X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-121-44864"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-121-44864
 
| Well ID: 37-121-44864
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.278494, -79.673178 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.278494, -79.673178 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: STEPHENS 37
 
| Farm/Lease Name: STEPHENS 37
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 03/03/2012
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 2/16/2012
+
| Permit Date: 2012-02-16
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.278494
 
| Latitude: 41.278494
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-02-16
 +
| New Permit Application
 +
|-
 +
| 2012-03-03
 +
| Performed Spud Operation
 +
|-
 +
| 2012-05-11
 +
| Drilling Completion
 +
|-
 +
| 2012-06-15
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 126:
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 277.58
 
| style="text-align: right;" | 277.58
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 318.22
 
| style="text-align: right;" | 318.22
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 193.58
 
| style="text-align: right;" | 193.58
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 133.28
 
| style="text-align: right;" | 133.28
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 36.43
 
| style="text-align: right;" | 36.43
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 25.76
 
| style="text-align: right;" | 25.76
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 74.69
 
| style="text-align: right;" | 74.69
 
| style="text-align: right;" | 183
 
| style="text-align: right;" | 183
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 133: Line 196:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 138: Line 202:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-A00
+
| 2012
| Produced Fluid (in Barrels)
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 95.00 Bbl
 
| style="text-align: right;" | 95.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2016-A00
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 8.33 Bbl
 
| style="text-align: right;" | 8.33 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-A00
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
| style="text-align: right;" | 9.17 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 15.88 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
| style="text-align: right;" | 22.22 Bbl
+
| Produced Fluid
| CENT WASTE TRT FAC NPDES DISCHARGE
+
| style="text-align: right;" | 11.11 Bbl
| 001-A
+
| ROAD SPREADING
 +
|  
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 72.38 Bbl
 
| style="text-align: right;" | 72.38 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 17.50 Bbl
 
| style="text-align: right;" | 17.50 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-A00
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[VISTA OPR INC]]
| style="text-align: right;" | 11.11 Bbl
+
| Produced Fluid
 +
| style="text-align: right;" | 22.22 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| 001-A
 +
|-
 +
| 2019
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 55.55 Bbl
 +
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2019
 +
| [[VISTA OPR INC]]
 +
| Brine Co-Product
 +
| style="text-align: right;" | 33.33 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING
 
|  
 
|  
Line 199: Line 284:
 
| 2048712
 
| 2048712
 
| Primary Facility
 
| Primary Facility
| 03/05/2012
+
| 2012-03-05
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 206: Line 291:
 
| 2049911
 
| 2049911
 
| Primary Facility
 
| Primary Facility
| 03/07/2012
+
| 2012-03-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 213: Line 298:
 
| 2053759
 
| 2053759
 
| Primary Facility
 
| Primary Facility
| 03/23/2012
+
| 2012-03-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 220: Line 305:
 
| 2057765
 
| 2057765
 
| Primary Facility
 
| Primary Facility
| 04/05/2012
+
| 2012-04-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 227: Line 312:
 
| 2065227
 
| 2065227
 
| Primary Facility
 
| Primary Facility
| 04/30/2012
+
| 2012-04-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 234: Line 319:
 
| 2076001
 
| 2076001
 
| Primary Facility
 
| Primary Facility
| 06/14/2012
+
| 2012-06-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 241: Line 326:
 
| 2095742
 
| 2095742
 
| Primary Facility
 
| Primary Facility
| 08/27/2012
+
| 2012-08-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 248: Line 333:
 
| 2138611
 
| 2138611
 
| Primary Facility
 
| Primary Facility
| 02/13/2013
+
| 2013-02-13
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 255: Line 340:
 
| 2170898
 
| 2170898
 
| Primary Facility
 
| Primary Facility
| 05/24/2013
+
| 2013-05-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 262: Line 347:
 
| 2247314
 
| 2247314
 
| Primary Facility
 
| Primary Facility
| 02/12/2014
+
| 2014-02-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 269: Line 354:
 
| 2248054
 
| 2248054
 
| Primary Facility
 
| Primary Facility
| 02/13/2014
+
| 2014-02-13
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 276: Line 361:
 
| 2248055
 
| 2248055
 
| Primary Facility
 
| Primary Facility
| 02/14/2014
+
| 2014-02-14
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 283: Line 368:
 
| 2259775
 
| 2259775
 
| Primary Facility
 
| Primary Facility
| 03/28/2014
+
| 2014-03-28
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 290: Line 375:
 
| 2271388
 
| 2271388
 
| Primary Facility
 
| Primary Facility
| 05/15/2014
+
| 2014-05-15
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 316: Line 401:
 
| 633671
 
| 633671
 
| 03/05/2012
 
| 03/05/2012
| 01/15/2013
+
| 2012-03-05
 
| 78.60B - Tophole water discharged improperly
 
| 78.60B - Tophole water discharged improperly
 
| Administrative
 
| Administrative
Line 324: Line 409:
 
| 689232
 
| 689232
 
| 02/12/2014
 
| 02/12/2014
|  
+
| 2014-02-12
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| SWMA301 - Failure to properly store, transport, process or dispose of a residual waste.
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 346: Line 431:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/15/2013
+
| 2013-01-15
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 354: Line 439:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 01/15/2013
+
| 2013-01-15
| 01/15/2013
+
| 2013-01-15
 
| style="text-align: right;" | $19,250.00
 
| style="text-align: right;" | $19,250.00
 
| style="text-align: right;" | $19,250.00
 
| style="text-align: right;" | $19,250.00
Line 375: Line 460:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Latest revision as of 11:00, 15 May 2020

Well Details

Well ID: 37-121-44864
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Richland Township
Operator Name: VISTA OPR INC
Well Pad ID:
Farm/Lease Name: STEPHENS 37
License Status:
Spud Date:
Permit Date: 2012-02-16
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.278494
Longitude: -79.673178

For data sources see[1][2][3]

Well History

Date Event
2012-02-16 New Permit Application
2012-03-03 Performed Spud Operation
2012-05-11 Drilling Completion
2012-06-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 VISTA OPR INC 0.00 0 277.58 365 0.00 0
2013 VISTA OPR INC 0.00 0 318.22 365 0.00 0
2014 VISTA OPR INC 0.00 0 193.58 365 0.00 0
2015 VISTA OPR INC 0.00 0 133.28 365 0.00 0
2016 VISTA OPR INC 0.00 0 36.43 365 0.00 0
2017 VISTA OPR INC 0.00 0 25.76 60 0.00 0
2018 VISTA OPR INC 0.00 0 74.69 183 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 VISTA OPR INC Produced Fluid 95.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2016 VISTA OPR INC Produced Fluid 8.33 Bbl ROAD SPREADING
2017 VISTA OPR INC Produced Fluid 15.88 Bbl ROAD SPREADING
2018 VISTA OPR INC Produced Fluid 11.11 Bbl ROAD SPREADING
2018 VISTA OPR INC Produced Fluid 72.38 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2018 VISTA OPR INC Produced Fluid 17.50 Bbl REUSE (AT WELL PAD)
2018 VISTA OPR INC Produced Fluid 22.22 Bbl CENT WASTE TRT FAC NPDES DISCHARGE 001-A
2019 VISTA OPR INC Produced Fluid 55.55 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2019 VISTA OPR INC Brine Co-Product 33.33 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2048712 Primary Facility 2012-03-05 Drilling/Alteration Violation(s) Noted
2049911 Primary Facility 2012-03-07 Routine/Complete Inspection No Violations Noted
2053759 Primary Facility 2012-03-23 Routine/Complete Inspection No Violations Noted
2057765 Primary Facility 2012-04-05 Routine/Complete Inspection No Violations Noted
2065227 Primary Facility 2012-04-30 Routine/Complete Inspection No Violations Noted
2076001 Primary Facility 2012-06-14 Routine/Complete Inspection No Violations Noted
2095742 Primary Facility 2012-08-27 Routine/Complete Inspection No Violations Noted
2138611 Primary Facility 2013-02-13 Administrative/File Review No Violations Noted
2170898 Primary Facility 2013-05-24 Routine/Complete Inspection No Violations Noted
2247314 Primary Facility 2014-02-12 Routine/Complete Inspection Violation(s) Noted
2248054 Primary Facility 2014-02-13 Follow-up Inspection Outstanding Violations - No Viols Req'd
2248055 Primary Facility 2014-02-14 Follow-up Inspection Outstanding Violations - No Viols Req'd
2259775 Primary Facility 2014-03-28 Follow-up Inspection Outstanding Violations - No Viols Req'd
2271388 Primary Facility 2014-05-15 Compliance Evaluation No Violations Noted
2686413 Primary Facility 2018-01-25 Routine/Partial Inspection No Violations Noted Inspection shows well equipped for production with rods tubing and pump jack with an electric motor. Label affixed to the wellhead with the annulus vented to the atmosphere.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2048712 633671 03/05/2012 2012-03-05 78.60B - Tophole water discharged improperly Administrative 78.57(a)
2247314 689232 02/12/2014 2014-02-12 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
633671 281412 NOV - Notice of Violation Comply/Closed 2013-01-15
633671 294095 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-01-15 2013-01-15 $19,250.00 $19,250.00
689232 309543 NOV - Notice of Violation

For data sources see[7]

References