X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-23200

Well Details

Well ID: 37-059-23200
Loading map...
County: Greene
Municipality: Franklin Township
Operator Name: CNX GAS CO LLC
Well Pad ID:
Farm/Lease Name: W BLAIR 2
First Permit Date: 2002-07-17
Last Permit Date: 2003-07-03
Spud Date: 2003-08-11
Unconventional: No
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 39.86216
Longitude: -80.213074

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2002-0 0.0 0.0 0.0 0.0 0.0 0.0
2003-0 3963.0 365.0 0.0 0.0 0.0 0.0
2005-0 2372.0 365.0 0.0 0.0 0.0 0.0
2006-0 6914.0 365.0 0.0 0.0 0.0 0.0
2007-0 7744.0 365.0 0.0 0.0 0.0 0.0
2008-0 7596.0 365.0 0.0 0.0 0.0 0.0
2009-0 6596.0 365.0 0.0 0.0 0.0 0.0
2010-0 3537.0 365.0 0.0 0.0 0.0 0.0
2011-0 6904.0 365.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2012-0 7017.0 366.0 0.0 0.0 0.0 0.0
2013-0 6815.78 365.0 0.0 0.0 0.0 0.0
2014-0 4773.47 365.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2003-0 DRILLING 154.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2008-0 BRINE 50.81 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0026034 DORNICK PT SEWAGE TREATMENT PLANT JOHNSTOWN PA
2009-0 BRINE 25.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2010-0 PRODUCED FLUID 28.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1264909 2003-08-28 No Violations Noted Site ID/plan at entrance, construction barrier fence is on far end of parking lot loc. Wellhead is established, nippled, tank set on site, cutting pit lined, containing cuttings& water. Two pipe trailers are on site. Ongoing site development of well continues.

For data sources see[3]

References