Well ID: 42-063-37378 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.524533,"lon":-79.198077,"icon":""}]} |
County: Indiana | |
Municipality: Center Township | |
Operator Name: XTO ENERGY INC | |
Well Pad ID: 148497 | |
First Permit Date: 2012-05-10 | |
Last Permit Date: 2012-05-10 | |
Spud Date: None | |
Unconventional: Yes | |
Horizontal: Yes | |
Violations: None | |
Latitude: 40.524533 | |
Longitude: -79.198077 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2088631 | 2012-08-01 | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present. Department unable to locate drililng permits.
Well (9H) proposed and not yet drilled [2H, 3H, 4H & 8H drilled and equipped) , no activity onsite during inspection. Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimeantion issues noted. Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H and 9H. Four MEI boxes located onsite, along with two roll off boxes. All appear sound. Four brine tanks and prodcuiton equipment located onsite within lined metal containment. No IW leaks or discharges noted. No violations. |
|
2109606 | 2012-10-16 | No Violations Noted | multi-well pad site ID signs, ES plan, and ESCGP-1 present.
Well (9H) not yet drilled, proposed. no activity onsite during inspection. Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimeantion issues noted. Previously repaired slope failure has been permaently stabilized and revegetatived--compost sock(s) installed down gradient in order to perevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Temporary soil piles secured with vegetative matting, although recommend operator maintain as some sections of matting have become lose. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H( issued: 4/13/12) and 9H (issued:4/13/12) ; therefore site has not yet been restored to PCSM plan. Four brine tanks and prodcuiton equipment located onsite within lined metal containment. No IW leaks or discharges noted. |
|
2136139 | 2013-01-31 | No Violations Noted | Routine inspection. At the time of this inspection, multi-well pad site ID signs, ES plan, and ESCGP-1 present.
Well (9H) not yet drilled, proposed. no activity onsite during inspection. Access road stable. Pad adequately rocked an maintained. No accelerated erosion or sedimentation issues noted. Previously repaired slope failure has been permanently stabilized and re-vegetated--compost sock(s) installed down gradient in order to prevent a possible pollution event if slide would reoccur- no ES concerns exist at time of this inspection. Observed that operator still has flowback line in place under HCPP roadway. Site has been temporarily stabilized, operator has intention of drilling several more wells on property, to date permits have been obtained for 7H ( issued: 5/10/12) and 9H (issued:5/10/12); therefore, site has not yet been restored to PCSM plan. Four brine tanks and production equipment located onsite within lined metal containment. Accompanied by Environmental Trainee Samantha Foulk |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|