X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25261"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-059-25261
 
| Well ID: 37-059-25261
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.857139, -80.431472 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.857139, -80.431472 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: BEHM 49-1
 
| Farm/Lease Name: BEHM 49-1
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2011-02-10
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2009-07-24
 
| Permit Date: 2009-07-24
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.857139
 
| Latitude: 39.857139
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-07-24
 +
| New Permit Application
 +
|-
 +
| 2010-07-14
 +
| Permit Renewal Application
 +
|-
 +
| 2011-02-10
 +
| Performed Spud Operation
 +
|-
 +
| 2011-02-16
 +
| Drilling Completion
 +
|-
 +
| 2011-05-25
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 163: Line 204:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[PATRIOT EXPLORATION CORP]]
 +
| style="text-align: right;" | 1,170.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 103.00
 +
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 184: Line 234:
 
| 2011
 
| 2011
 
| [[PATRIOT EXPLORATION CORP]]
 
| [[PATRIOT EXPLORATION CORP]]
| Produced Fluid (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 687.60 Bbl
+
| style="text-align: right;" | 324.28 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
Line 191: Line 241:
 
| 2011
 
| 2011
 
| [[PATRIOT EXPLORATION CORP]]
 
| [[PATRIOT EXPLORATION CORP]]
| Drilling Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 324.28 Bbl
+
| style="text-align: right;" | 687.60 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0254185
 
| PA0254185
Line 198: Line 248:
 
| 2013
 
| 2013
 
| [[PATRIOT EXPLORATION CORP]]
 
| [[PATRIOT EXPLORATION CORP]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 45 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2013
 +
| [[PATRIOT EXPLORATION CORP]]
 +
| Produced Fluid
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 205: Line 262:
 
| 2017
 
| 2017
 
| [[PATRIOT EXPLORATION CORP]]
 
| [[PATRIOT EXPLORATION CORP]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 +
|-
 +
| 2019
 +
| [[PATRIOT EXPLORATION CORP]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 
|-
 
|-
 
|}
 
|}
Line 269: Line 333:
 
|-
 
|-
 
|}
 
|}
<!--==== Penalties Applied ====
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 280: Line 344:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 605541
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 605542
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Revision as of 20:18, 14 May 2020

Well Details

Well ID: 37-059-25261
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Richhill Township
Operator Name: PATRIOT EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: BEHM 49-1
License Status:
Spud Date:
Permit Date: 2009-07-24
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 39.857139
Longitude: -80.431472

For data sources see[1][2][3]

Well History

Date Event
2009-07-24 New Permit Application
2010-07-14 Permit Renewal Application
2011-02-10 Performed Spud Operation
2011-02-16 Drilling Completion
2011-05-25 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2011 PENNECO OIL CO INC 0.00 0 0.00 0 0.00 0
2012 PATRIOT EXPLORATION CORP 375.00 25 90.00 365 0.00 0
2013 PATRIOT EXPLORATION CORP 1,747.00 365 125.16 365 0.00 0
2014 PATRIOT EXPLORATION CORP 1,401.00 365 66.39 365 0.00 0
2015 PATRIOT EXPLORATION CORP 1,022.00 365 88.00 365 0.00 0
2016 PATRIOT EXPLORATION CORP 1,940.00 365 89.00 365 0.00 0
2017 PATRIOT EXPLORATION CORP 2,971.00 365 82.00 365 0.00 0
2018 PATRIOT EXPLORATION CORP 2,365.00 365 0.00 0 0.00 0
2019 PATRIOT EXPLORATION CORP 1,170.00 365 103.00 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 PATRIOT EXPLORATION CORP Drilling Fluid Waste 324.28 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 PATRIOT EXPLORATION CORP Produced Fluid 687.60 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013 PATRIOT EXPLORATION CORP Produced Fluid 45 Bbl CENT WASTE TRT FAC NPDES PA0095273
2013 PATRIOT EXPLORATION CORP Produced Fluid 45.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017 PATRIOT EXPLORATION CORP Produced Fluid 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2019 PATRIOT EXPLORATION CORP Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1952973 Primary Facility 2011-02-28 Routine/Complete Inspection Violation(s) Noted
2154697 Primary Facility 2013-03-28 Routine/Complete Inspection No Violations Noted I stopped at Patriot Exploration’s Behm-49-1-RH for an inspection. The site was fairly well vegetated and there is a small badge identifying the site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1952973 605541 02/28/2011 2011-02-28 78.53* - Failure to implement and maintain BMPs in accordance with Chapter 102. Administrative
1952973 605542 02/28/2011 2011-02-28 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
605541
605542

For data sources see[7]

References