If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 104: | Line 104: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity |
Well ID: 37-059-25938 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.895878,"lon":-80.100678,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Jefferson Township | |
Operator Name: VANTAGE ENERGY APPALACHIA LLC | |
Well Pad ID: | |
Farm/Lease Name: RIDGE ROAD 3H | |
License Status: | |
Spud Date: | |
Permit Date: 2012-02-14 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.895878 | |
Longitude: -80.100678 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | VANTAGE ENERGY APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2124965 | Primary Facility | 2012-12-11 | Routine/Complete Inspection | No Violations Noted | The Department was at the above referenced Marcellus Well site to conduct a pre operation inspection. A gas well was spudded on site before this inspection. This is a written warning that inspections must be conducted at all non-conventional well sites before being gas wells are spudded. The inspection results will be no violations with the pollution prevention noted as compliance assistance. The site is less than 5 acres and an ESCGP-1 was not obtained. An E/S plan was developed and the Operator is in the process of getting an ESCGP-1 because the gathering line and the well pad will be over 5 acres combined. The site is temporarily stabilized but the E/S Controls were removed. These controls have to be in place in accordance with the E/S Plan. If the land owner is farming the field, the E/S controls maybe temporarily removed; but will need replaced before the well site is restored. |
2175826 | Primary Facility | 2013-06-17 | Complaint Inspection | No Violations Noted | Pad constructed. No rig onsite. |
2559133 | Primary Facility | 2017-01-23 | Routine/Complete Inspection | No Violations Noted | On 01/23/17 at approximately 1400 hours I met with Bryan Morris of Rice Energy to discuss proposed changes to the site. The Ridge Road pad consists of a lower section that currently has wells on it and an upper section that is approximately 3-4’ higher and accessed by a gravel ramp.
Rice Energy requested redline approval to shift the ramp to the southeast and to convert a portion of the upper pad to the elevation of the lower pad to accommodate an oncoming drilling rig. It was proposed that the removed material would be placed next to the existing stockpile and silt sock be added on the eastern portion for erosion control. The redline changes were approved and it was requested that an as built drawing reflecting the changes be sent to the engineering section in Pittsburgh. |
2664746 | Primary Facility | 2017-11-02 | Routine/Partial Inspection | No Violations Noted | While reviewing an ESCGP 2 major modification/renewal Environmental Engineering Specialist Mohamed Sam observed that the wet pond called out in the approved PCSM plans was not installed. This WQS conducted a routine partial inspection and confirmed the wet pond had not been installed (see photographs).
Violations of 102.5(m)(4) and 102.5(f) have occurred as a result of the Operator failing to install PCSM per the approved plan. |