| Well ID: 37-059-24798
 
| Well ID: 37-059-24798
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.815108, -80.004555 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.815108, -80.004555 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Greene County, Pennsylvania|Greene]]
 
| County: [[Greene County, Pennsylvania|Greene]]

Revision as of 19:25, 28 June 2014

Well Details

Well ID: 37-059-24798
Loading map...
County: Greene
Municipality: Greene Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 148475
Farm/Lease Name: HARDIE UNIT 1H
First Permit Date: 2008-05-21
Last Permit Date: 2010-03-02
Spud Date: 2008-08-15
Unconventional: Yes
Horizontal: Yes
Producing: Yes
Violations: 4
Latitude: 39.815108
Longitude: -80.004555

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1849194 2009-12-11 No Violations Noted review file
1946821 2010-12-08 Violation(s) Noted Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. 603863
1946821 2010-12-08 Violation(s) Noted Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. 603864
1946821 2010-12-08 Violation(s) Noted Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. 603865
1946821 2010-12-08 Violation(s) Noted Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. 603866
1974880 2011-03-29 No Violations Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The site is in over-all good condition. The collection channel at the toe of the fill slope needs to be addressed. The channel appears to be caving in on itself and may need some additional rock placed in the channel to keep any sediment out of the private pond directly down-gradient.

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-2 216156.07 183.0 0.0 0.0 0.0 0.0
2012-1 250554.2 177.0 0.0 0.0 0.0 0.0
2011-2 325441.0 183.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 476770.0 181.0 0.0 0.0 0.0 0.0
2011-0 707757.61 365.0 0.0 0.0 0.0 0.0
2010-2 30235.0 13.0 0.0 13.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 PRODUCED FLUID 319.6 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING
2008-0 DRILLING 680.0 Bbl OTHER NOT LISTED
2008-0 FRACKING FLUID 595.0 Bbl OTHER NOT LISTED
2009-0 DRILLING 120.0 Bbl OTHER NOT LISTED
2011-0 PRODUCED FLUID 89450.8 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2011-1 PRODUCED FLUID 2267.19 Bbl REUSE OTHER THAN ROAD SPREADING FRAC WATER REUSE PA
2011-1 PRODUCED FLUID 53.5 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS COMPANY SALTSBURG PA
2011-2 PRODUCED FLUID 1101.33 Bbl REUSE OTHER THAN ROAD SPREADING REUSE OF BRINE TO FRAC A WELL
2012-1 PRODUCED FLUID 561.5 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR HYDRAULIC FRACTURING

References