X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20298"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20298
 
| Well ID: 37-111-20298
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.788138, -79.342472 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.788139, -79.342472 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 
|-
 
|-
| Well Pad ID: [[146417|146417]]
+
| Municipality: [[Addison Township,_Somerset_County,_Pennsylvania|Addison Township]]
 
|-
 
|-
| Farm/Lease Name: BLUEBAUGH UNIT 1H
+
| Operator Name: [[LPR ENERGY LLC]]
 
|-
 
|-
| First Permit Date: 2010-08-26
+
| Well Pad ID: [[146417]]
 
|-
 
|-
| Last Permit Date: 2010-08-26
+
| Farm/Lease Name: BLUEBAUGH UNIT 1H
 
|-
 
|-
| Spud Date: 2011-04-21
+
| License Status: Regulatory Inactive Status
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 04/21/2011
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 8/26/2010
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 1
+
| Configuration: Horizontal Well
 
|-
 
|-
| Latitude: 39.788138
+
| Latitude: 39.788139
 
|-
 
|-
 
| Longitude: -79.342472
 
| Longitude: -79.342472
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2010
 +
| [[CHIEF OIL & GAS LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2011
| style="text-align:right;" | 0.0
+
| [[CHIEF OIL & GAS LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2017
| style="text-align:right;" | 0.0
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2012-1
+
| [[LPR ENERGY LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2013-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-02
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 168.16
+
| style="text-align: right;" | 882.34 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 101421
+
| 100081
| SHADE LANDFILL
 
| CAIRNBROOK
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 882.34
+
| style="text-align: right;" | 168.16 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 100081
+
| 101421
| SOUTHERN ALLEGHENIES LANDFILL
 
| DAVIDSVILLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,160.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| EPA ID: 748-163
 
| EPA ID: 748-163
| PATRIOT WATER TREATMENT
 
| WARREN
 
| OH
 
 
|-
 
|-
 +
| 2011-2
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 290.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| DRILLING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 290.0
+
| style="text-align: right;" | 4,120.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 115.0
+
| style="text-align: right;" | 115.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|
 
 
|  
 
|  
|-
 
|-
 
| 2011-2
 
| FRACING FLUID WASTE
 
| style="text-align:right;" | 4.0
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 50.0
+
| style="text-align: right;" | 50.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
| 2003238
+
| 1969366
| 2011-09-08
+
| Primary Facility
 +
| 04/29/2011
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, well sign, ES plan, and ESCGP-1 present. Site gated with 24hr security onsite. Well drilled not yet in production. Pad actively being re-rocked. Frac (empty) tanks present onsite; noted several with bottom lids open. Recommend operator close tank links in order to prevent a possible pollution and/or safety incident. All previously disturbed areas have been seeded and mulched with growth observed. BMPs installed and functioning, appears sediment trap is full. Operator should continue to monitor and maintain ALL BMPs until final restoration is complete. No accelerated erosion or sedimentation issues noted.  
+
| At the time of inspection, valid site Id sign, ES plan, and ESCGP-1(final approval 4/14/11), located onsite. Well spud 4/20/11. Noted that PPC plan contacts were not updated, specifically those within the DEP. 24hr security guard located onsite. Rig located onsite actively drilling well. No pits located on pad, operator utilizing closed containment tanks, which appear structurally sound with freeboard. Operator installed ¿containment pad beneath rig¿ in order to prevent a possible pollution event. No accelerated erosion or sedimentation issues observed. BMP¿s installed according to ES plan. Operator should continue to routinely monitor/maintain all BMP¿s until final restoration is completed. Access road stable.
Accompanied by WQS Marc Maestra during inspection.  
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 1975381
 +
| Primary Facility
 +
| 05/06/2011
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5.  Conductor pipe set at 32 ft using 26¿ pipe.  First stringer set at 419 ft using 20¿ pipe.  Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns.  Second stringer set at 13 3/8¿ to 621 feet with gas block of 20 bbl return.  Third stringer set at 1791 ft of 9 5/8¿ pipe with 650 sks of gas block with 25 bbl return.  Current depth set at 5000 feet.  Bridge plug set at 1700 ft into the 9 5/8¿.
 
|-
 
|-
| 2016702
+
| 1975386
| 2011-11-01
+
| Primary Facility
| Violation(s) Noted
+
| 04/26/2011
| Inspection result of reported incident received by myself (as well as Marc Maestra) via phone call on Tues November 1, 2011 at 1050am from Chad Eisenman of Chevron. He called to provide notification of a discharge/release of an undetermined amount of flow back on to the grounds of the commonwealthHe stated that it is believed that secondary containment located beneath frac tanks overflowed. At the time of phone call no further data was available.  
+
| Drilling/Alteration
 
+
| No Violations Noted
At the time of inspection, Chevron Regulatory Compliance personnel  onsite, as well as KMI trucking with vac trucks. Well sign, ES plan ,PPC plan onsite. It appears that flow back (still undetermined amount) did indeed overtop secondary containment, at this time no "liquid" present on pad, several small puddles noted outside of containment and along access road. Noted minor staining on pad and roadway
+
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5Conductor pipe set at 32 ft using 26¿ pipe. First stringer set at 419 ft using 20¿ pipe. Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns. No voids or mines present. Hence, no baskets were used. Chief underlain drilling rig and associated equipment with protective layer of grip plastic for the prevention of a surface release. The site is bermed around the edges of the plastic.
 
 
| 623903
 
| 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
 
|
 
 
|-
 
|-
 +
| 2003238
 +
| Primary Facility
 +
| 09/08/2011
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection, well sign, ES plan, and ESCGP-1 present. Site gated with 24hr security onsite. Well drilled not yet in production. Pad actively being re-rocked. Frac (empty) tanks present onsite; noted several with bottom lids open. Recommend operator close tank links in order to prevent a possible pollution and/or safety incident. All previously disturbed areas have been seeded and mulched with growth observed. BMPs installed and functioning, appears sediment trap is full. Operator should continue to monitor and maintain ALL BMPs until final restoration is complete. No accelerated erosion or sedimentation issues noted.
 
|-
 
|-
 
| 2016702
 
| 2016702
| 2011-11-01
+
| Primary Facility
 +
| 11/01/2011
 +
| Incident- Response to Accident or Event
 
| Violation(s) Noted
 
| Violation(s) Noted
| Inspection result of reported incident received by myself (as well as Marc Maestra) via phone call on Tues November 1, 2011 at 1050am from Chad Eisenman of Chevron. He called to provide notification of a discharge/release of an undetermined amount of flow back on to the grounds of the commonwealth.  He stated that it is believed that secondary containment located beneath frac tanks overflowed. At the time of phone call no further data was available.  
+
| Inspection result of reported incident received by myself (as well as Marc Maestra) via phone call on Tues November 1, 2011 at 1050am from Chad Eisenman of Chevron. He called to provide notification of a discharge/release of an undetermined amount of flow back on to the grounds of the commonwealth.  He stated that it is believed that secondary containment located beneath frac tanks overflowed. At the time of phone call no further data was available.
 
 
At the time of inspection, Chevron Regulatory Compliance personnel  onsite, as well as KMI trucking with vac trucks. Well sign, ES plan ,PPC plan onsite. It appears that flow back (still undetermined amount) did indeed overtop secondary containment, at this time no "liquid" present on pad, several small puddles noted outside of containment and along access road. Noted minor staining on pad and roadway
 
 
 
| 623903
 
| 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution
 
|
 
|-
 
 
|-
 
|-
 
| 2017970
 
| 2017970
| 2011-11-03
+
| Primary Facility
 +
| 11/03/2011
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| follow up to operator reported incident on 11-1-11.  At the time of inspection, it appears operator has removed approximately 6 inches of "pad" from areas affected by release.  Contaminated soils are located on secondary containment on well pad. Department also observed various pilot test holes most likely used to determine the depth of extend of contamination--at this time visible evidence(liquid fraction or staining) of contamination not observed in holes. Operator also removed soils from access road. At the time of this inspection, it appears operator has controlled release and no "visible" evidence identified that area still contaminated by release, operator indicated plans to conduct sampling to ensure all continmated soils were removed, as well as confirm the area of contamination(width and depth). No new violations noted during this inspection, clean up of spill ongoing.Follow up inspections will be conducted to monitor and ensure clean up meaures  are being dillegently proceeded with.
 
| follow up to operator reported incident on 11-1-11.  At the time of inspection, it appears operator has removed approximately 6 inches of "pad" from areas affected by release.  Contaminated soils are located on secondary containment on well pad. Department also observed various pilot test holes most likely used to determine the depth of extend of contamination--at this time visible evidence(liquid fraction or staining) of contamination not observed in holes. Operator also removed soils from access road. At the time of this inspection, it appears operator has controlled release and no "visible" evidence identified that area still contaminated by release, operator indicated plans to conduct sampling to ensure all continmated soils were removed, as well as confirm the area of contamination(width and depth). No new violations noted during this inspection, clean up of spill ongoing.Follow up inspections will be conducted to monitor and ensure clean up meaures  are being dillegently proceeded with.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2034625
 +
| Primary Facility
 +
| 01/10/2012
 +
| Compliance Evaluation
 +
| Outstanding Violations - No Viols Req'd
 +
| Clean up measures /restoration ongoing. Site not yet stabilized from excavation. Contaminated soils removed hauled off. Samples taken. Written opr response and sample results recieved by department follow up inspection will be conducted to ensure site is properly stabilized.
 
|-
 
|-
| 1969366
+
| 2046720
| 2011-04-29
+
| Primary Facility
 +
| 02/22/2012
 +
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, valid site Id sign, ES plan, and ESCGP-1(final approval 4/14/11), located onsite. Well spud 4/20/11. Noted that PPC plan contacts were not updated, specifically those within the DEP. 24hr security guard located onsite. Rig located onsite actively drilling well. No pits located on pad, operator utilizing closed containment tanks, which appear structurally sound with freeboard. Operator installed ﾿containment pad beneath rig﾿ in order to prevent a possible pollution event. No accelerated erosion or sedimentation issues observedBMP﾿s installed according to ES plan. Operator should continue to routinely monitor/maintain all BMP﾿s until final restoration is completed. Access road stable.
+
| CEI inspection for reportable release of flow back water onto and outside of secondary containment on 10/01/11.  At the time of this inspection, site id sign, ESCGP-1, ES & PPC plan present. Security guard located at site entrance. Access road stable no accelerated ES. Well pad appears to be restored --previously excavated areas have reclaimed as additional fill materials placed on pad. All excavated materials were placed in roll off boxes and properly disposed of according to regulationOne roll off box remains onsite.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2067305
 +
| Primary Facility
 +
| 05/04/2012
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
|-
 
|-
| 1975381
+
| 2069403
| 2011-05-06
+
| Primary Facility
 +
| 05/10/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5. Conductor pipe set at 32 ft using 26﾿ pipe.  First stringer set at 419 ft using 20﾿ pipe.  Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returnsSecond stringer set at 13 3/8﾿ to 621 feet with gas block of 20 bbl returnThird stringer set at 1791 ft of 9 5/8﾿ pipe with 650 sks of gas block with 25 bbl return. Current depth set at 5000 feet. Bridge plug set at 1700 ft into the 9 5/8﾿.
+
| At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Access road adequately rocked, no accelerated erosion or sedimentation issues noted. Well drilled, not yet in production. Previously disturbed areas seeded/mulched with observed growthAppears site has been adequately restoredPad adequately rocked. no accelerated erosion or sedimentation issues noted on site. No violations noted during this inspection.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2093092
 +
| Primary Facility
 +
| 06/21/2012
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
 
|-
 
|-
| 1975386
+
| 2102882
| 2011-04-26
+
| Primary Facility
 +
| 09/21/2012
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5Conductor pipe set at 32 ft using 26﾿ pipeFirst stringer set at 419 ft using 20﾿ pipe.  Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns.  No voids or mines presentHence, no baskets were usedChief underlain drilling rig and associated equipment with protective layer of grip plastic for the prevention of a surface release.  The site is bermed around the edges of the plastic.
+
| Inspection the result of the Operators’ request to discuss the restoration of the well pad area.  At the time of inspection the site appeared to be in sound conditionThe E&S plan was onsite and appeared to be implemented properlyAll BMPs appear to be in installed and maintained as outline in the plan.  No accelerated erosion or sedimentation observed in relation to the access road or well pad areaThe Departments suggests the Operator maintain the perimeter control while restoring the site and inspect weekly and after significant precipitation event to ensure the continued stability of the siteThe Department notes that the restoration plan calls for the restored cut and fill slopes of 3:1 and the dispersal of the top soil stock pile, however the approved plan does not call for the reduction in the size of the well pad.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2121592
 +
| Primary Facility
 +
| 11/28/2012
 +
| Site Restoration
 +
| No Violations Noted
 +
| Site ID sign, E&S plan, ESCGP1, permit all on-site. HQ watershed. At time of inspection, well drilled, not yet equipped for production. Security on-site.
 
|-
 
|-
| 2034625
+
| 2337710
| 2012-01-10
+
| Primary Facility
| Outstanding Violations - No Viols Req'd
+
| 01/22/2015
| Clean up measures /restoration ongoing. Site not yet stabilized from excavation. Contaminated soils removed hauled off. Samples taken. Written opr response and sample results recieved by department follow up inspection will be conducted to ensure site is properly stabilized.
+
| Routine/Complete Inspection
|
+
| No Violations Noted
|
+
| Drilling appeared to have been completed, well was not equipped for production. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road.  Site had been constructed in accordance with the E&S plan contained within the ESCGP permit located onsite.
|
 
 
|-
 
|-
 +
| 2486276
 +
| Primary Facility
 +
| 2016-05-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| well inactive.  no issues onsite
 
|-
 
|-
| 2046720
+
| 2532262
| 2012-02-22
+
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| CEI inspection for reportable release of flow back water onto and outside of secondary containment on 10/01/11.  At the time of this inspection, site id sign, ESCGP-1, ES & PPC plan present.  Security guard located at site entrance. Access road stable no accelerated ES.  Well pad appears to be restored --previously excavated areas have reclaimed as additional fill materials placed on pad. All excavated materials were placed in roll off boxes and properly disposed of according to regulation.  One roll off box remains onsite.
+
| no issuessystem running
Department unable to visibly note any remnants of spill at time of this inspection.  All confirmatory sample results submited by department were below Act 2 standards,  although it was noted that several samples demonstrated elevated chlorides and barium  levels as a result those areas were further excavated accordingly.   
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2559731
 +
| Primary Facility
 +
| 2017-02-07
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Single well Marcellus pad.
 +
According to Department records, well was SPUD on 4-21-2011, frac'd 10-2011 and given INACTIVE status on 5-23-12. The ESCGP-1 (ESX11-111-0002) for this site was terminated on 7-13-15.
 +
At time of inspection site ID sign, well permit, PPC plan, ERP, ESCGP-1 and  E&S plan on site.
 +
No E&S issues observed on rocked access road. Gate located at well pad entrance. Site fenced. Well pad rocked, no E&S issues observed.
 +
Well head surrounded by security fence. Well tag present and legible. Well does not appear equipped for production.
 +
Operator is reminded that as per 25 Pa. Code § 78a.104, approval of inactive status for a well is valid for 5 years unless revoked. After 5 years, the owner or operator shall plug or return to active status a well granted inactive status unless the Department grants an application for a 1-year extension.
 
|-
 
|-
| 2067305
+
| 2626068
| 2012-05-04
+
| Primary Facility
 +
| 2017-08-16
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
+
| well is at inactive mode.  no issues at the site.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2656060
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well is shut in. Annulus open. No. Pressure. Wel sign and tag present. Gates on well locked.  No issues at well site
 
|-
 
|-
| 2069403
+
| 2671996
| 2012-05-10
+
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Access road adequately rocked, no accelerated erosion or sedimentation issues noted. Well drilled, not yet in production. Previously disturbed areas seeded/mulched with observed growthAppears site has been adequately restored. Pad adequately rocked. no accelerated erosion or sedimentation issues noted on site. No violations noted during this inspection.
+
| Lpr energy filed for,inactive status. No issues at the site. well tag present.
|  
+
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 10/20/2011
 +
| 10/20/2011
 +
| style="text-align: right;" | 8951.00
 +
| style="text-align: right;" | 2,978,576.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="11"| 1
 +
| rowspan="1"| Clean Volume (gals)
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 91.47
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST 50
 +
| rowspan="1"| CESI Chemical
 +
| rowspan="1"| Friction Reducer
 +
| Distillates, petroleum, hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.03
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| 7.5 Hcl Acid
 +
| rowspan="1"|
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 7.50
 +
| style="text-align: right;" | 0.26
 +
| style="text-align: right;" |
 
|-
 
|-
| 2093092
+
|- valign="top"
| 2012-06-21
+
| rowspan="1"| GBL
| No Violations Noted
+
| rowspan="1"| Clearwater International
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production
+
| rowspan="1"| Gel Breaker
|  
+
| Ethylene glycol
|  
+
| 107-21-1
|  
+
| style="text-align: right;" | 60.00
 +
| style="text-align: right;" | 0.00002000
 +
| style="text-align: right;" |  
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00691000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2102882
+
|- valign="top"
| 2012-09-21
+
| rowspan="1"| CMHPG
| No Violations Noted
+
| rowspan="1"| Ashland
| Inspection the result of the Operatorsï¾’ request to discuss the restoration of the well pad area.  At the time of inspection the site appeared to be in sound condition.  The E&S plan was onsite and appeared to be implemented properly.  All BMPs appear to be in installed and maintained as outline in the plan.  No accelerated erosion or sedimentation observed in relation to the access road or well pad area.  The Departments suggests the Operator maintain the perimeter control while restoring the site and inspect weekly and after significant precipitation event to ensure the continued stability of the site.  The Department notes that the restoration plan calls for the restored cut and fill slopes of 3:1 and the dispersal of the top soil stock pile, however the approved plan does not call for the reduction in the size of the well pad.
+
| rowspan="1"| Water Viscosifier
 +
| Carboxymethylhydroxyporoyl guar blend
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 0.00129000
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant (lbs)
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.00
 +
| style="text-align: right;" | 8.53
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Scale Inhibitor A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00674000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2121592
+
|- valign="top"
| 2012-11-28
+
| rowspan="3"| Biocide EC 6116A
| No Violations Noted
+
| rowspan="3"| Nalco
| Site ID sign, E&S plan, ESCGP1, permit all on-site. HQ watershed. At time of inspection, well drilled, not yet equipped for production. Security on-site.
+
| rowspan="3"| Biocide
Site restored to PCSM Plan. Pad permanently stabilized. Site seeded and mulched with growth observed through light snow cover. Department recommends that Operator continues to monitor site to ensure that the required 70% vegetative cover is reached. Access road adequately rocked. No E&S issues were observed in relation to the access road or well-site.
+
| Polyethylene glycol
 
+
| 25322-68-3
|  
+
| style="text-align: right;" | 60.00
|  
+
| style="text-align: right;" | 0.01
|  
+
| style="text-align: right;" |  
 
|-
 
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30.00
 +
| style="text-align: right;" | 0.00683000
 +
| style="text-align: right;" |
 
|-
 
|-
| 2337710
+
| Dibromoacetonitrile
| 2015-01-22
+
| 3252-43-5
| No Violations Noted
+
| style="text-align: right;" | 5.00
| Drilling appeared to have been completed
+
| style="text-align: right;" | 0.00114000
|  
+
| style="text-align: right;" |  
|  
 
|  
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 03:44, 15 July 2019

Well Details

Well ID: 37-111-20298
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 146417
Farm/Lease Name: BLUEBAUGH UNIT 1H
License Status: Regulatory Inactive Status
Spud Date: 04/21/2011
Permit Date: 8/26/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.788139
Longitude: -79.342472

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2019 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-1 Drill Cuttings (in Tons) 882.34 Tons LANDFILL 100081
2011-1 Drill Cuttings (in Tons) 168.16 Tons LANDFILL 101421
2011-1 Drilling Fluid Waste (in Barrels) 1,160.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2011-2 Drilling Fluid Waste (in Barrels) 290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-2 Fracing Fluid Waste (in Barrels) 4,120.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-2 Fracing Fluid Waste (in Barrels) 115.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-1 Fracing Fluid Waste (in Barrels) 50.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1969366 Primary Facility 04/29/2011 Routine/Complete Inspection No Violations Noted At the time of inspection, valid site Id sign, ES plan, and ESCGP-1(final approval 4/14/11), located onsite. Well spud 4/20/11. Noted that PPC plan contacts were not updated, specifically those within the DEP. 24hr security guard located onsite. Rig located onsite actively drilling well. No pits located on pad, operator utilizing closed containment tanks, which appear structurally sound with freeboard. Operator installed ¿containment pad beneath rig¿ in order to prevent a possible pollution event. No accelerated erosion or sedimentation issues observed. BMP¿s installed according to ES plan. Operator should continue to routinely monitor/maintain all BMP¿s until final restoration is completed. Access road stable.
1975381 Primary Facility 05/06/2011 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5. Conductor pipe set at 32 ft using 26¿ pipe. First stringer set at 419 ft using 20¿ pipe. Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns. Second stringer set at 13 3/8¿ to 621 feet with gas block of 20 bbl return. Third stringer set at 1791 ft of 9 5/8¿ pipe with 650 sks of gas block with 25 bbl return. Current depth set at 5000 feet. Bridge plug set at 1700 ft into the 9 5/8¿.
1975386 Primary Facility 04/26/2011 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief contracted UDI rig 5. Conductor pipe set at 32 ft using 26¿ pipe. First stringer set at 419 ft using 20¿ pipe. Universal performed cement for first stringer and used 470 sks of gas block with 20 bbl returns. No voids or mines present. Hence, no baskets were used. Chief underlain drilling rig and associated equipment with protective layer of grip plastic for the prevention of a surface release. The site is bermed around the edges of the plastic.
2003238 Primary Facility 09/08/2011 Routine/Complete Inspection No Violations Noted At the time of inspection, well sign, ES plan, and ESCGP-1 present. Site gated with 24hr security onsite. Well drilled not yet in production. Pad actively being re-rocked. Frac (empty) tanks present onsite; noted several with bottom lids open. Recommend operator close tank links in order to prevent a possible pollution and/or safety incident. All previously disturbed areas have been seeded and mulched with growth observed. BMPs installed and functioning, appears sediment trap is full. Operator should continue to monitor and maintain ALL BMPs until final restoration is complete. No accelerated erosion or sedimentation issues noted.
2016702 Primary Facility 11/01/2011 Incident- Response to Accident or Event Violation(s) Noted Inspection result of reported incident received by myself (as well as Marc Maestra) via phone call on Tues November 1, 2011 at 1050am from Chad Eisenman of Chevron. He called to provide notification of a discharge/release of an undetermined amount of flow back on to the grounds of the commonwealth. He stated that it is believed that secondary containment located beneath frac tanks overflowed. At the time of phone call no further data was available.
2017970 Primary Facility 11/03/2011 Follow-up Inspection Outstanding Violations - No Viols Req'd follow up to operator reported incident on 11-1-11. At the time of inspection, it appears operator has removed approximately 6 inches of "pad" from areas affected by release. Contaminated soils are located on secondary containment on well pad. Department also observed various pilot test holes most likely used to determine the depth of extend of contamination--at this time visible evidence(liquid fraction or staining) of contamination not observed in holes. Operator also removed soils from access road. At the time of this inspection, it appears operator has controlled release and no "visible" evidence identified that area still contaminated by release, operator indicated plans to conduct sampling to ensure all continmated soils were removed, as well as confirm the area of contamination(width and depth). No new violations noted during this inspection, clean up of spill ongoing.Follow up inspections will be conducted to monitor and ensure clean up meaures are being dillegently proceeded with.
2034625 Primary Facility 01/10/2012 Compliance Evaluation Outstanding Violations - No Viols Req'd Clean up measures /restoration ongoing. Site not yet stabilized from excavation. Contaminated soils removed hauled off. Samples taken. Written opr response and sample results recieved by department follow up inspection will be conducted to ensure site is properly stabilized.
2046720 Primary Facility 02/22/2012 Compliance Evaluation No Violations Noted CEI inspection for reportable release of flow back water onto and outside of secondary containment on 10/01/11. At the time of this inspection, site id sign, ESCGP-1, ES & PPC plan present. Security guard located at site entrance. Access road stable no accelerated ES. Well pad appears to be restored --previously excavated areas have reclaimed as additional fill materials placed on pad. All excavated materials were placed in roll off boxes and properly disposed of according to regulation. One roll off box remains onsite.
2067305 Primary Facility 05/04/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2069403 Primary Facility 05/10/2012 Routine/Complete Inspection No Violations Noted At the time of this inspection, site Id sign, Es plan, ESCGP-1, and PPC plan onsite. Site gated and monitored by 24hr security. Access road adequately rocked, no accelerated erosion or sedimentation issues noted. Well drilled, not yet in production. Previously disturbed areas seeded/mulched with observed growth. Appears site has been adequately restored. Pad adequately rocked. no accelerated erosion or sedimentation issues noted on site. No violations noted during this inspection.
2093092 Primary Facility 06/21/2012 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2102882 Primary Facility 09/21/2012 Routine/Complete Inspection No Violations Noted Inspection the result of the Operators’ request to discuss the restoration of the well pad area. At the time of inspection the site appeared to be in sound condition. The E&S plan was onsite and appeared to be implemented properly. All BMPs appear to be in installed and maintained as outline in the plan. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The Departments suggests the Operator maintain the perimeter control while restoring the site and inspect weekly and after significant precipitation event to ensure the continued stability of the site. The Department notes that the restoration plan calls for the restored cut and fill slopes of 3:1 and the dispersal of the top soil stock pile, however the approved plan does not call for the reduction in the size of the well pad.
2121592 Primary Facility 11/28/2012 Site Restoration No Violations Noted Site ID sign, E&S plan, ESCGP1, permit all on-site. HQ watershed. At time of inspection, well drilled, not yet equipped for production. Security on-site.
2337710 Primary Facility 01/22/2015 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed, well was not equipped for production. There was no observed accelerated erosion or sedimentation observed in relation to the site or access road. Site had been constructed in accordance with the E&S plan contained within the ESCGP permit located onsite.
2486276 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted well inactive. no issues onsite
2532262 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted no issues. system running
2559731 Primary Facility 2017-02-07 Routine/Complete Inspection No Violations Noted Single well Marcellus pad.

According to Department records, well was SPUD on 4-21-2011, frac'd 10-2011 and given INACTIVE status on 5-23-12. The ESCGP-1 (ESX11-111-0002) for this site was terminated on 7-13-15. At time of inspection site ID sign, well permit, PPC plan, ERP, ESCGP-1 and E&S plan on site. No E&S issues observed on rocked access road. Gate located at well pad entrance. Site fenced. Well pad rocked, no E&S issues observed. Well head surrounded by security fence. Well tag present and legible. Well does not appear equipped for production. Operator is reminded that as per 25 Pa. Code § 78a.104, approval of inactive status for a well is valid for 5 years unless revoked. After 5 years, the owner or operator shall plug or return to active status a well granted inactive status unless the Department grants an application for a 1-year extension.

2626068 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted well is at inactive mode. no issues at the site.
2656060 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted Well is shut in. Annulus open. No. Pressure. Wel sign and tag present. Gates on well locked. No issues at well site
2671996 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Lpr energy filed for,inactive status. No issues at the site. well tag present.

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/20/2011 10/20/2011 8951.00 2,978,576.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Clean Volume (gals) Carrier/Base Fluid 100.00 91.47
Unislik ST 50 CESI Chemical Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.26
GBL Clearwater International Gel Breaker Ethylene glycol 107-21-1 60.00 0.00002000
Iron Control A Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00691000
CMHPG Ashland Water Viscosifier Carboxymethylhydroxyporoyl guar blend 100.00 0.00129000
Proppant (lbs) Proppant 100.00 8.53
Scale Inhibitor A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00674000
Biocide EC 6116A Nalco Biocide Polyethylene glycol 25322-68-3 60.00 0.01
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00683000
Dibromoacetonitrile 3252-43-5 5.00 0.00114000

For data sources see[7]

References