X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-111-20297

Well Details

Well ID: 37-111-20297
Loading map...
County: Somerset
Municipality: Lower Turkeyfoot Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 146632
Farm/Lease Name: PMG BAIRD 1H
First Permit Date: 2010-06-10
Last Permit Date: 2010-06-10
Spud Date: 2011-04-19
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 39.854805
Longitude: -79.334722

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2010-3 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2010-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-1 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2011-2 0.0 0.0 0.0 0.0 0.0 0.0
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 0.0 0.0 0.0 0.0 0.0 0.0
2014-1 0.0 0.0 0.0 0.0 0.0 0.0
2014-2 0.0 0.0 0.0 0.0 0.0 0.0
2015-02 0.0 0.0 0.0 0.0 0.0 0.0
2015-01 0.0 0.0 0.0 0.0 0.0 0.0
2015-03 0.0 0.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2011-1 DRILL CUTTINGS 1.0 Tons LANDFILL 100081 SOUTHERN ALLEGHENIES LANDFILL DAVIDSVILLE PA
2011-1 DRILLING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163 PATRIOT WATER TREATMENT WARREN OH
2011-2 DRILLING FLUID WASTE 4.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2011-2 FRACING FLUID WASTE 1.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-1 FRACING FLUID WASTE 840.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 FRACING FLUID WASTE 365.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2003358 2011-09-08 No Violations Noted At the time of inspection, well ID sign, ES plan, and ESCGP-1 present. Site gated and monitored 24hrs/day by security. Access road ok, minor erosion (pot holes) noted. Recommend that operator add additional rock to access road in order to prevent further erosion. Well drilled, not yet fractured. Secondary containment pad being installed over well pad. Forty-two structurally sound frac tanks located on well site. Installed BMPS appear to be maintained and functioning correctly. No accelerated erosion or sedimentation issues noted on site. Recommend operator remove ﾿garbage pile﾿ located on right back side of pad (when facing well head from access road). All previously disturbed areas have been stabilized with vegetation. Accompanied by WQS Marc Maestra during inspection.

Note: Upon our arrival, Mick Planinsek -Soild Waste Specialist for Bureau of Waste Management located on well pad discussing a complaint filed with DEP regarding a leaking Keystone Vac truck ﾿believed﾿ to have left this well site-unknown what truck was hauling.

1965938 2011-04-14 No Violations Noted At the time of inspection, site ID, ES plan, PPC plan and ESCGP-1 present. Well spud called for 4/13/11. Site surrounded by fence and locked gate. No rig onsite during this inspection. Well staked not yet drilled. Operator has removed all onsite pits from plan, as tanks (not yet onsite) will be utilized for drilling operations. Temporary bmp﾿s are installed and functioning as outlined in ES plan, all previously disturbed areas have been seeded/mulched with observed growth. Operator should continue to routinely monitor and maintain all bmp﾿s until permanent restoration has been achieved. No accelerated erosion or sedimentation issues noteD onsite or access road. Access road is stable. Follow up inspection will be conducted during drilling operations.
1969231 2011-04-29 No Violations Noted During inspection, valid site Id sign, ES plan, ESCGP-1, and sewage permit (waste holding tank) located onsite. Well spud updated to 4/25/11. Noted that PPC plan contacts were not updated, specifically those within the DEP. 24hr security guard located onsite. Rig located onsite actively drilling well. No pits located on pad, operator utilizing closed containment tanks, which appear structurally sound with freeboard. Operator installed ﾿containment pad beneath rig﾿ in order to prevent a possible pollution event. Noted a wood chip pile located on right had side of rig, no industrial waste or discharge detected during inspection, although recommended operator further investigate pile. remove drill piping from sediment ditch, in order to prevent a possible pollution event. Sediment ditches and traps appear adequately rocked and surrounding disturbance temporally seeded/mulched, but minimal growth observed. No accelerated ES issues. Operator should continue to routinely monitor/maintain all BMP﾿s until final restoration is completed.
1975380 2011-05-18 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief hired UDI rig 60. Larry Mirers is the company representative. Conductor pipe set at 60 ft using 24﾿ pipe. First stringer set at 223 ft with 20﾿ pipe and used 260 sks of Class A with 20 bbl return. Second stringer set at 593 ft with 13 3/8﾿ pipe using Gas block of 480 sacks with 21 bbl return. Third stringer was set at 1831 feet using 9 5/8﾿ pipe with 615 sks and 18 bbl return. Current depth was at 12382 feet. Pilot hole was at 8982 ft. Kick off point was 8200 feet. Vertical depth was 8700 ft. and horizontal length was 3400 ft. E&S controls were in place.
1975383 2011-05-06 No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief hired UDI rig 60. Larry Mirers is the company representative. Conductor pipe set at 60 ft using 24﾿ pipe. First stringer set at 223 ft with 20﾿ pipe and used 260 sks of Class A with 20 bbl return. Second stringer set at 593 ft with 13 3/8﾿ pipe using Gas block of 480 sacks with 21 bbl return. Third stringer was set at 1831 feet using 9 5/8﾿ pipe with 615 sks and 18 bbl return. Current depth was at 6811 feet. Pilot hole was going to 7700 feet. Estimated kick off should be around 6821 feet. E&S controls were in place.
1975392 2011-04-26 No Violations Noted no e&s or iw issues. chief hired UDI. conductor set at 60 ft (24"). first stringer set at 223 ft (20").
2034125 2012-01-10 No Violations Noted During this inspection, site gated with security. Site Id sign, permit, ESCGP-1 and PPC plan present. Well drilled and recently fraced. Well spudded 4/25/11. Reminder well site restoration due 9 months from completion of drilling.

Secondary containment located on well pad, recommend operator remove as soon as possible in order to prevent a possible pollution event as structural integrity of containment appears compromised as berms have been removed and various holes observed. Forty-five frac tanks located onsite which appear to be structurally sound. One covered roll off box located onsite. No accelerated erosion or sedimentation issues noted during this inspection. Temporary bmp's installed and maintained. Site temporarily stabilized with vegetative matting. Access road stable, noted operator performed maintenance on access road since last inspection. No violations noted during this inspection. Accompanied by WQS Marc Maestra during inspection.

2067317 2012-05-01 No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2102876 2012-09-21 No Violations Noted Inspection the result of the Operatorsï¾’ request to discuss the restoration of the well pad area. At the time of inspection the site appeared to be in sound condition. The E&S plan was onsite and appeared to be implemented properly. All BMPs appear to be in installed and maintained as outline in the plan. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The Departments suggests the Operator maintain the perimeter control while restoring the site and inspect weekly and after significant precipitation event to ensure the continued stability of the site. The Department notes that the restoration plan calls for the restored cut and fill slopes of 3:1 and the dispersal of the top soil stock pile, however the approved plan does not call for the reduction in the size of the well pad.
2337709 2015-01-22 No Violations Noted Drilling appeared to have been completed

For data sources see[3]

References