X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36629"

m
 
m
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36629
 
| Well ID: 37-063-36629
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.490671, -79.443402 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.490672, -79.443403 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 +
|-
 +
| County: [[Indiana_County,_Pennsylvania|Indiana]]
 
|-
 
|-
| Operator Name: [[XTO ENERGY INC]]
+
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]]
 
|-
 
|-
| First Permit Date: 2009-08-21
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
| Last Permit Date: 2009-08-21
+
| Well Pad ID:  
 
|-
 
|-
| Spud Date: 2010-02-23
+
| Farm/Lease Name: JACOB R STEAR 2A
 
|-
 
|-
| Unconventional: No
+
| License Status: PLUGGED & ABANDONED
 
|-
 
|-
| Horizontal: No
+
| Spud Date: 2010-02-26
 
|-
 
|-
| Violations: None
+
| Permit Date: 2009-08-21
 
|-
 
|-
| Latitude: 40.490671
+
| Well Type: GAS
 
|-
 
|-
| Longitude: -79.443402
+
| Unconventional Well: N
 
|-
 
|-
 +
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 +
|-
 +
| Latitude: 40.490672
 +
|-
 +
| Longitude: -79.443403
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-08-21
 +
| New Permit Application
 +
|-
 +
| 2010-02-23
 +
| Performed Spud Operation
 +
|-
 +
| 2010-02-25
 +
| Drilling Completion
 +
|-
 +
| 2010-03-03
 +
| Drilling Completion
 +
|-
 +
| 2010-03-09
 +
| Perforation
 +
|-
 +
| 2010-08-03
 +
| NEWLY DRILLED
 +
|-
 +
| 2010-08-03
 +
| SKIDDED RIG
 +
|-
 +
| 2010-11-02
 +
| FULLY PLUGGED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2010
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2011
 +
| [[PHILLIPS EXPLORATION INC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-0
+
| 2012
| style="text-align:right;" | 3524.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 365.0
+
| style="text-align: right;" | 5,966.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 3,524.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 5966.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 366.0
+
| style="text-align: right;" | 10,150.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| style="text-align: right;" | 5,384.81
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-0
+
| 2016
| style="text-align:right;" | 0.0
+
| [[XTO ENERGY INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 5,301.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[ALLIANCE PETRO CO LLC]]
 +
| style="text-align: right;" | 3,125.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-0
+
| 2018
| style="text-align:right;" | 0.0
+
| [[ALLIANCE PETRO CO LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 3,739.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 365
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2015
!scope="col" | FACILITY STATE
+
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 51 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 51.00 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0095273
 +
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 1865725
 
| 1865725
 +
| Primary Facility
 
| 2010-02-24
 
| 2010-02-24
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| According to records, permit granted 8/21/09.  Access road on the steep grade was draining.  Area behind pits was draining onto the pad creating a wet zone on the pad.  DEP requested that the WQ inspect site for drainage issues.  At the time of inspection, Well Superior was cementing the 9 5/8¿ pipe which extended to 250ft.  Conductor pipe was set at 18 ft.  Anticipated TD is 3940 ft.  Pit aligned with 20mil plastic and no freeboard issues.  E&S controls are in place.  At the time of inspection, no IW and E&S issues at the site.
 
| According to records, permit granted 8/21/09.  Access road on the steep grade was draining.  Area behind pits was draining onto the pad creating a wet zone on the pad.  DEP requested that the WQ inspect site for drainage issues.  At the time of inspection, Well Superior was cementing the 9 5/8¿ pipe which extended to 250ft.  Conductor pipe was set at 18 ft.  Anticipated TD is 3940 ft.  Pit aligned with 20mil plastic and no freeboard issues.  E&S controls are in place.  At the time of inspection, no IW and E&S issues at the site.
|
 
|-
 
 
|-
 
|-
 
| 1865871
 
| 1865871
 +
| Primary Facility
 
| 2010-02-25
 
| 2010-02-25
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Additional access road road BMP's are being installed.  Site E&S ok.  Pit liner was to be anchored better on the backside of the site due to the expected upcoming weather conditions.  Plow and broom truck located onsite to address andy further off-site transport of sediment.  Site and access road should be temporarliy stabilized with the additional road BMP's until the rig is moved off-site
 
| Additional access road road BMP's are being installed.  Site E&S ok.  Pit liner was to be anchored better on the backside of the site due to the expected upcoming weather conditions.  Plow and broom truck located onsite to address andy further off-site transport of sediment.  Site and access road should be temporarliy stabilized with the additional road BMP's until the rig is moved off-site
|
 
|-
 
 
|-
 
|-
 
| 1867378
 
| 1867378
 +
| Primary Facility
 
| 2010-03-03
 
| 2010-03-03
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| According to records, permit granted 8/21/09.  Problem occurred with poor cementing of the first stringer.  Hence, PC called Rick Hoover (DEP) and confirmed to skid rig 15 ft north.  Well was plugged with paperwork (intent to plug and certificate submitted to DEP).  Well #2A was drilled depth of 3940 ft.  Conductor pipe set at 17¿; 9 5/8¿ set to 331 ft. and 7¿ set to 1351¿.  Currently, extra pipe was being removed from site and wire line study was being performed.  Site pad was heavily saturated causing vehicles to be moved with dozer.  Abundant amount of mud was located on the township road.  Slight odor of gas noted from well.  Upon completion of wire line, Well Superior was going to cement final section.  Pit aligned with 20mil plastic and no freeboard issues.  E&S controls are in place.  At the time of inspection, no IW and E&S issues at the site.  Requested PC to clean mud from road upon completion of project.
 
| According to records, permit granted 8/21/09.  Problem occurred with poor cementing of the first stringer.  Hence, PC called Rick Hoover (DEP) and confirmed to skid rig 15 ft north.  Well was plugged with paperwork (intent to plug and certificate submitted to DEP).  Well #2A was drilled depth of 3940 ft.  Conductor pipe set at 17¿; 9 5/8¿ set to 331 ft. and 7¿ set to 1351¿.  Currently, extra pipe was being removed from site and wire line study was being performed.  Site pad was heavily saturated causing vehicles to be moved with dozer.  Abundant amount of mud was located on the township road.  Slight odor of gas noted from well.  Upon completion of wire line, Well Superior was going to cement final section.  Pit aligned with 20mil plastic and no freeboard issues.  E&S controls are in place.  At the time of inspection, no IW and E&S issues at the site.  Requested PC to clean mud from road upon completion of project.
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 05:47, 16 May 2020

Well Details

Well ID: 37-063-36629
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Conemaugh Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: JACOB R STEAR 2A
License Status: PLUGGED & ABANDONED
Spud Date: 2010-02-26
Permit Date: 2009-08-21
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.490672
Longitude: -79.443403

For data sources see[1][2][3]

Well History

Date Event
2009-08-21 New Permit Application
2010-02-23 Performed Spud Operation
2010-02-25 Drilling Completion
2010-03-03 Drilling Completion
2010-03-09 Perforation
2010-08-03 NEWLY DRILLED
2010-08-03 SKIDDED RIG
2010-11-02 FULLY PLUGGED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2011 PHILLIPS EXPLORATION INC 0.00 0 0.00 0 0.00 0
2012 XTO ENERGY INC 5,966.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 3,524.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 10,150.00 365 0.00 0 0.00 0
2015 XTO ENERGY INC 5,384.81 365 0.00 0 0.00 0
2016 XTO ENERGY INC 5,301.00 366 0.00 0 0.00 0
2017 ALLIANCE PETRO CO LLC 3,125.00 334 0.00 0 0.00 0
2018 ALLIANCE PETRO CO LLC 3,739.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 XTO ENERGY INC Produced Fluid 51 Bbl CENT WASTE TRT FAC NPDES PA0095273
2015 XTO ENERGY INC Produced Fluid 51.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865725 Primary Facility 2010-02-24 Drilling/Alteration No Violations Noted According to records, permit granted 8/21/09. Access road on the steep grade was draining. Area behind pits was draining onto the pad creating a wet zone on the pad. DEP requested that the WQ inspect site for drainage issues. At the time of inspection, Well Superior was cementing the 9 5/8¿ pipe which extended to 250ft. Conductor pipe was set at 18 ft. Anticipated TD is 3940 ft. Pit aligned with 20mil plastic and no freeboard issues. E&S controls are in place. At the time of inspection, no IW and E&S issues at the site.
1865871 Primary Facility 2010-02-25 Routine/Complete Inspection No Violations Noted Additional access road road BMP's are being installed. Site E&S ok. Pit liner was to be anchored better on the backside of the site due to the expected upcoming weather conditions. Plow and broom truck located onsite to address andy further off-site transport of sediment. Site and access road should be temporarliy stabilized with the additional road BMP's until the rig is moved off-site
1867378 Primary Facility 2010-03-03 Drilling/Alteration No Violations Noted According to records, permit granted 8/21/09. Problem occurred with poor cementing of the first stringer. Hence, PC called Rick Hoover (DEP) and confirmed to skid rig 15 ft north. Well was plugged with paperwork (intent to plug and certificate submitted to DEP). Well #2A was drilled depth of 3940 ft. Conductor pipe set at 17¿; 9 5/8¿ set to 331 ft. and 7¿ set to 1351¿. Currently, extra pipe was being removed from site and wire line study was being performed. Site pad was heavily saturated causing vehicles to be moved with dozer. Abundant amount of mud was located on the township road. Slight odor of gas noted from well. Upon completion of wire line, Well Superior was going to cement final section. Pit aligned with 20mil plastic and no freeboard issues. E&S controls are in place. At the time of inspection, no IW and E&S issues at the site. Requested PC to clean mud from road upon completion of project.

For data sources see[7]

References