 0.00 | 0.00 | ||||
2010 | 0.00 | 0.00 | 0.00 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1101632 | Primary Facility | 02/26/2002 | Routine/Complete Inspection | No Violations Noted | Gravel egress to road, bench cut well drilled, cutting pit loined, awaiting fracing. Yost roll-off tank on location, orange construction fence on perimeter to help isolate pasture animals from the location disturbed area. Topsoil stockpiled. Brush is piled & accumulated. Muddy conditions. |
1110902 | Primary Facility | 03/26/2002 | Routine/Complete Inspection | No Violations Noted | Raining hard, rig up servicing well. Frac pits are lined & freeboard ok. Ditching is acommodating run-off at bench. Gravel is placed at egress & storage turn-a-round. E & S controls working here in flash flood condition.s |
1144806 | Primary Facility | 06/21/2002 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Plugging in prep. Preliminary restoration work taking place, re. grading. Pit being closed, second pit for plugging , backhole & dozer on site. |
1170847 | Primary Facility | 09/24/2002 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Plugged w/vent pipe monument, restored to contour, seeded, is revegetated, some equip. here.. a roll-off tank parked at site, erosion is negligible. |
For data sources see[5]