X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-063-32839

Well Details

Well ID: 37-063-32839
Loading map...
Operator Name: ALLIANCE PETROLEUM CORP
First Permit Date: 2001-08-20
Last Permit Date: 2001-08-20
Spud Date: 2002-02-25
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.479454
Longitude: -79.224606

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2011-0 3268.45 365.0 0.0 0.0 0.01 365.0
2010-0 187.0 365.0 0.0 0.0 0.0 0.0
2009-0 1877.0 365.0 0.0 0.0 0.0 0.0
2007-0 2316.0 365.0 0.0 0.0 0.0 0.0
2006-0 3213.0 365.0 0.0 0.0 0.0 0.0
2005-0 3048.0 365.0 0.0 0.0 0.0 0.0
2004-0 4592.0 365.0 0.0 0.0 0.0 0.0
2003-0 7238.0 365.0 0.0 0.0 0.0 0.0
2002-0 4035.0 92.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2002-0 BRINE 80.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- FRANKLIN PLT
2002-0 FRACKING FLUID 520.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- FRANKLIN PLT
2003-0 BRINE 65.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- FRANKLIN PLT
2004-0 BRINE 65.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- INDIANA PLT
2006-0 BRINE 80.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT FRANKLIN BRINE -- FRANKLIN PLT

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1532611 2006-04-17 No Violations Noted TAG,TANK & SITE E&S OK
1828221 2009-09-10 No Violations Noted According to records, well was drilled to depth of 4193¿ and completed on 3/5/02. WRAC submitted and approved on 9/23/02. Well completed with 8¿ pipe reduced to 4¿ pipe reduced 2¿ production pipe with shut off valves. Based on site conditions, no indication of IW issues at the site. Well tag present. Production equipment consisted of separator (50 psi) and 100 bbl brine tank. Brine tank was half filled. Moderate erosion located at well head. No E&S issues at the site. No leaks around well head.

References