X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-22543"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-22543
 
| Well ID: 37-125-22543
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.031525, -79.9951 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.031525, -79.9951 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: R LITTLE 3
 
| Farm/Lease Name: R LITTLE 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 09/06/2007
+
| Spud Date:  
 
|-
 
|-
| Permit Date: 12/27/2006
+
| Permit Date: 2006-12-27
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.031525
 
| Latitude: 40.031525
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2006-12-27
 +
| New Permit Application
 +
|-
 +
| 2007-09-06
 +
| Performed Spud Operation
 +
|-
 +
| 2007-09-12
 +
| Drilling Completion
 +
|-
 +
| 2009-04-29
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 62: Line 125:
 
| 2007
 
| 2007
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 1,965.00
+
| style="text-align: right;" | 1965.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 26,365.00
+
| style="text-align: right;" | 26365.00
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[KRIEBEL MINERALS INC]]
 
| [[KRIEBEL MINERALS INC]]
| style="text-align: right;" | 11,692.00
+
| style="text-align: right;" | 11692.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 92: Line 155:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 101: Line 164:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 110: Line 173:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 119: Line 182:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 128: Line 191:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 137: Line 200:
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 332
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 146: Line 209:
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 155: Line 218:
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 329
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 164: Line 227:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 5,368.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 178: Line 250:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 183: Line 256:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2008-0
+
| 2008
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 190.00 Bbl
 
| style="text-align: right;" | 190.00 Bbl
Line 189: Line 263:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009
 +
| [[KRIEBEL MINERALS INC]]
 
| Brine
 
| Brine
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 195: Line 270:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-0
+
| 2010
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2011-0
+
| 2011
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2012-0
+
| 2012
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2014-0
+
| 2014
| Produced Fluid (in Barrels)
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 48.00 Bbl
 
| style="text-align: right;" | 48.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2016-0
+
| 2014
| Produced Fluid (in Barrels) RWC 802
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 48 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2016
 +
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2018-0
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[KRIEBEL MINERALS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 40 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095273
 +
|-
 +
| 2018
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 30.00 Bbl
 
| style="text-align: right;" | 30.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 270: Line 365:
 
!scope="col" | Penalty Amount
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
|-
 
|}-->
 
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 08:05, 15 May 2020

Well Details

Well ID: 37-125-22543
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Centerville Borough
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: R LITTLE 3
License Status: ACTIVE
Spud Date:
Permit Date: 2006-12-27
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.031525
Longitude: -79.9951

For data sources see[1][2][3]

Well History

Date Event
2006-12-27 New Permit Application
2007-09-06 Performed Spud Operation
2007-09-12 Drilling Completion
2009-04-29 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 KRIEBEL MINERALS INC 1965.00 365 0.00 0 0.00 0
2008 KRIEBEL MINERALS INC 26365.00 335 0.00 0 0.00 0
2009 KRIEBEL MINERALS INC 11692.00 334 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 15,734.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 9,858.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 7,363.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 8,102.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 7,548.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 7,708.00 332 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 2,873.00 329 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 2,954.00 329 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 7,501.00 334 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 5,368.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2008 KRIEBEL MINERALS INC Brine 190.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009 KRIEBEL MINERALS INC Brine 40.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2010 KRIEBEL MINERALS INC Produced Fluid 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2011 KRIEBEL MINERALS INC Produced Fluid 45.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012 KRIEBEL MINERALS INC Produced Fluid 30.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2014 KRIEBEL MINERALS INC Produced Fluid 48.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014 KRIEBEL MINERALS INC Produced Fluid 48 Bbl CENT WASTE TRT FAC NPDES PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2016 KRIEBEL MINERALS INC Produced Fluid 40 Bbl CENT WASTE TRT FAC NPDES PA0095273
2018 KRIEBEL WELLS DISSOLUTION CO LLC Produced Fluid 30.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

References