X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-24111

Well Details

Well ID: 37-059-24111
Loading map...
Operator Name: ATLAS RESOURCES LLC
First Permit Date: 2006-12-12
Last Permit Date: 2006-12-12
Spud Date: 2007-03-29
Unconventional: No
Horizontal: No
Violations: 1
Latitude: 39.923637
Longitude: -79.992694

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 1348.0 268.0 0.0 0.0 0.0 0.0
2012-0 301.0 366.0 0.0 0.0 0.0 0.0
2011-0 7135.0 47.0 0.0 0.0 0.0 0.0
2010-0 6172.0 365.0 0.0 0.0 0.0 0.0
2009-0 9257.0 365.0 0.0 0.0 0.0 0.0
2008-0 18919.0 175.0 0.0 0.0 0.0 0.0
2007-0 2127.0 175.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2008-0 BRINE 1365.0 Bbl MUNICIPAL SEWAGE TREATMENT PLANT CHARLEROI BORO STP
2008-0 BRINE 1365.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT WAYNESBURG BORO BRINE TRT

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1671781 2007-04-17 No Violations Noted DRILLING COMPLETE - PIT AND E/S OK
1699091 2008-04-10 Violation(s) Noted A CACP will be issued as a result of this violation at a later date 536778
1699091 2008-04-10 Violation(s) Noted A CACP will be issued as a result of this violation at a later date 536778
1804832 2008-05-29 No Violations Noted Compliance Evaluation inspection in response to DEP 4/10/08 restoration inspection & NOV. Atlas did submit a NOV response letter dated 5/1/08 ¿ letter stated site restored + E & S controls reestablished. Inspection confirmed restoration & E & S control work. Vegetation is adequate; however there is an erosion problem on hillside below well pad. It appears that area upslope of well pad + a portion of the access road drainage are being diverted over hillside below well. I contacted Tim Berdar who agreed to rework well pad drainage & erosion pathway. E & S controls are effective ¿ no E & S problems observed outside of BMP controls. Please call me at 724 769 1054 when drainage issues & erosion problem is corrected
1849185 2009-12-10 No Violations Noted review for cacp

References