If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-36770 | | Well ID: 37-063-36770 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.702311, -78.832522 | width=100% | height=100% }} |
+ | |- | ||
+ | | County: [[Indiana County, Pennsylvania|Indiana]] | ||
+ | |- | ||
+ | | Municipality: [[Green Township, Indiana County, Pennsylvania|Green Township]] | ||
|- | |- | ||
| Operator Name: [[JUART EXPLORATION INC]] | | Operator Name: [[JUART EXPLORATION INC]] | ||
+ | |- | ||
+ | | Well Pad ID: | ||
+ | |- | ||
+ | | Farm/Lease Name: SHAFFER 1 | ||
|- | |- | ||
| First Permit Date: 2010-02-25 | | First Permit Date: 2010-02-25 | ||
Line 16: | Line 24: | ||
|- | |- | ||
| Horizontal: No | | Horizontal: No | ||
+ | |- | ||
+ | | Well Status: ACTIVE | ||
|- | |- | ||
| Violations: 2 | | Violations: 2 | ||
Line 43: | Line 53: | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Production Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 61: | Line 77: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
Line 72: | Line 88: | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
| PA0095443 | | PA0095443 | ||
− | | | + | | CREEKSIDE TREATMENT FACILITY |
| CREEKSIDE | | CREEKSIDE | ||
| PA | | PA | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Oil and Gas Historical Waste Report | ||
+ | | publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste | ||
+ | | accessdate = 2015-05-26 }}</ref> | ||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 84: | Line 106: | ||
!scope="col" | COMMENT | !scope="col" | COMMENT | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
+ | !scope="col" | VIOLATION CODE | ||
+ | !scope="col" | VIOLATION_COMMENT | ||
|- | |- | ||
| 1900570 | | 1900570 | ||
Line 96: | Line 120: | ||
| 591775 | | 591775 | ||
+ | | 401CSL - Discharge of pollultional material to waters of Commonwealth. | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 109: | Line 135: | ||
| 591775 | | 591775 | ||
+ | | 401CSL - Discharge of pollultional material to waters of Commonwealth. | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 122: | Line 150: | ||
| 591776 | | 591776 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 135: | Line 165: | ||
| 591776 | | 591776 | ||
+ | | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
Line 141: | Line 173: | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
| Spudded 6/3/10. Site ID sign and E&S plan ok. Not equipped for production. NOV issued 7/26/10. Follow up revealed drill pit and site backfilled and regraded to redirect runoff away from access road and discharge point. Silt fence trenched in. Additional rock installed on access road. Site and disturbed areas along access road have been seeded/mulched. No additional sediment observed flowing into the pond, but pond is still extremely dirty and sediment could be seen in the pond. Operator should contact owner to discuss this. Compliance inspection to be done after suitable veg begins to ensure that final stabilzation is adequate to prevent further pollution of sediment. Temp controls in place. Operator should closely monitor site to ensure temp controls and restoration is ok. | | Spudded 6/3/10. Site ID sign and E&S plan ok. Not equipped for production. NOV issued 7/26/10. Follow up revealed drill pit and site backfilled and regraded to redirect runoff away from access road and discharge point. Silt fence trenched in. Additional rock installed on access road. Site and disturbed areas along access road have been seeded/mulched. No additional sediment observed flowing into the pond, but pond is still extremely dirty and sediment could be seen in the pond. Operator should contact owner to discuss this. Compliance inspection to be done after suitable veg begins to ensure that final stabilzation is adequate to prevent further pollution of sediment. Temp controls in place. Operator should closely monitor site to ensure temp controls and restoration is ok. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 151: | Line 185: | ||
Compliance Evaluation inspection revealed the following: Drill pit and site has been backfilled and regraded to avoid the runoff from the site being directed toward the access road and the discharge point. Silt fence has been trenched in. Additional rock has been applied to the access road for further stabilization. Site and disturbed areas along the access road have been seeded/mulched. Site is stabilized with vegetation. Site and access road are stable, with no signs of accelerated erosion. No signs of additional sediment discharge to adjacent pond. Temporary E&S controls in place and maintained. No additional violations found. Site is in compliance. | Compliance Evaluation inspection revealed the following: Drill pit and site has been backfilled and regraded to avoid the runoff from the site being directed toward the access road and the discharge point. Silt fence has been trenched in. Additional rock has been applied to the access road for further stabilization. Site and disturbed areas along the access road have been seeded/mulched. Site is stabilized with vegetation. Site and access road are stable, with no signs of accelerated erosion. No signs of additional sediment discharge to adjacent pond. Temporary E&S controls in place and maintained. No additional violations found. Site is in compliance. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
Line 157: | Line 193: | ||
| 2011-04-05 | | 2011-04-05 | ||
| No Violations Noted | | No Violations Noted | ||
+ | | | ||
+ | | | ||
| | | | ||
| | | | ||
Line 171: | Line 209: | ||
No erosion/sedimentation issues found. No violations found. | No erosion/sedimentation issues found. No violations found. | ||
+ | | | ||
+ | | | ||
| | | | ||
|- | |- | ||
|} | |} | ||
− | ==References== | + | For data sources see<ref>{{cite web |
− | {{ | + | | title = Oil and Gas Historical Inspection Report |
− | + | | publisher = [[Pennsylvania Department of Environmental Protection]] | |
+ | | date = 2015-05-26 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections | ||
+ | | accessdate = 2015-05-27 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 37-063-36770 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.702311,"lon":-78.832522,"icon":""}]} |
County: Indiana | |
Municipality: Green Township | |
Operator Name: JUART EXPLORATION INC | |
Well Pad ID: | |
Farm/Lease Name: SHAFFER 1 | |
First Permit Date: 2010-02-25 | |
Last Permit Date: 2010-02-25 | |
Spud Date: 2010-06-03 | |
Unconventional: No | |
Horizontal: No | |
Well Status: ACTIVE | |
Violations: 2 | |
Latitude: 40.702311 | |
Longitude: -78.832522 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
For data sources see[1]
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILLING FLUID WASTE | 300.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
2010-0 | PRODUCED FLUID | 0.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
For data sources see[2]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
1900570 | 2010-07-20 | Violation(s) Noted | Well spudded 6/3/10. Site ID sign in place. E&S plan on site. Well is not equipped for production (well head only). Lined drill pit appeared sound, and had adequate freeboard.
Inspection revealed the following deficiencies: 1) Discharge of pollutional materials in the form of sediment to waters of the commonwealth. - Due to the slope/layout of the site and access road a large volume of water and sediment ran off the site and down a portion of the access road to a low lying area. From this point the sediment was carried along the low lying area and into an adjacent pond approximately 200 feet from the access road and well site. Sediment laden run off was observed flowing from the site/access road and directly into the pond which was completely brown from sediment. This flow was approximately 3 to 4 feet wide and had overwhelmed the BMP's that were installed. 2) Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls, and to stabilize site. Access road was not stable at time of inspecti |
591775 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1900570 | 2010-07-20 | Violation(s) Noted | Well spudded 6/3/10. Site ID sign in place. E&S plan on site. Well is not equipped for production (well head only). Lined drill pit appeared sound, and had adequate freeboard.
Inspection revealed the following deficiencies: 1) Discharge of pollutional materials in the form of sediment to waters of the commonwealth. - Due to the slope/layout of the site and access road a large volume of water and sediment ran off the site and down a portion of the access road to a low lying area. From this point the sediment was carried along the low lying area and into an adjacent pond approximately 200 feet from the access road and well site. Sediment laden run off was observed flowing from the site/access road and directly into the pond which was completely brown from sediment. This flow was approximately 3 to 4 feet wide and had overwhelmed the BMP's that were installed. 2) Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls, and to stabilize site. Access road was not stable at time of inspecti |
591775 | 401CSL - Discharge of pollultional material to waters of Commonwealth. | |
1900570 | 2010-07-20 | Violation(s) Noted | Well spudded 6/3/10. Site ID sign in place. E&S plan on site. Well is not equipped for production (well head only). Lined drill pit appeared sound, and had adequate freeboard.
Inspection revealed the following deficiencies: 1) Discharge of pollutional materials in the form of sediment to waters of the commonwealth. - Due to the slope/layout of the site and access road a large volume of water and sediment ran off the site and down a portion of the access road to a low lying area. From this point the sediment was carried along the low lying area and into an adjacent pond approximately 200 feet from the access road and well site. Sediment laden run off was observed flowing from the site/access road and directly into the pond which was completely brown from sediment. This flow was approximately 3 to 4 feet wide and had overwhelmed the BMP's that were installed. 2) Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls, and to stabilize site. Access road was not stable at time of inspecti |
591776 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1900570 | 2010-07-20 | Violation(s) Noted | Well spudded 6/3/10. Site ID sign in place. E&S plan on site. Well is not equipped for production (well head only). Lined drill pit appeared sound, and had adequate freeboard.
Inspection revealed the following deficiencies: 1) Discharge of pollutional materials in the form of sediment to waters of the commonwealth. - Due to the slope/layout of the site and access road a large volume of water and sediment ran off the site and down a portion of the access road to a low lying area. From this point the sediment was carried along the low lying area and into an adjacent pond approximately 200 feet from the access road and well site. Sediment laden run off was observed flowing from the site/access road and directly into the pond which was completely brown from sediment. This flow was approximately 3 to 4 feet wide and had overwhelmed the BMP's that were installed. 2) Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls, and to stabilize site. Access road was not stable at time of inspecti |
591776 | 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) | |
1904507 | 2010-07-27 | Outstanding Violations - No Viols Req'd | Spudded 6/3/10. Site ID sign and E&S plan ok. Not equipped for production. NOV issued 7/26/10. Follow up revealed drill pit and site backfilled and regraded to redirect runoff away from access road and discharge point. Silt fence trenched in. Additional rock installed on access road. Site and disturbed areas along access road have been seeded/mulched. No additional sediment observed flowing into the pond, but pond is still extremely dirty and sediment could be seen in the pond. Operator should contact owner to discuss this. Compliance inspection to be done after suitable veg begins to ensure that final stabilzation is adequate to prevent further pollution of sediment. Temp controls in place. Operator should closely monitor site to ensure temp controls and restoration is ok. | |||
1910692 | 2010-09-02 | No Violations Noted | Well spudded 6/3/10. Site ID sign in place. E&S plan on site. Well is not equipped for production (well head only).
NOV issued on 7/26/10 for: 1) Discharge of pollutional materials in the form of sediment to waters of the commonwealth, 2) Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls, and stabilize site. Compliance Evaluation inspection revealed the following: Drill pit and site has been backfilled and regraded to avoid the runoff from the site being directed toward the access road and the discharge point. Silt fence has been trenched in. Additional rock has been applied to the access road for further stabilization. Site and disturbed areas along the access road have been seeded/mulched. Site is stabilized with vegetation. Site and access road are stable, with no signs of accelerated erosion. No signs of additional sediment discharge to adjacent pond. Temporary E&S controls in place and maintained. No additional violations found. Site is in compliance. |
|||
1964924 | 2011-04-05 | No Violations Noted | ||||
1965079 | 2011-04-05 | No Violations Noted | Site id sign in place. Inspection conducted with inspector Rick Hoover.
Access road is stabilized, with no signs of accelerated erosion. Site is stabilized with vegetation. No signs of accelerated erosion on site. No production fluids tank installed. Perimeter of access road is stabilized with vegetation. No erosion/sedimentation issues found. No violations found. |
For data sources see[3]