If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
| Well ID: 37-059-24798 | | Well ID: 37-059-24798 | ||
− | | style=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 39.815108, -80.004555 | width=100% | height=100% }} |
|- | |- | ||
| County: [[Greene County, Pennsylvania|Greene]] | | County: [[Greene County, Pennsylvania|Greene]] |
Well ID: 37-059-24798 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.815108,"lon":-80.004555,"icon":""}]} |
County: Greene | |
Municipality: Greene Township | |
Operator Name: RANGE RESOURCES APPALACHIA LLC | |
Well Pad ID: 148475 | |
Farm/Lease Name: HARDIE UNIT 1H | |
First Permit Date: 2008-05-21 | |
Last Permit Date: 2010-03-02 | |
Spud Date: 2008-08-15 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 4 | |
Latitude: 39.815108 | |
Longitude: -80.004555 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1849194 | 2009-12-11 | No Violations Noted | review file | |
1946821 | 2010-12-08 | Violation(s) Noted | Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. | 603863 |
1946821 | 2010-12-08 | Violation(s) Noted | Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. | 603864 |
1946821 | 2010-12-08 | Violation(s) Noted | Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. | 603865 |
1946821 | 2010-12-08 | Violation(s) Noted | Rick Palmer and I inspected this site for OG Dam permit application (95-7-60915-13). There are many buildings within 200 ft of the impoundment. The failure of this impoundment will impact the inhabited structures, cause serious property damage, and/or flood roadways. In case of ESCGP-1 (ESX10-059-0020), the emergency spillway of a sediment trap (near at LDZ-1) shall be revised properly to the existing bank to bank swale or stream. In addition, we found 4 inch pipelines was on the ground, on the stream bed, cross the Whiteley Creek (~30ft width), and Reverin Wetland (R5UBH, 27.46 acres) without Chapter 105 permit. See the details attached. | 603866 |
1974880 | 2011-03-29 | No Violations Noted | The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The site is in over-all good condition. The collection channel at the toe of the fill slope needs to be addressed. The channel appears to be caving in on itself and may need some additional rock placed in the channel to keep any sediment out of the private pond directly down-gradient. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 216156.07 | 183.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 250554.2 | 177.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 325441.0 | 183.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 476770.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 707757.61 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 30235.0 | 13.0 | 0.0 | 13.0 | 0.0 | 0.0 |
2010-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 319.6 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2008-0 | DRILLING | 680.0 | Bbl | OTHER | NOT LISTED | |||
2008-0 | FRACKING FLUID | 595.0 | Bbl | OTHER | NOT LISTED | |||
2009-0 | DRILLING | 120.0 | Bbl | OTHER | NOT LISTED | |||
2011-0 | PRODUCED FLUID | 89450.8 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2011-1 | PRODUCED FLUID | 2267.19 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2011-1 | PRODUCED FLUID | 53.5 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-2 | PRODUCED FLUID | 1101.33 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE OF BRINE TO FRAC A WELL | |||
2012-1 | PRODUCED FLUID | 561.5 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |