X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-21929"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2010
 
| 2010
| style="text-align: right;" |
+
| [[CONSOL PA COAL CO LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 104: Line 104:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity

Revision as of 22:48, 19 August 2019

Well Details

Well ID: 37-125-21929
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: East Finley Township
Operator Name: CONSOL PA COAL CO LLC
Well Pad ID:
Farm/Lease Name: MICHAEL S & DARLA S MILLER 869
License Status: Plugged OG Well
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.003205
Longitude: -80.388027

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CONSOL PA COAL CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
781635 Primary Facility 1999-07-22 Plugging(Includes Plugged/Mined Through) No Violations Noted rigging up
781639 Primary Facility 1999-07-30 Plugging(Includes Plugged/Mined Through) No Violations Noted CLEANING OUT
835921 Primary Facility 1999-08-31 Bond Release No Violations Noted Plugged; site restored
908813 Primary Facility 2000-01-11 Plugging(Includes Plugged/Mined Through) No Violations Noted Good revegetation and return to contour on the access, graveled where needed. Subsurface plug monument. Some wet-weather slippage on high-wall side of bench location should await dryer conditions for repair. This is planned Spring of 2,000. No erosion problems.

For data sources see[5]

References