X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-23779"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-23779
 
| Well ID: 37-125-23779
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.034614, -80.051786 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.034614, -80.051786 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/05/2009
+
| Spud Date: 2009-08-05
 
|-
 
|-
| Permit Date: 6/23/2009
+
| Permit Date: 2009-06-23
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 165: Line 190:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-2
+
| 2010-A01
| Produced Fluid (in Barrels)
+
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 1,873.00 Bbl
+
| style="text-align: right;" | 2,416.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2010-A01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 600.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2010-A01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 615.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 +
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 4,025.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 101674
 +
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 2,065.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-2
+
| 2010-A01
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 44.00 Bbl
+
| style="text-align: right;" | 2,005.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-2
+
| 2010-A01
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 1,125.00 Bbl
+
| style="text-align: right;" | 855.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 570.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0095273
+
| PA0102784
 +
|-
 +
| 2010-A01
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 190.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 
|-
 
|-
| 2010-2
+
| 2010-A01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 54.00 Bbl
+
| style="text-align: right;" | 400.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| 301353
 
|-
 
|-
| 2010-2
+
| 2010-A01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 891.00 Bbl
+
| style="text-align: right;" | 1,680.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
| 34-167-29359
 
|-
 
| 2010-2
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 180.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 2,416.00 Bbl
+
| style="text-align: right;" | 1,208.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 600.00 Bbl
+
| style="text-align: right;" | 300.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 615.00 Bbl
+
| style="text-align: right;" | 307.50 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 4,025.00 Bbl
+
| style="text-align: right;" | 2,012.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 101674
 
| 101674
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 2,065.00 Bbl
+
| style="text-align: right;" | 1,032.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 2,005.00 Bbl
+
| style="text-align: right;" | 1,002.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 855.00 Bbl
+
| style="text-align: right;" | 427.50 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
| PA0101508
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 570.00 Bbl
+
| style="text-align: right;" | 285.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2010-3
+
| 2010-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 190.00 Bbl
+
| style="text-align: right;" | 95.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 +
|
 +
|-
 +
| 2010-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 200.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 301353
 +
|-
 +
| 2010-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 840.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
 
|-
 
|-
| 2010-3
+
| 2010-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 400.00 Bbl
+
| style="text-align: right;" | 1,873.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-3
+
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 44.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0091472
 +
|-
 +
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 1,125.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0095273
 +
|-
 +
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 54.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2010-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,680.00 Bbl
+
| style="text-align: right;" | 891.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 +
| 34-167-29359
 +
|-
 +
| 2010-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 180.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 575.00 Bbl
 
| style="text-align: right;" | 575.00 Bbl
Line 273: Line 364:
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 382.00 Bbl
 
| style="text-align: right;" | 382.00 Bbl
Line 279: Line 370:
 
|  
 
|  
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 724.00 Bbl
 
| style="text-align: right;" | 724.00 Bbl
Line 285: Line 376:
 
| 301353
 
| 301353
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 205.00 Bbl
 
| style="text-align: right;" | 205.00 Bbl
Line 291: Line 382:
 
| 34-007-24355
 
| 34-007-24355
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 297.00 Bbl
 
| style="text-align: right;" | 297.00 Bbl
Line 297: Line 388:
 
| 34-099-23127
 
| 34-099-23127
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 290.00 Bbl
 
| style="text-align: right;" | 290.00 Bbl
Line 303: Line 394:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2011-1
+
| 2011-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,147.00 Bbl
 
| style="text-align: right;" | 1,147.00 Bbl
Line 309: Line 400:
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 697.00 Bbl
 
| style="text-align: right;" | 697.00 Bbl
Line 315: Line 406:
 
|  
 
|  
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,032.00 Bbl
 
| style="text-align: right;" | 2,032.00 Bbl
Line 321: Line 412:
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,247.00 Bbl
 
| style="text-align: right;" | 1,247.00 Bbl
Line 327: Line 418:
 
|  
 
|  
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 847.00 Bbl
 
| style="text-align: right;" | 847.00 Bbl
Line 333: Line 424:
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 611.00 Bbl
 
| style="text-align: right;" | 611.00 Bbl
Line 339: Line 430:
 
|  
 
|  
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 90.00 Bbl
 
| style="text-align: right;" | 90.00 Bbl
Line 345: Line 436:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,093.00 Bbl
 
| style="text-align: right;" | 2,093.00 Bbl
Line 351: Line 442:
 
|  
 
|  
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 357: Line 448:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 363: Line 454:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,770.00 Bbl
 
| style="text-align: right;" | 1,770.00 Bbl
Line 369: Line 460:
 
|  
 
|  
 
|-
 
|-
| 2013-2
+
| 2013-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,670.00 Bbl
 
| style="text-align: right;" | 1,670.00 Bbl
Line 375: Line 466:
 
|  
 
|  
 
|-
 
|-
| 2014-1
+
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
Line 381: Line 472:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2014-1
+
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 765.00 Bbl
 
| style="text-align: right;" | 765.00 Bbl
Line 387: Line 478:
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
Line 393: Line 484:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,820.00 Bbl
 
| style="text-align: right;" | 1,820.00 Bbl
Line 399: Line 490:
 
|  
 
|  
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 575.00 Bbl
 
| style="text-align: right;" | 575.00 Bbl
Line 424: Line 515:
 
| 1817741
 
| 1817741
 
| Primary Facility
 
| Primary Facility
| 07/31/2009
+
| 2009-07-31
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 431: Line 522:
 
| 1819421
 
| 1819421
 
| Primary Facility
 
| Primary Facility
| 08/12/2009
+
| 2009-08-12
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 438: Line 529:
 
| 1835036
 
| 1835036
 
| Primary Facility
 
| Primary Facility
| 10/14/2009
+
| 2009-10-14
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 445: Line 536:
 
| 1836393
 
| 1836393
 
| Primary Facility
 
| Primary Facility
| 08/07/2009
+
| 2009-08-07
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 452: Line 543:
 
| 1836398
 
| 1836398
 
| Primary Facility
 
| Primary Facility
| 08/25/2009
+
| 2009-08-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 459: Line 550:
 
| 1849186
 
| 1849186
 
| Primary Facility
 
| Primary Facility
| 12/10/2009
+
| 2009-12-10
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 478: Line 569:
 
| 568393
 
| 568393
 
| 07/31/2009
 
| 07/31/2009
| 08/12/2009
+
| 2009-07-31
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 500: Line 591:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/12/2009
+
| 2009-08-12
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 508: Line 599:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 12/28/2009
+
| 2009-12-28
| 12/28/2009
+
| 2009-12-28
 
| style="text-align: right;" | $85,000.00
 
| style="text-align: right;" | $85,000.00
 
| style="text-align: right;" | $85,000.00
 
| style="text-align: right;" | $85,000.00
Line 520: Line 611:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 10:19, 3 August 2019

Well Details

Well ID: 37-125-23779
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Deemston Borough
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID: 146517
Farm/Lease Name: ECKERD 1
License Status: Active
Spud Date: 2009-08-05
Permit Date: 2009-06-23
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.034614
Longitude: -80.051786

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 ATLAS RESOURCES LLC 98,730.00 184 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 66,438.00 365 0.00 0 0.00 0
2012 ATLAS RESOURCES LLC 51,946.00 364 0.00 0 0.00 0
2013 ATLAS RESOURCES LLC 34,752.00 365 0.00 0 0.00 0
2014 ATLAS RESOURCES LLC 29,517.00 365 0.00 0 0.00 0
2015 ATLAS RESOURCES LLC 6,129.00 121 0.00 0 0.00 0
2016 ATLAS RESOURCES LLC 573.00 29 0.00 0 0.00 0
2017 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2019 DIVERSIFIED OIL & GAS LLC 85.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Drilling Fluid Waste (in Barrels) 2,416.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Drilling Fluid Waste (in Barrels) 600.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Drilling Fluid Waste (in Barrels) 615.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-A01 Fracing Fluid Waste (in Barrels) 4,025.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-A01 Fracing Fluid Waste (in Barrels) 2,065.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Fracing Fluid Waste (in Barrels) 2,005.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A01 Fracing Fluid Waste (in Barrels) 855.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-A01 Fracing Fluid Waste (in Barrels) 570.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010-A01 Fracing Fluid Waste (in Barrels) 190.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-A01 Produced Fluid (in Barrels) 400.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-A01 Produced Fluid (in Barrels) 1,680.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Drilling Fluid Waste (in Barrels) 1,208.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Drilling Fluid Waste (in Barrels) 300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Drilling Fluid Waste (in Barrels) 307.50 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Fracing Fluid Waste (in Barrels) 2,012.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-S01 Fracing Fluid Waste (in Barrels) 1,032.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Fracing Fluid Waste (in Barrels) 1,002.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S01 Fracing Fluid Waste (in Barrels) 427.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Fracing Fluid Waste (in Barrels) 285.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2010-S01 Fracing Fluid Waste (in Barrels) 95.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S01 Produced Fluid (in Barrels) 200.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S01 Produced Fluid (in Barrels) 840.00 Bbl IDENTIFY METHOD IN COMMENTS
2010-S02 Produced Fluid (in Barrels) 1,873.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S02 Produced Fluid (in Barrels) 44.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S02 Produced Fluid (in Barrels) 1,125.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S02 Produced Fluid (in Barrels) 54.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2010-S02 Produced Fluid (in Barrels) 891.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010-S02 Produced Fluid (in Barrels) 180.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Fracing Fluid Waste (in Barrels) 575.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S01 Produced Fluid (in Barrels) 382.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-S01 Produced Fluid (in Barrels) 724.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S01 Produced Fluid (in Barrels) 205.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-24355
2011-S01 Produced Fluid (in Barrels) 297.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127
2011-S01 Produced Fluid (in Barrels) 290.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-S01 Produced Fluid (in Barrels) 1,147.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011-S02 Fracing Fluid Waste (in Barrels) 697.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-S02 Produced Fluid (in Barrels) 2,032.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012-S01 Fracing Fluid Waste (in Barrels) 1,247.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 847.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012-S01 Produced Fluid (in Barrels) 611.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 90.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012-S02 Produced Fluid (in Barrels) 2,093.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013-S01 Produced Fluid (in Barrels) 100.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-S01 Produced Fluid (in Barrels) 1,770.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 1,670.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 320.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-S01 Produced Fluid (in Barrels) 765.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 65.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-S02 Produced Fluid (in Barrels) 1,820.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 575.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1817741 Primary Facility 2009-07-31 Routine/Complete Inspection Violation(s) Noted Marcellus well site - under site construction - No E & S controls implemented
1819421 Primary Facility 2009-08-12 Compliance Evaluation No Violations Noted CEI in response to 7/12/09 inspection & NOV - all violations abated.
1835036 Primary Facility 2009-10-14 Administrative/File Review No Violations Noted
1836393 Primary Facility 2009-08-07 Drilling/Alteration No Violations Noted RIG IS IDLE AT THIS MARCELLUS SITE.
1836398 Primary Facility 2009-08-25 Drilling/Alteration No Violations Noted NOMAC IS DRILLING THIS MARCELLUS WELL.
1849186 Primary Facility 2009-12-10 Administrative/File Review No Violations Noted review for cacp

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1817741 568393 07/31/2009 2009-07-31 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
568393 248659 NOV - Notice of Violation Comply/Closed 2009-08-12
568393 253839 CACP - Consent Assessment of Civil Penalty Comply/Closed 2009-12-28 2009-12-28 $85,000.00 $85,000.00

For data sources see[6]

References