X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25208

Well Details

Well ID: 37-059-25208
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jefferson Township
Operator Name: GREYLOCK PROD LLC
Well Pad ID: 149312
Farm/Lease Name: SKIB 5MH
License Status: Active
Spud Date: 2009-08-04
Permit Date: 2009-05-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.896363
Longitude: -80.069470

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 ENERGY CORP OF AMER 308,638.50 120 0.00 0 0.00 0
2011 ENERGY CORP OF AMER 633,683.00 362 0.00 0 0.00 0
2012 ENERGY CORP OF AMER 392,224.00 353 0.00 0 0.00 0
2013 ENERGY CORP OF AMER 253,654.00 365 0.00 0 0.00 0
2014 ENERGY CORP OF AMER 236,180.00 354 0.00 0 0.00 0
2015 ENERGY CORP OF AMER 217,537.00 359 0.00 0 0.00 0
2016 ENERGY CORP OF AMER 121,440.00 340 0.00 0 0.00 0
2017 ENERGY CORP OF AMER 151,106.00 360 0.00 0 0.00 0
2018 ENERGY CORP OF AMER 140,367.00 331 0.00 0 0.00 0
2019 GREYLOCK PROD LLC 31,661.00 84 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Produced Fluid (in Barrels) 88.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-A01 Produced Fluid (in Barrels) 405.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010-S01 Produced Fluid (in Barrels) 44.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S01 Produced Fluid (in Barrels) 202.50 Bbl REUSE OTHER THAN ROAD SPREADING
2010-S02 Produced Fluid (in Barrels) 1,285.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Produced Fluid (in Barrels) 1,261.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Produced Fluid (in Barrels) 375.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2011-S02 Drill Cuttings (in Tons) 6.62 Tons LANDFILL 100172
2011-S02 Fracturing Fluid Waste (in Tons) 2.97 Tons LANDFILL 100172
2011-S02 Produced Fluid (in Barrels) 1,067.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 225.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 345.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 394.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 90.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 413.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 334.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 40.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Produced Fluid (in Barrels) 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015-S02 Produced Fluid (in Barrels) 185.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S01 Produced Fluid (in Barrels) RWC 802 130.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2016-S01 Produced Fluid (in Barrels) RWC 802 37.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 6.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2016-S02 Produced Fluid (in Barrels) RWC 802 57.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016-S02 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M02 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 35.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 45.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 50.00 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 26.00 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 42.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M03 Produced Fluid (in Barrels) RWC 802 79.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M05 Produced Fluid (in Barrels) RWC 802 67.00 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 21.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 68.00 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 40.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-M11 Produced Fluid (in Barrels) RWC 802 50.00 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018-M12 Produced Fluid (in Barrels) RWC 802 46.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M02 Produced Fluid (in Barrels) RWC 802 43.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2019-M03 Produced Fluid (in Barrels) RWC 802 37.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1836401 Primary Facility 2009-08-10 Drilling/Alteration No Violations Noted SITE, PIT, E&S, OK, AT THIS MARCELLUS SITE.
1911269 Primary Facility 2010-08-09 Routine/Complete Inspection No Violations Noted
2008086 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted well drilled and in line; location restored; E&S good
2016938 Primary Facility 2011-10-11 Drilling/Alteration No Violations Noted WELL IS HOOKED UP AND PRODUCING.
2415734 Primary Facility 2015-09-04 Routine/Partial Inspection No Violations Noted On 9/4/15, I inspected the Skib A and B Pads with DEP Engineer Dr. Tae-Uk Kim and DEP Biologist Samantha Sullivan and made the following observations:
2448923 Primary Facility 2016-02-05 Compliance Evaluation No Violations Noted On 2/5/16, I performed a compliance evaluation inspection at the Skib A & B Unit Site in response to a previous inspection from 9/4/15 (2415691) that resulted in multiple violations and made the following observations:

•Inconsistencies in pad construction and unmarked wetland areas have been addressed… •At the time of inspection the impoundment on site was full with the liner in place… •The non-permitted access road noted during the 9/4/15 inspection was reported by ECA to be… •The sediment trap that was found to previously be in poor condition had been renovated…

Conclusion: •All violations noted in NOV from the 9/4/15 inspection appear to have been satisfactorily resolved. •No additional violations were noted at the time of inspection. Issues related to the impoundment will be followed up on in summer 2016.

For data sources see[6]

References