X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-22760"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-22760
 
| Well ID: 37-085-22760
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.236922, -80.434588 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.236922, -80.434588 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: SNYDER 1
 
| Farm/Lease Name: SNYDER 1
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 03/04/2000
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/30/1999
+
| Permit Date: 1999-12-30
 +
|-
 +
| Well Type: COMB. OIL&GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.236922
 
| Latitude: 41.236922
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1999-12-30
 +
| New Permit Application
 +
|-
 +
| 2000-03-04
 +
| Performed Spud Operation
 +
|-
 +
| 2000-03-10
 +
| Drilling Completion
 +
|-
 +
| 2000-03-19
 +
| Perforation
 +
|-
 +
| 2001-10-16
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 128:
 
| 2001
 
| 2001
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 10,541.00
+
| style="text-align: right;" | 10541
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 8,906.00
+
| style="text-align: right;" | 8906
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 5,422.00
+
| style="text-align: right;" | 5422
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 4,735.00
+
| style="text-align: right;" | 4735
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 4,740.00
+
| style="text-align: right;" | 4740
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 3,878.00
+
| style="text-align: right;" | 3878.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 4,226.00
+
| style="text-align: right;" | 4226.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 2,908.00
+
| style="text-align: right;" | 2908.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 53.00
 
| style="text-align: right;" | 53.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[WILKES ENERGY INC]]
 
| [[WILKES ENERGY INC]]
| style="text-align: right;" | 3,096.00
+
| style="text-align: right;" | 3096.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 146: Line 212:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 155: Line 221:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 164: Line 230:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 173: Line 239:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 182: Line 248:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 191: Line 257:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 200: Line 266:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 209: Line 275:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 223: Line 289:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 228: Line 295:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2004-0
+
| 2004
 +
| [[WILKES ENERGY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 60.00 Bbl
 
| style="text-align: right;" | 60.00 Bbl
Line 234: Line 302:
 
| OH-2403
 
| OH-2403
 
|-
 
|-
| 2005-0
+
| 2005
 +
| [[WILKES ENERGY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 39.00 Bbl
 
| style="text-align: right;" | 39.00 Bbl
Line 240: Line 309:
 
| OH-2403
 
| OH-2403
 
|-
 
|-
| 2006-0
+
| 2006
 +
| [[WILKES ENERGY INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 246: Line 316:
 
| OH-2403
 
| OH-2403
 
|-
 
|-
| 2010-0
+
| 2010
| Produced Fluid (in Barrels)
+
| [[WILKES ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-155-22403
 
| 34-155-22403
 
|-
 
|-
| 2013-0
+
| 2013
| Produced Fluid (in Barrels)
+
| [[WILKES ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 54.00 Bbl
 
| style="text-align: right;" | 54.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-155-23223
 
| 34-155-23223
 
|-
 
|-
| 2016-0
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[WILKES ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 42.00 Bbl
 +
| Injection Disposal Well
 +
| 34-155-23196
 +
|-
 +
| 2016
 +
| [[WILKES ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 27.00 Bbl
 
| style="text-align: right;" | 27.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2018-0
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[DJR WELL SERVICES INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 77.00 Bbl
 
| style="text-align: right;" | 77.00 Bbl
| INJECTION DISPOSAL WELL
+
| Injection Disposal Well
 
| 34-007-21847
 
| 34-007-21847
 
|-
 
|-
Line 289: Line 370:
 
| 1051281
 
| 1051281
 
| Primary Facility
 
| Primary Facility
| 08/07/2001
+
| 2001-08-07
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 296: Line 377:
 
| 2389951
 
| 2389951
 
| Primary Facility
 
| Primary Facility
| 07/15/2015
+
| 2015-07-15
 
| Routine/Partial Inspection
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 303: Line 384:
 
| 921432
 
| 921432
 
| Primary Facility
 
| Primary Facility
| 03/06/2000
+
| 2000-03-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Viol(s) Noted &  Immediately Corrected
 
| Viol(s) Noted &  Immediately Corrected
Line 310: Line 391:
 
| 926630
 
| 926630
 
| Primary Facility
 
| Primary Facility
| 03/20/2000
+
| 2000-03-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 317: Line 398:
 
| 926710
 
| 926710
 
| Primary Facility
 
| Primary Facility
| 03/28/2000
+
| 2000-03-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 324: Line 405:
 
| 936893
 
| 936893
 
| Primary Facility
 
| Primary Facility
| 05/10/2000
+
| 2000-05-10
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 331: Line 412:
 
| 938266
 
| 938266
 
| Primary Facility
 
| Primary Facility
| 05/10/2000
+
| 2000-05-10
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 350: Line 431:
 
| 234113
 
| 234113
 
| 03/06/2000
 
| 03/06/2000
| 03/06/2000
+
| 2000-03-06
 
| 201A - Failure to have permit on site during drilling
 
| 201A - Failure to have permit on site during drilling
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 358: Line 439:
 
| 234114
 
| 234114
 
| 03/06/2000
 
| 03/06/2000
| 03/06/2000
+
| 2000-03-06
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| Administrative
 
| Administrative
Line 380: Line 461:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/06/2000
+
| 2000-03-06
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 389: Line 470:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/06/2000
+
| 2000-03-06
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 400: Line 481:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 07:36, 15 May 2020

Well Details

Well ID: 37-085-22760
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Hermitage City
Operator Name: DJR WELL SERVICES INC
Well Pad ID:
Farm/Lease Name: SNYDER 1
License Status: ACTIVE
Spud Date:
Permit Date: 1999-12-30
Well Type: COMB. OIL&GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.236922
Longitude: -80.434588

For data sources see[1][2][3]

Well History

Date Event
1999-12-30 New Permit Application
2000-03-04 Performed Spud Operation
2000-03-10 Drilling Completion
2000-03-19 Perforation
2001-10-16 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 WILKES ENERGY INC 10541 365 0.00 0 0.00 0
2002 WILKES ENERGY INC 8906 365 0.00 0 0.00 0
2003 WILKES ENERGY INC 5422 365 0.00 0 0.00 0
2004 WILKES ENERGY INC 4735 365 0.00 0 0.00 0
2005 WILKES ENERGY INC 4740 365 0.00 0 0.00 0
2006 WILKES ENERGY INC 3878.00 365 0.00 0 0.00 0
2007 WILKES ENERGY INC 4226.00 365 0.00 0 0.00 0
2008 WILKES ENERGY INC 2908.00 365 53.00 365 0.00 0
2009 WILKES ENERGY INC 3096.00 365 0.00 0 0.00 0
2010 WILKES ENERGY INC 1,995.00 365 0.00 0 0.00 0
2011 WILKES ENERGY INC 3,035.00 365 0.00 0 0.00 0
2012 WILKES ENERGY INC 3,423.00 365 0.00 0 0.00 0
2013 WILKES ENERGY INC 2,649.00 365 0.00 0 0.00 0
2014 WILKES ENERGY INC 2,085.96 365 0.00 0 0.00 0
2015 WILKES ENERGY INC 2,822.00 365 0.00 0 0.00 0
2016 WILKES ENERGY INC 2,842.00 365 0.00 0 0.00 0
2018 DJR WELL SERVICES INC 2,746.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2004 WILKES ENERGY INC Brine 60.00 Bbl Injection Disposal Well OH-2403
2005 WILKES ENERGY INC Brine 39.00 Bbl Injection Disposal Well OH-2403
2006 WILKES ENERGY INC Brine 55.00 Bbl Injection Disposal Well OH-2403
2010 WILKES ENERGY INC Produced Fluid 40.00 Bbl Injection Disposal Well 34-155-22403
2013 WILKES ENERGY INC Produced Fluid 54.00 Bbl Injection Disposal Well 34-155-23223
2015 WILKES ENERGY INC Produced Fluid 42.00 Bbl Injection Disposal Well 34-155-23196
2016 WILKES ENERGY INC Produced Fluid 27.00 Bbl Injection Disposal Well 34-007-20919
2018 DJR WELL SERVICES INC Produced Fluid 77.00 Bbl Injection Disposal Well 34-007-21847

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1051281 Primary Facility 2001-08-07 Administrative/File Review No Violations Noted well record review
2389951 Primary Facility 2015-07-15 Routine/Partial Inspection No Violations Noted
921432 Primary Facility 2000-03-06 Drilling/Alteration Viol(s) Noted & Immediately Corrected
926630 Primary Facility 2000-03-20 Routine/Complete Inspection No Violations Noted
926710 Primary Facility 2000-03-28 Routine/Complete Inspection No Violations Noted
936893 Primary Facility 2000-05-10 Drilling/Alteration No Violations Noted
938266 Primary Facility 2000-05-10 Site Restoration No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
921432 234113 03/06/2000 2000-03-06 201A - Failure to have permit on site during drilling Environmental Health & Safety phone call corrected violation
921432 234114 03/06/2000 2000-03-06 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative phone call corrected violation

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
234113 49710 NOV - Notice of Violation Comply/Closed 2000-03-06
234114 49710 NOV - Notice of Violation Comply/Closed 2000-03-06

For data sources see[7]

References