If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-059-26558 | | Well ID: 37-059-26558 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 39.890431, -80.247783 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: [[Center Township, | + | | State: Pennsylvania |
+ | |- | ||
+ | | County: [[Greene_County,_Pennsylvania|Greene]] | ||
+ | |- | ||
+ | | Municipality: [[Center Township,_Greene_County,_Pennsylvania|Center Township]] | ||
|- | |- | ||
| Operator Name: [[VANTAGE ENERGY APPALACHIA II LLC]] | | Operator Name: [[VANTAGE ENERGY APPALACHIA II LLC]] | ||
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
| Farm/Lease Name: SHUMAKER 10H | | Farm/Lease Name: SHUMAKER 10H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2014-06-12 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | Well | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: No |
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.890431 |
|- | |- | ||
| Longitude: -80.247783 | | Longitude: -80.247783 | ||
− | |||
|} | |} | ||
− | == | + | For data sources see<ref>{{cite web |
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Date |
− | !scope="col" | | + | !scope="col" | Event |
− | + | |- | |
− | + | | 2014-06-12 | |
− | + | | New Permit Application | |
− | + | |- | |
− | |||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources |
− | + | | date = 2020-02-27 | |
− | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | accessdate = 2020-02-27 }}</ref> |
− | | accessdate = | + | <!--== Fracking Activities == |
− | == Waste Data == | + | ==== Fracking Jobs ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | + | |- | |
− | + | |}--> | |
− | + | ||
− | |} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | !scope="col" | | + | !scope="col" | Inspection Comments |
− | + | |- | |
+ | | 2419056 | ||
+ | | Primary Facility | ||
+ | | 2015-10-05 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Well spud on 9/29/15. 40’ of 26-nch conductor was set and cemented to surface on 9/29/15. Surface casing set @ 625’ and cemented to surface on 10/2/15. Coal protective casing set @ 1,056’ and cemented to surface on 10/3/15. Current borehole depth 1,479’. Drill rig is shut down to address drilling fluid/cuttings spill that occurred on 10/5/15 @ 0030. Conduct site inspection. Operator remediating drilling fluid spill. | ||
+ | |- | ||
+ | | 2419067 | ||
+ | | Primary Facility | ||
+ | | 2015-10-06 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Rig is boomed down for repair and inspection. Current borehole depth 1,818’. Conduct site inspection. Rig repaired and drilling resumed at 1400. | ||
+ | |- | ||
+ | | 2419079 | ||
+ | | Primary Facility | ||
+ | | 2015-10-16 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Intermediate 9 5/8” casing set and cemented to surface on 10/8/2015. Intermediate casing shoe TD = 2,576’. Top-hole portion of the borehole drilled to 7,974’ TMD, 7,203’ TVD on 10/12/15. Borehole loaded with 500 bbls drilling fluid. Rig moved off of borehole. | ||
+ | |- | ||
+ | | 2432419 | ||
+ | | Primary Facility | ||
+ | | 2015-12-03 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Patterson Rig #805. Tripping into hole. Preparing to drill ahead | ||
+ | |- | ||
+ | | 2442363 | ||
+ | | Primary Facility | ||
+ | | 2015-12-09 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | Drilling complete. Well drilled to 13,968’ TMD / 7,970’ TVD. Production casing set @ 13,958’ and cemented to the surface on 12/8/2015. | ||
+ | |- | ||
+ | | 2516869 | ||
+ | | Primary Facility | ||
+ | | 2016-08-22 | ||
+ | | Incident- Response to Accident or Event | ||
+ | | No Violations Noted | ||
+ | | Incident response conducted as a result of an operator notification. | ||
+ | |- | ||
+ | | 2562582 | ||
+ | | Primary Facility | ||
+ | | 2017-02-08 | ||
+ | | Incident- Response to Accident or Event | ||
+ | | In Compliance with Policy | ||
+ | | Incident response conducted as a result of an operator notification. | ||
+ | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | == References == | + | ==References== |
− | + | <references/> | |
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
Well ID: 37-059-26558 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.890431,"lon":-80.247783,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Center Township | |
Operator Name: VANTAGE ENERGY APPALACHIA II LLC | |
Well Pad ID: | |
Farm/Lease Name: SHUMAKER 10H | |
License Status: | |
Spud Date: | |
Permit Date: 2014-06-12 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 39.890431 | |
Longitude: -80.247783 |
Date | Event |
---|---|
2014-06-12 | New Permit Application |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2419056 | Primary Facility | 2015-10-05 | Drilling/Alteration | No Violations Noted | Well spud on 9/29/15. 40’ of 26-nch conductor was set and cemented to surface on 9/29/15. Surface casing set @ 625’ and cemented to surface on 10/2/15. Coal protective casing set @ 1,056’ and cemented to surface on 10/3/15. Current borehole depth 1,479’. Drill rig is shut down to address drilling fluid/cuttings spill that occurred on 10/5/15 @ 0030. Conduct site inspection. Operator remediating drilling fluid spill. |
2419067 | Primary Facility | 2015-10-06 | Drilling/Alteration | No Violations Noted | Rig is boomed down for repair and inspection. Current borehole depth 1,818’. Conduct site inspection. Rig repaired and drilling resumed at 1400. |
2419079 | Primary Facility | 2015-10-16 | Drilling/Alteration | No Violations Noted | Intermediate 9 5/8” casing set and cemented to surface on 10/8/2015. Intermediate casing shoe TD = 2,576’. Top-hole portion of the borehole drilled to 7,974’ TMD, 7,203’ TVD on 10/12/15. Borehole loaded with 500 bbls drilling fluid. Rig moved off of borehole. |
2432419 | Primary Facility | 2015-12-03 | Drilling/Alteration | No Violations Noted | Patterson Rig #805. Tripping into hole. Preparing to drill ahead |
2442363 | Primary Facility | 2015-12-09 | Drilling/Alteration | No Violations Noted | Drilling complete. Well drilled to 13,968’ TMD / 7,970’ TVD. Production casing set @ 13,958’ and cemented to the surface on 12/8/2015. |
2516869 | Primary Facility | 2016-08-22 | Incident- Response to Accident or Event | No Violations Noted | Incident response conducted as a result of an operator notification. |
2562582 | Primary Facility | 2017-02-08 | Incident- Response to Accident or Event | In Compliance with Policy | Incident response conducted as a result of an operator notification. |
For data sources see[5]