X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-059-25668

Well Details

Well ID: 37-059-25668
Loading map...
County: Greene
Municipality: Monongahela Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 147875
Farm/Lease Name: BURCHIANTI UNIT 60H
First Permit Date: 2011-01-28
Last Permit Date: 2011-01-28
Spud Date: 2011-02-10
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.848219
Longitude: -79.970994

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 5348.0 30.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 832034.0 184.0 0.0 0.0 0.0 0.0
2013-1 444544.0 181.0 0.0 0.0 0.0 0.0
2013-2 240469.0 184.0 0.0 0.0 0.0 0.0
2014-1 365807.0 181.0 0.0 0.0 0.0 0.0
2014-2 340698.0 153.0 0.0 0.0 0.0 0.0
2015-02 43608.0 28.0 0.0 0.0 0.0 0.0
2015-01 49474.0 31.0 0.0 0.0 0.0 0.0
2015-03 46479.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILLING FLUID WASTE 375.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAR000519462 ADVANCED WASTE SERVICES OF PA LLC NEW CASTLE PA
2011-1 DRILLING FLUID WASTE 550.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508 FLUID RECOVERY SERVICE FRANKLIN FACILITY FRANKLIN PA
2011-1 DRILLING FLUID WASTE 775.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273 FLUID RECOVERY SERVICE JOSEPHINE FACILITY JOSEPHINE PA
2011-1 DRILLING FLUID WASTE 7.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472 TUNNELTON LIQUIDS TREATMENT FACILITY SALTSBURG PA
2011-1 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2011-2 DRILLING FLUID WASTE 6.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 110.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-1 FRACING FLUID WASTE 25.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 FRACING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FLOWBACK FRACTURING SAND 97.21 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2012-2 FRACING FLUID WASTE 2.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-2 PRODUCED FLUID 5.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 3.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 PRODUCED FLUID 310.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 315.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 250.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2014-1 PRODUCED FLUID 822.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 PRODUCED FLUID 15.0 Bbl INJECTION DISPOSAL WELL 34-121-23995 WARREN DRILLING CO #1 (SWIW #6) DEXTER CITY OH
2014-2 PRODUCED FLUID 505.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1950464 2011-02-15 No Violations Noted Rig had 30 to drill to run pipe and cement 16" Pits were in good order 8 Ft free Board No Violations .
2107389 2012-10-04 No Violations Noted The Department was at the above referenced Marcellus Well to conduct a Routine Inspection. The operator is currently placing silt fence around the entire site because the silt sock was removed too early in a few places. The These four wells are drilled and in production. The site has obtained temp. stabilization. The operator also contacted the Department about giving Atlas their access road back to their conventional well so they do not have to cross the Chevron Marcellus site every time they go to the well. The Department reviewed the E/S Plan and approved the minor modification for the access road. The modification is inside the original limits of disturbance and inside of the ESCGP-1 BMP's. The minor modification was approved in the field and/or by email.
2112684 2012-10-31 No Violations Noted The Department was at the above referenced well to conduct a routine inspection. This inspection was conducted after a heavy rain event. Grass is growing on site and considered temporary stabilized. The Operator replaced the E/S Controls on site because they were removed before the site was permanently stabilized. The site does have some E/S concerns. The rain caused the fill slopes to start eroding and these will need re-graded before the problem gets worse. The Department recommends waiting for good dry weather to conduct any earth disturbance activities. The northern fill slope where the sediment trap was removed is also started to erode. The erosion is mainly at the base of the slope. The Operator may want to place temporary controls such as straw bales at the base of the northern slope to keep the sediment on site. Please contact the Department at the phone number listed below if you have any questions.

For data sources see[3]

References