X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485110209020

Well Details

Well ID: 0485110209020
Loading map...
Location: 02/09-02-048-11W5/0
Location Alias: 02/09-02-48-11 W5M
Location Alias 2: 02/09-02-048-11 W5/00
Province: Alberta
County/Municipality: Brazeau County
Well Name: RIDGEBACK HZ 102 PEMBINA 9-2-48-11
Operator Name: Ridgeback Resources Inc.
License Number: 0487608
License Date: 2018-01-10
License Status: Issued
Spud Date: 2018-01-29
Final Drill Date: 2018-02-05
Well Total Depth: 3655 m
Surface Hole Latitude: 53.11628
Surface Hole Longitude: -115.515728

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
29 Jan 2018 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-02-01 1527
2018-02-02 2115 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-08 Open Hole/Barefoot Completion 3652 3655 0
2018-03-07 Multi-Stage Fracture 3630.6 3630.7 0
2018-03-07 Multi-Stage Fracture 3590.8 3590.9 0
2018-03-07 Multi-Stage Fracture 3552.2 3552.3 0
2018-03-07 Multi-Stage Fracture 3512.7 3512.8 0
2018-03-07 Multi-Stage Fracture 3484.6 3484.7 0
2018-03-07 Multi-Stage Fracture 3442.4 3442.5 0
2018-03-08 Multi-Stage Fracture 3401.6 3401.7 0
2018-03-08 Multi-Stage Fracture 3360 3360.1 0
2018-03-08 Multi-Stage Fracture 3333.4 3333.5 0
2018-03-08 Multi-Stage Fracture 3293.2 3293.3 0
2018-03-08 Multi-Stage Fracture 3253 3253.1 0
2018-03-08 Multi-Stage Fracture 3212.7 3212.8 0
2018-03-08 Multi-Stage Fracture 3172.4 3172.5 0
2018-03-08 Multi-Stage Fracture 3131.3 3131.4 0
2018-03-08 Multi-Stage Fracture 3103.2 3103.3 0
2018-03-08 Multi-Stage Fracture 3061.2 3061.3 0
2018-03-08 Multi-Stage Fracture 3020.5 3020.6 0
2018-03-08 Multi-Stage Fracture 2978.4 2978.5 0
2018-03-08 Multi-Stage Fracture 2950.7 2950.8 0
2018-03-08 Multi-Stage Fracture 2909.4 2909.5 0
2018-03-08 Multi-Stage Fracture 2868.8 2868.9 0
2018-03-08 Multi-Stage Fracture 2841.1 2841.2 0
2018-03-08 Multi-Stage Fracture 2799.6 2799.7 0
2018-03-08 Multi-Stage Fracture 2759 2759.1 0
2018-03-08 Multi-Stage Fracture 2730.9 2731 0
2018-03-08 Multi-Stage Fracture 2689.7 2689.8 0
2018-03-08 Multi-Stage Fracture 2648.3 2648.4 0
2018-03-08 Multi-Stage Fracture 2620.5 2620.6 0
2018-03-08 Multi-Stage Fracture 2580.6 2580.7 0
2018-03-08 Multi-Stage Fracture 2552.6 2552.7 0
2018-03-08 Multi-Stage Fracture 2512.8 2512.9 0
2018-03-08 Multi-Stage Fracture 2472.3 2472.4 0
2018-03-08 Multi-Stage Fracture 2445.2 2445.3 0
2018-03-08 Multi-Stage Fracture 2404.2 2404.3 0
2018-03-08 Multi-Stage Fracture 2363.6 2363.7 0
2018-03-08 Multi-Stage Fracture 2335.6 2335.7 0
2018-03-08 Multi-Stage Fracture 2296.3 2296.4 0
2018-03-08 Multi-Stage Fracture 2268.6 2268.7 0
2018-03-08 Multi-Stage Fracture 2239.7 2239.8 0
2018-03-08 Multi-Stage Fracture 2199.7 2199.8 0

For data sources see[5]

Fracking Activities

Start Date End Date Chemical Name CAS Number Purpose Job Percentage Supplier
03/07/2018 03/08/2018 Methanol 67-56-1 Surfactant 0.0964 Element
2-Dibromo. 3-Nitrilopropionamide 10222-01-2 Bactericide/Biocide 0.0099 Element

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
3/5/2018 0 3/8/2018 0:00 Surface Water - Lake 3539
3/2/2018 0 3/3/2018 0:00 Surface Water - Runoff 2545

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6502 1008.4 0.0 0.0
2019 2155 364.8 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-08 No Incident N/A N/A
2018-03-14 No Incident N/A N/A

For data sources see[9]

References