X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20312"

m
m
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
__TOC__
 
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20312
 
| Well ID: 37-111-20312
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 39.743483, -79.357658 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.743483, -79.357658 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Somerset County, Pennsylvania|Somerset]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Addison Township, Somerset County, Pennsylvania|Addison Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Somerset_County,_Pennsylvania|Somerset]]
 +
|-
 +
| Municipality: [[Addison Township,_Somerset_County,_Pennsylvania|Addison Township]]
 +
|-
 +
| Operator Name: [[LPR ENERGY LLC]]
 
|-
 
|-
 
| Well Pad ID: [[149069]]
 
| Well Pad ID: [[149069]]
Line 15: Line 19:
 
| Farm/Lease Name: PMG ALLEN UNIT 3H
 
| Farm/Lease Name: PMG ALLEN UNIT 3H
 
|-
 
|-
| First Permit Date: 2012-07-23
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2012-07-23
+
| Spud Date: 2012-11-05
 
|-
 
|-
| Spud Date: 2012-10-31
+
| Permit Date: 2012-07-23
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: No
 
|-
 
|-
 
| Latitude: 39.743483
 
| Latitude: 39.743483
 
|-
 
|-
 
| Longitude: -79.357658
 
| Longitude: -79.357658
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-07-23
 +
| New Permit Application
 +
|-
 +
| 2012-10-31
 +
| Performed Spud Operation
 +
|-
 +
| 2013-10-11
 +
| Drilling Completion
 +
|-
 +
| 2014-08-06
 +
| Perforation
 +
|-
 +
| 2015-06-29
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2014-08-06
 +
| 2014-08-11
 +
| style="text-align: right;" | 8,890
 +
| style="text-align: right;" | 6,980,660
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="18"| 1
 +
| rowspan="1"| 15% Acid
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Perf Cleanup
 +
| Hydrocloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00655249
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| L058
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Iron Stabilizer
 +
| Sodium erythorbate
 +
| 6381-77-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00032384
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00349811
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| J134
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gel Breaker
 +
| Hemicellulase Enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0015029
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6486A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00078117
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 12.0573
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| J580
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gelling Agent
 +
| Carboydrate polymer
 +
| Proprietary
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0324211
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| A264
 +
| rowspan="4"| Schlumberger
 +
| rowspan="4"| Iron Control
 +
| Prop-2-yn-1-ol
 +
| 107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00000849
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic acids
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00002547
 +
| style="text-align: right;" | 0
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.00003395
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic alcohols, ethoxylayed #1
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00002547
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| B466
 +
| rowspan="3"| Schlumberger
 +
| rowspan="3"| Friction Reducer
 +
| Distillates (petroleum), hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.000758
 +
| style="text-align: right;" | 0
 +
|-
 +
| Ammonium Acetate
 +
| 631-61-8
 +
| style="text-align: right;" | 6
 +
| style="text-align: right;" | 0.0001516
 +
| style="text-align: right;" | 0
 +
|-
 +
| Alcohol Ethoxylates
 +
| Proprietary
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00012633
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC6116A
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00012566
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00075395
 +
| style="text-align: right;" | 0
 +
|-
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.0015079
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Base Fluid
 +
| rowspan="1"| Chevron
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water (Including Mix Water Supplied by Client)
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 87.8029
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 874,143.00
 +
| style="text-align: right;" | 331
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 425,232.14
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 487,107.00
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 460,891.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| style="text-align: right;" | 371,407.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 88.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 472.78 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 95.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 492.74 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 448.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 2,727.67 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 28.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 82.50 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 58.23 Tons
 +
| LANDFILL
 +
| 76-00-08
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 23.48 Tons
 +
| LANDFILL
 +
| 100592
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 4,304.17 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 13.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 10,916.84 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 0.11 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,418.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 560.00 Bbl
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
|
 +
|-
 +
| 2016
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,521.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 446.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2017
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 441.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 227.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 499.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 924.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2018
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 170.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,753.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D561BSOM
 +
|-
 +
| 2019
 +
| [[LPR ENERGY LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 157.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW010
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2120861
 
| 2120861
 +
| Primary Facility
 
| 2012-11-30
 
| 2012-11-30
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Surface casing was set at 60feet from grade with 36 sacks of Type I (24” pipe).
 
| At the time of inspection, no E&S issues were present at the site. Surface casing was set at 60feet from grade with 36 sacks of Type I (24” pipe).
|
 
|-
 
 
|-
 
|-
 
| 2121601
 
| 2121601
 +
| Primary Facility
 
| 2012-11-28
 
| 2012-11-28
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Inspection result of spud notification. Multi-well pad.
 
| Inspection result of spud notification. Multi-well pad.
Site ID sign, valid permit, E&S plan, ESCGPI, PPC Plan present at access road entrance. Security on-site.
 
At the time of this inspection, cellar for 3H constructed. Actively drilling 5H, 1H had been drilled, cellars for 2H,4H constructed, 6H staked.
 
Minor erosion on hillside observed on back left corner of pad when facing wellheads from access road. Minor sediment from this erosion observed at base of hill in rock-lined ditch.
 
Observed tophole cuttings along soil pile. Department spoke with company representative who stated plans were to incorporate cuttings into soil pile and disperse across pad. Operator will address erosion concerns by routinely monitoring this area in order to prevent pollution event due to accelerated erosion and sedimentation.
 
Access road adequately rocked and no E&S issues were noted in relation to access road.  Department recommends that Operator continues to monitor and maintain access road and well-site as necessary.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2123112
 
| 2123112
 +
| Primary Facility
 
| 2012-12-12
 
| 2012-12-12
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
|
 
|-
 
 
|-
 
|-
 
| 2128462
 
| 2128462
 +
| Primary Facility
 
| 2012-12-17
 
| 2012-12-17
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
 
| At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
|
 
|-
 
 
|-
 
|-
 
| 2130317
 
| 2130317
 +
| Primary Facility
 
| 2013-01-14
 
| 2013-01-14
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling 5H well.
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling 5H well.
|
 
|-
 
 
|-
 
|-
 
| 2143497
 
| 2143497
 +
| Primary Facility
 
| 2013-02-11
 
| 2013-02-11
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling 4H well.
 
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling 4H well.
 +
|-
 +
| 2143511
 +
| Primary Facility
 +
| 2013-02-22
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Chevron was drilling 6H well.
 +
|-
 +
| 2144635
 +
| Primary Facility
 +
| 2013-02-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 3H spudded, TD not yet reached. 1H had been drilled. 2H, 4H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121601) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
 +
|-
 +
| 2151602
 +
| Primary Facility
 +
| 2013-03-13
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Conductor (24 inch pipe) was set at 60 feet and cemented with 9 yds.  Water Protection Casing (16”) was set at 413 feet and was cemented with 450 sacks of Class A with 20 bbl. return.  Mine Protection Casing (11 ¾”) was set at 650 feet with a basket at 555 feet.  The mine casing was cemented with 325 sacks of Class A with 10 bbl. Return.  Intermediate protection casing (8 5/8”) was set at 1906 feet and was cemented with 502 sacks of Class A with 15 bbl. Return.  Chevron, David Freed and DEP performed a site walk through to inspect the site.
 +
|-
 +
| 2169708
 +
| Primary Facility
 +
| 2013-05-22
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2173637
 +
| Primary Facility
 +
| 2013-06-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Routine inspection no issues noted.
 +
|-
 +
| 2228140
 +
| Primary Facility
 +
| 2013-11-26
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was completing well 4H
 +
|-
 +
| 2228230
 +
| Primary Facility
 +
| 2013-10-31
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Well 3H was completed to 14,724 ft TD and casing 14,705 ft .  Casing was cemented to surface with 1220 sks Solucam as lead and 720 sks Va Cam cement as tail.
 +
|-
 +
| 2228631
 +
| Primary Facility
 +
| 2013-10-09
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Drilling 3H  MD at 14859 ft, KOP at 7645 ft, 1255 sks of lead and 545 sks of tail.
 +
|-
 +
| 2228685
 +
| Primary Facility
 +
| 2013-10-09
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Well 3H was completed to 14,724 ft TD and casing 14,705 ft .
 +
|-
 +
| 2229849
 +
| Primary Facility
 +
| 2013-09-26
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site. Gas well was not in production.  Chevron was setting up to drill 4HA.
 +
|-
 +
| 2235861
 +
| Primary Facility
 +
| 2014-01-13
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
 +
|-
 +
| 2244506
 +
| Primary Facility
 +
| 2014-02-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding  an additional ramp tp allow the pipeline company access to their well controls. The access road will only  be temporary.
 +
|-
 +
| 2250977
 +
| Primary Facility
 +
| 2014-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
|
 +
|-
 +
| 2252443
 +
| Primary Facility
 +
| 2014-03-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On 3/10/14 met with Alex Grant with Chevron and inspected the site.
 +
|-
 +
| 2298106
 +
| Primary Facility
 +
| 2014-08-20
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of inspection, no E&S issues were present at the site.  Chevron was in process of fracking well 5H.  Well 1H was temporary shut in.  Wells 4HA, 3H and 6H have been completed.  Well 2H will be completed the following week.
 +
|-
 +
| 2311280
 +
| Primary Facility
 +
| 2014-10-08
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Work was underway to equip a well for production.  A coil tubing rig was located onsite.  Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
 +
|-
 +
| 2408933
 +
| Primary Facility
 +
| 2015-09-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Unconventional multi-well pad.
 +
|-
 +
| 2486260
 +
| Primary Facility
 +
| 2016-05-19
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| no issues. system running
 +
|-
 +
| 2532218
 +
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running
 +
|-
 +
| 2549709
 +
| Primary Facility
 +
| 2016-12-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well Marcellus pad.
 +
Site ID sign, E&S plan, PPC plan and ERP on site.
 +
At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked.
 +
Well tag present and legible. Brine tank located in secondary containment appears structurally sound.
 +
Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.
 +
|-
 +
| 2594469
 +
| Primary Facility
 +
| 2017-04-25
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues
 +
|-
 +
| 2594583
 +
| Primary Facility
 +
| 2017-05-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| no issues.  system running
 +
|-
 +
| 2626055
 +
| Primary Facility
 +
| 2017-08-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| system running.  no issues.
 +
|-
 +
| 2656134
 +
| Primary Facility
 +
| 2017-11-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running no,issues
 +
|-
 +
| 2672032
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System running. No,issues
 +
|-
 +
| 2672069
 +
| Primary Facility
 +
| 2017-12-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
 +
|-
 +
| 2685384
 +
| Primary Facility
 +
| 2018-01-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| System producing.  Emergency contact present.  Well tag present.
 +
|-
 +
| 2700766
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well tag present and emergency contact information present.  No issues at the site
 +
|-
 +
| 2700820
 +
| Primary Facility
 +
| 2018-03-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
 +
|-
 +
| 2719554
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
 +
|-
 +
| 2766914
 +
| Primary Facility
 +
| 2018-08-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
 
|-
 
|-
| 2012-2
+
|}-->
| style="text-align:right;" | 0.0
+
<!--==== Penalties Applied ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Violation ID
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty ID
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty Code
| style="text-align:right;" | 0.0
+
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
|}
+
|}-->
== Waste Data ==
+
For data sources see<ref>{{cite web
{| class="wikitable sortable" width="95%"
+
| title =Oil and Gas Compliance Report
!scope="col" | PERIOD
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
!scope="col" | TYPE
+
| date = 2019-05-20
!scope="col" | QUANTITY
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
!scope="col" | UNITS
+
| accessdate = 2019-05-21 }}</ref>
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
|}
 
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 18:49, 15 May 2020

Well Details

Well ID: 37-111-20312
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 3H
License Status:
Spud Date: 2012-11-05
Permit Date: 2012-07-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 39.743483
Longitude: -79.357658

For data sources see[1][2][3]

Well History

Date Event
2012-07-23 New Permit Application
2012-10-31 Performed Spud Operation
2013-10-11 Drilling Completion
2014-08-06 Perforation
2015-06-29 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-08-06 2014-08-11 8,890 6,980,660

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00655249 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00032384 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00349811 0
J134 Schlumberger Gel Breaker Hemicellulase Enzyme 9012-54-8 100 0.0015029 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00078117 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 12.0573 0
J580 Schlumberger Gelling Agent Carboydrate polymer Proprietary 100 0.0324211 0
A264 Schlumberger Iron Control Prop-2-yn-1-ol 107-19-7 10 0.00000849 0
Aliphatic acids Proprietary 30 0.00002547 0
Methanol 67-56-1 40 0.00003395 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00002547 0
B466 Schlumberger Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 30 0.000758 0
Ammonium Acetate 631-61-8 6 0.0001516 0
Alcohol Ethoxylates Proprietary 5 0.00012633 0
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.00012566 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00075395 0
Polyethylene Glycol 25322-68-3 60 0.0015079 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 87.8029 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 874,143.00 331 0.00 0 0.00 0
2016 LPR ENERGY LLC 425,232.14 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 487,107.00 359 0.00 0 0.00 0
2018 LPR ENERGY LLC 460,891.00 361 0.00 0 0.00 0
2019 LPR ENERGY LLC 371,407.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 88.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 472.78 Tons LANDFILL 100172
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 95.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drill Cuttings 492.74 Tons LANDFILL 100419
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 448.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 82.50 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 58.23 Tons LANDFILL 76-00-08
2015 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 23.48 Tons LANDFILL 100592
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015 CHEVRON APPALACHIA LLC Fracing Fluid Waste 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 10,916.84 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016 LPR ENERGY LLC Produced Fluid 1,418.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016 LPR ENERGY LLC Produced Fluid 560.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016 LPR ENERGY LLC Produced Fluid 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016 CHEVRON APPALACHIA LLC Produced Fluid 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 LPR ENERGY LLC Produced Fluid 446.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017 LPR ENERGY LLC Produced Fluid 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 LPR ENERGY LLC Produced Fluid 441.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid 227.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid 499.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid 924.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid 170.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 LPR ENERGY LLC Produced Fluid 1,753.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid 157.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2120861 Primary Facility 2012-11-30 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Surface casing was set at 60feet from grade with 36 sacks of Type I (24” pipe).
2121601 Primary Facility 2012-11-28 Routine/Complete Inspection No Violations Noted Inspection result of spud notification. Multi-well pad.
2123112 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
2128462 Primary Facility 2012-12-17 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 2H well.
2130317 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling 5H well.
2143497 Primary Facility 2013-02-11 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling 4H well.
2143511 Primary Facility 2013-02-22 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling 6H well.
2144635 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 3H spudded, TD not yet reached. 1H had been drilled. 2H, 4H, 5H, 6H also all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing. Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121601) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted.Department recommends that Operator remove debris from rock-lined ditches.
2151602 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor (24 inch pipe) was set at 60 feet and cemented with 9 yds. Water Protection Casing (16”) was set at 413 feet and was cemented with 450 sacks of Class A with 20 bbl. return. Mine Protection Casing (11 ¾”) was set at 650 feet with a basket at 555 feet. The mine casing was cemented with 325 sacks of Class A with 10 bbl. Return. Intermediate protection casing (8 5/8”) was set at 1906 feet and was cemented with 502 sacks of Class A with 15 bbl. Return. Chevron, David Freed and DEP performed a site walk through to inspect the site.
2169708 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2173637 Primary Facility 2013-06-10 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2228140 Primary Facility 2013-11-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was completing well 4H
2228230 Primary Facility 2013-10-31 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Well 3H was completed to 14,724 ft TD and casing 14,705 ft . Casing was cemented to surface with 1220 sks Solucam as lead and 720 sks Va Cam cement as tail.
2228631 Primary Facility 2013-10-09 Drilling/Alteration No Violations Noted Drilling 3H MD at 14859 ft, KOP at 7645 ft, 1255 sks of lead and 545 sks of tail.
2228685 Primary Facility 2013-10-09 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Well 3H was completed to 14,724 ft TD and casing 14,705 ft .
2229849 Primary Facility 2013-09-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was setting up to drill 4HA.
2235861 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244506 Primary Facility 2014-02-10 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron was setting up on the well pad to frack a number of wells. The frack tanks will block access to the the pipeline companies access to their pipeline controls. Chevron propsed adding an additional ramp tp allow the pipeline company access to their well controls. The access road will only be temporary.
2250977 Primary Facility 2014-03-05 Routine/Complete Inspection No Violations Noted
2252443 Primary Facility 2014-03-10 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2298106 Primary Facility 2014-08-20 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2311280 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408933 Primary Facility 2015-09-18 Routine/Complete Inspection No Violations Noted Unconventional multi-well pad.
2486260 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted no issues. system running
2532218 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted system running
2549709 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.

2594469 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2594583 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted no issues. system running
2626055 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues.
2656134 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running no,issues
2672032 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running. No,issues
2672069 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685384 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700766 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700820 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719554 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766914 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.

For data sources see[8]

References