X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-065-26288"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-065-26288
 
| Well ID: 37-065-26288
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.147970, -79.207023 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.147970, -79.207023 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 06/23/2008
+
| Spud Date: 2008-06-23
 
|-
 
|-
| Permit Date: 5/9/2008
+
| Permit Date: 2008-05-09
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 80
 
| style="text-align: right;" | 80
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 74: Line 99:
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 269
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 83: Line 108:
 
| style="text-align: right;" | 315
 
| style="text-align: right;" | 315
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 92: Line 117:
 
| style="text-align: right;" | 225
 
| style="text-align: right;" | 225
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 101: Line 126:
 
| style="text-align: right;" | 322
 
| style="text-align: right;" | 322
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 110: Line 135:
 
| style="text-align: right;" | 289
 
| style="text-align: right;" | 289
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 119: Line 144:
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 244
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 128: Line 153:
 
| style="text-align: right;" | 221
 
| style="text-align: right;" | 221
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 137: Line 162:
 
| style="text-align: right;" | 281
 
| style="text-align: right;" | 281
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 146: Line 171:
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 252
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 174: Line 199:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 260.00 Bbl
 
| style="text-align: right;" | 260.00 Bbl
Line 180: Line 205:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
Line 205: Line 230:
 
| 1715638
 
| 1715638
 
| Primary Facility
 
| Primary Facility
| 06/25/2008
+
| 2008-06-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 212: Line 237:
 
| 1716976
 
| 1716976
 
| Primary Facility
 
| Primary Facility
| 06/30/2008
+
| 2008-06-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 219: Line 244:
 
| 1736901
 
| 1736901
 
| Primary Facility
 
| Primary Facility
| 09/12/2008
+
| 2008-09-12
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 226: Line 251:
 
| 1736905
 
| 1736905
 
| Primary Facility
 
| Primary Facility
| 09/23/2008
+
| 2008-09-23
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 233: Line 258:
 
| 1736907
 
| 1736907
 
| Primary Facility
 
| Primary Facility
| 09/15/2008
+
| 2008-09-15
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 240: Line 265:
 
| 1738476
 
| 1738476
 
| Primary Facility
 
| Primary Facility
| 09/29/2008
+
| 2008-09-29
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 247: Line 272:
 
| 1740837
 
| 1740837
 
| Primary Facility
 
| Primary Facility
| 10/07/2008
+
| 2008-10-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 254: Line 279:
 
| 1747260
 
| 1747260
 
| Primary Facility
 
| Primary Facility
| 11/04/2008
+
| 2008-11-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 303: Line 328:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 19:37, 1 August 2019

Well Details

Well ID: 37-065-26288
Loading map...
Country: United States
State: Pennsylvania
County: Jefferson
Municipality: Clover Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: DOUGLAS SHAFFER 2JEF
License Status: Active
Spud Date: 2008-06-23
Permit Date: 2008-05-09
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.147970
Longitude: -79.207023

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2008 TEXAS KEYSTONE INC 1,465.00 80 0.00 0 0.00 0
2009 TEXAS KEYSTONE INC 3,662.00 269 0.00 0 0.00 0
2010 TEXAS KEYSTONE INC 2,432.00 315 0.00 0 0.00 0
2011 TEXAS KEYSTONE INC 1,283.00 225 0.00 0 0.00 0
2012 TEXAS KEYSTONE INC 1,080.00 322 0.00 0 0.00 0
2013 TEXAS KEYSTONE INC 852.00 289 0.00 0 0.00 0
2014 TEXAS KEYSTONE INC 600.00 244 0.00 0 0.00 0
2015 TEXAS KEYSTONE INC 694.00 221 0.00 0 0.00 0
2016 DIVERSIFIED OIL & GAS LLC 819.00 281 0.00 0 0.00 0
2017 DIVERSIFIED OIL & GAS LLC 724.00 252 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 435.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-A00 Produced Fluid (in Barrels) 260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-A00 Produced Fluid (in Barrels) 90.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1715638 Primary Facility 2008-06-25 Drilling/Alteration No Violations Noted
1716976 Primary Facility 2008-06-30 Routine/Complete Inspection No Violations Noted
1736901 Primary Facility 2008-09-12 Complaint Inspection No Violations Noted
1736905 Primary Facility 2008-09-23 Complaint Inspection No Violations Noted
1736907 Primary Facility 2008-09-15 Complaint Inspection No Violations Noted
1738476 Primary Facility 2008-09-29 Complaint Inspection No Violations Noted
1740837 Primary Facility 2008-10-07 Routine/Complete Inspection No Violations Noted
1747260 Primary Facility 2008-11-04 Routine/Complete Inspection No Violations Noted
2473209 Primary Facility 2016-04-07 Routine/Complete Inspection No Violations Noted
2702345 Primary Facility 2018-03-07 Routine/Partial Inspection No Violations Noted Well is connected to sales line producing on a 31 day chart. Check valve equipped at the wellsite.

For data sources see[6]

References