X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24278"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24278
 
| Well ID: 37-125-24278
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.454944, -80.340611 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.454944, -80.340611 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Washington County, Pennsylvania|Washington]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Robinson Township, Washington County, Pennsylvania|Robinson Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[Robinson Township,_Washington_County,_Pennsylvania|Robinson Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[149201|149201]]
+
| Well Pad ID: [[149201]]
 
|-
 
|-
 
| Farm/Lease Name: ROBINHILL 18H
 
| Farm/Lease Name: ROBINHILL 18H
 
|-
 
|-
| First Permit Date: 2010-09-09
+
| License Status: Regulatory Inactive Status
|-
 
| Last Permit Date: 2010-09-09
 
|-
 
| Spud Date: 2010-09-16
 
 
|-
 
|-
| Unconventional: Yes
+
| Spud Date: 09/16/2010
 
|-
 
|-
| Horizontal: Yes
+
| Permit Date: 9/9/2010
 
|-
 
|-
| Well Status: ACTIVE
+
| Unconventional Well: Y
 
|-
 
|-
| Violations: 0
+
| Configuration: Horizontal Well
 
|-
 
|-
 
| Latitude: 40.454944
 
| Latitude: 40.454944
 
|-
 
|-
 
| Longitude: -80.340611
 
| Longitude: -80.340611
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
|-
+
!scope="col" | Water Production Days
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2010-2
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-1
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 164.16
 
| style="text-align:right;" | 8.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2011-2
 
| style="text-align:right;" | 251239.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 1193.31
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-1
 
| style="text-align:right;" | 54125.0
 
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 148.01
 
| style="text-align:right;" | 182.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2012-2
 
| style="text-align:right;" | 1648.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
 
|-
 
|-
| 2013-1
+
| 2010
| style="text-align:right;" | 148626.0
+
| [[ATLAS RESOURCES LLC]]
| style="text-align:right;" | 181.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 977.65
+
| style="text-align: right;" | 0
| style="text-align:right;" | 150.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
|-
+
| style="text-align: right;" | 0
|-
 
| 2013-2
 
| style="text-align:right;" | 273223.0
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 774.26
 
| style="text-align:right;" | 184.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2014-1
 
| style="text-align:right;" | 13297.0
 
| style="text-align:right;" | 16.0
 
| style="text-align:right;" | 54.04
 
| style="text-align:right;" | 16.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2011
 +
| [[ATLAS RESOURCES LLC]]
 +
| style="text-align: right;" | 251,239.00
 +
| style="text-align: right;" | 184
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,357.47
 +
| style="text-align: right;" | 192
 
|-
 
|-
| 2014-2
+
| 2012
| style="text-align:right;" | 14933.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 15.0
+
| style="text-align: right;" | 55,773.00
| style="text-align:right;" | 165.0
+
| style="text-align: right;" | 366
| style="text-align:right;" | 15.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 341.17
+
| style="text-align: right;" | 0
| style="text-align:right;" | 15.0
+
| style="text-align: right;" | 148.01
 +
| style="text-align: right;" | 182
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 421,849.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 1,751.91
 +
| style="text-align: right;" | 334
 
|-
 
|-
| 2015-02
+
| 2014
| style="text-align:right;" | 36633.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 28,230.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 31
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 341.17
| style="text-align:right;" | 161.52
+
| style="text-align: right;" | 15
| style="text-align:right;" | 28.0
+
| style="text-align: right;" | 219.04
 +
| style="text-align: right;" | 31
 
|-
 
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 357,880.00
 +
| style="text-align: right;" | 281
 +
| style="text-align: right;" | 923.93
 +
| style="text-align: right;" | 251
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
| 2016
| style="text-align:right;" | 33895.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 425.07
+
| style="text-align: right;" | 0
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
| 2019
| style="text-align:right;" | 42021.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 91.67
+
| style="text-align: right;" | 0
| style="text-align:right;" | 31.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2010-2
 
| 2010-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 4,260.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 725.0
+
| style="text-align: right;" | 725.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PAR000519462
+
| 301353
| ADVANCED WASTE SERVICES OF PA LLC
 
| NEW CASTLE
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 4,055.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| REUSE OTHER THAN ROAD SPREADING
+
| PA0091472
|
 
| REUSE FOR DRILLING OR PLUGGING
 
|  
 
|
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 175.0
+
| style="text-align: right;" | 175.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 1,081.00 Bbl
| Bbl
+
| REUSE OTHER THAN ROAD SPREADING
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
|  
| PA0091472
 
| TUNNELTON LIQUIDS TREATMENT FACILITY
 
| SALTSBURG
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 657.0
+
| style="text-align: right;" | 657.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
|  
 
|  
| HUNTER DISPOSAL
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2011-1
 
| 2011-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,376.00 Bbl
| Bbl
 
 
| IDENTIFY METHOD IN COMMENTS
 
| IDENTIFY METHOD IN COMMENTS
 
| 34-167-29359
 
| 34-167-29359
| WEST VIRGINIA OIL GATHERING
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 175.0
+
| style="text-align: right;" | 175.00 Bbl
| Bbl
 
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2011-2
 
| 2011-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 9.0
+
| style="text-align: right;" | 9,388.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-2-3995
 
| 34-121-2-3995
| HUNTERS  SWIW #5
 
| RENO
 
| OH
 
|-
 
 
|-
 
|-
 
| 2012-1
 
| 2012-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 3.0
+
| style="text-align: right;" | 3,440.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6) HUNTER DISPOSAL
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-1
 
| 2013-1
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,600.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 4.0
+
| style="text-align: right;" | 4,462.00 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 +
| 2014-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 220.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 
|-
 
|-
| 2014-1
+
| 2014-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 220.0
+
| style="text-align: right;" | 122.50 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 +
| 2015-1
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 840.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-121-23995
 
|-
 
|-
| 2014-2
+
| 2015-2
| PRODUCED FLUID
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 122.5
+
| style="text-align: right;" | 1,717.50 Bbl
| Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-121-23995
 
| 34-121-23995
| WARREN DRILLING CO #1 (SWIW #6)
 
| DEXTER CITY
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 1934233
 
| 1934233
| 2010-10-14
+
| Primary Facility
 +
| 10/14/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Whipstock 17 - TD@ 1679, drilling ahead, site and location good, returns on cement
 
| Whipstock 17 - TD@ 1679, drilling ahead, site and location good, returns on cement
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1934241
 
| 1934241
| 2010-12-06
+
| Primary Facility
 +
| 12/06/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Crown 8 - TD@6495, building curve, site and location good, pit good
 
| Crown 8 - TD@6495, building curve, site and location good, pit good
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1938167
 
| 1938167
| 2010-12-16
+
| Primary Facility
 +
| 12/16/2010
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Crown 8 - TD@11086 drilling completed and 5.5 production cemented back to surface, site and location good, pit good
 
| Crown 8 - TD@11086 drilling completed and 5.5 production cemented back to surface, site and location good, pit good
|
 
|
 
|
 
|-
 
|-
 
| 2133732
 
| 2010-01-10
 
| No Violations Noted
 
| On January 10, 2013 I stopped at the Robinhill #15 & #18 site to check the progress.  The site was at grade and crews were working on the production equipment.  The site is nearly done but needs temporarily stabilized.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2054786
 
| 2054786
| 2012-02-16
+
| Primary Facility
 +
| 02/16/2012
 +
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Investigated condensate spill.  Violations noted on 15H well.  Efacts# 2054746
 
| Investigated condensate spill.  Violations noted on 15H well.  Efacts# 2054746
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2054918
 
| 2054918
| 2012-02-21
+
| Primary Facility
 +
| 02/21/2012
 +
| Follow-up Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Sampled, results pending.
 
| Sampled, results pending.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2055017
 
| 2055017
| 2012-03-28
+
| Primary Facility
 +
| 03/28/2012
 +
| Follow-up Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| Remediation check, no new problems.
 
| Remediation check, no new problems.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2062133
 
| 2062133
| 2012-04-24
+
| Primary Facility
 +
| 04/24/2012
 +
| Administrative/File Review
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| On April 12, 2012, at about 16:20 Nick Staffieri contacted WQSS Vince Yantko about a minor spill that happened at about 15:20 that day.  This was followed up by a written incident report written by Nick on April 24, 2012.  The review of the incident was assigned to WQS, John Carson who requested and received a copy of the Bill of Landing from Brian Rankin (also of Chevron).
 
| On April 12, 2012, at about 16:20 Nick Staffieri contacted WQSS Vince Yantko about a minor spill that happened at about 15:20 that day.  This was followed up by a written incident report written by Nick on April 24, 2012.  The review of the incident was assigned to WQS, John Carson who requested and received a copy of the Bill of Landing from Brian Rankin (also of Chevron).
 
The spill response appears timely and complete (see attached report), and the associated paperwork is complete.  Chevron is in accordance with the Spill Policy in this case.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2065723
 
| 2065723
| 2012-04-11
+
| Primary Facility
 +
| 04/11/2012
 +
| Follow-up Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
| On April 11, 2012, Ed Bates (Soil Scientist 2 with ECUP), Bill Keefer  and I went to Chevronï¾’s Robin Hill site to check on the clean-up progress and so Ed could discuss clean-up standards with them.  We met primarily with Blake Loke and Matthew Barch.
+
| On April 11, 2012, Ed Bates (Soil Scientist 2 with ECUP), Bill Keefer  and I went to Chevron’s Robin Hill site to check on the clean-up progress and so Ed could discuss clean-up standards with them.  We met primarily with Blake Loke and Matthew Barch.
 
 
The capture pit is significantly bigger  and I did not smell any condensate or see a sheen on the water on the pipeline.
 
 
 
Ed talked with them about what standards they would be remediating the site to.
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2071631
 
| 2071631
| 2012-05-03
+
| Primary Facility
 +
| 05/03/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| On May 3, 2012, several representatives from DEP in both the Environmental Clean-Up Program and the Oil and Gas Program met with several representatives of Chevron and their subcontractors at the Robinhill site to get an update of the condensate spill remediation and to discuss where to go from there.
 
| On May 3, 2012, several representatives from DEP in both the Environmental Clean-Up Program and the Oil and Gas Program met with several representatives of Chevron and their subcontractors at the Robinhill site to get an update of the condensate spill remediation and to discuss where to go from there.
 
The excavations seem to keep growing and occasionally you could still see condensate on the water in the collection trenches and still smell the condensate in the air.  I took a short movie of the material floating in water in a collection trench.
 
 
We checked the pipeline below the excavations but did not find any condensate there.
 
 
We talked about Act 2 standards and to what standard the site would be restored to.  That is an issue best handled by DEPï¾’s Environmental Clean-up.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2071691
 
| 2071691
| 2012-05-29
+
| Primary Facility
 +
| 05/29/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Site is now an Act 2 site.  Still has some VOC hits but getting less.  Making plans to handle contaminated and uncontaminated soil.
 
| Site is now an Act 2 site.  Still has some VOC hits but getting less.  Making plans to handle contaminated and uncontaminated soil.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2082289
 
| 2082289
| 2012-07-06
+
| Primary Facility
 +
| 07/06/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| On July 6, 2012, I stopped at Robinhill #15 & #18 to check on their remediation progress.  About half of the total pad has been removed.  Chevron established a stockpile area about a quarter mile from the site (near the compressor station and crossroads) and the removed material is temporarily stored there.
 
| On July 6, 2012, I stopped at Robinhill #15 & #18 to check on their remediation progress.  About half of the total pad has been removed.  Chevron established a stockpile area about a quarter mile from the site (near the compressor station and crossroads) and the removed material is temporarily stored there.
 
I could smell a little condensate but it was much less.
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2083749
 
| 2083749
| 2012-07-12
+
| Primary Facility
 +
| 07/12/2012
 +
| Routine/Complete Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
 
| Check the E&S controls and found no problems.
 
| Check the E&S controls and found no problems.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2097624
 
| 2097624
| 2012-08-22
+
| Primary Facility
 +
| 08/22/2012
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
| On August 22, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
+
| On August 22, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
 
 
The E&S controls were in good shape.  Chevron constructed a sediment pond on the west side of the pad and placed large rock in the effluent end.  Some of the recent rains were very heavy and during these times the operators used a diesel pump to move water toward the north end of the pad where the water could dissipate through the soil.
 
 
 
Much of the excavated soil and fill is gone from the holding area.  A few large boulders remain.
 
 
 
I found no problems during my inspection.
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2127382
 +
| Primary Facility
 +
| 01/04/2013
 +
| Administrative/File Review
 +
| In Compliance with Policy
 +
| An Administrative Review of this incident revealed the following:
 
|-
 
|-
 
| 2130409
 
| 2130409
| 2012-12-12
+
| Primary Facility
 +
| 12/12/2012
 +
| Routine/Partial Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
| On September 12, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
+
| On September 12, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
 
 
The pile of stockpiled soil is gone.
 
 
 
The E&S controls look in decent shape and the permanent sediment traps and diversion ditches are largely in.
 
 
 
Workmen were re-plumbing the wells, getting ready for production.
 
 
 
|
 
|
 
|
 
|-
 
|-
 
| 2127382
 
| 2013-01-04
 
| In Compliance with Policy
 
| An Administrative Review of this incident revealed the following:
 
On December 10, 2012, the Department received a telephone report from Nick Staffieri about a small hydraulic spill at Chevronï¾’s Robinhill site.  On December 12, 2012, Nick sent an email with more details.
 
According to the report, on December 10, 2012, a subcontractor was unloading a roll-off container when a hydraulic line ruptured spilling about 15 gallons of hydraulic fluid onto the ground at Robinhill #15 & #18 well site.
 
Chevronï¾’s contractor, Weavertown, cleaned the area and put the contaminated soil in to drums.  These were transported to an approved transfer facility.  Weavertown also took confirmation samples on December 11, 2012.
 
Upon review of all the information in relation to this spill incident, the operator performed the proper spill reporting requirements and has reported sufficient remediation at the area of release in compliance with the Departments current Spill Policy.
 
 
 
|
 
|
 
|
 
 
|-
 
|-
 +
| 2133732
 +
| Primary Facility
 +
| 01/10/2010
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On January 10, 2013 I stopped at the Robinhill #15 & #18 site to check the progress.  The site was at grade and crews were working on the production equipment.  The site is nearly done but needs temporarily stabilized.
 
|-
 
|-
 
| 2133735
 
| 2133735
| 2013-01-17
+
| Primary Facility
 +
| 01/17/2013
 +
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| On January 17, 2013 I stopped at the Robinhill #15 & #18 site to check the progress.  The site was still not stabilized.
 
| On January 17, 2013 I stopped at the Robinhill #15 & #18 site to check the progress.  The site was still not stabilized.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2134433
 +
| Primary Facility
 +
| 01/24/2013
 +
| Follow-up Inspection
 +
| No Violations Noted
 +
| The appropriate E&S controls are in and the site is stabilized for the winter.
 
|-
 
|-
| 2134433
+
| 2212397
| 2013-01-24
+
| Primary Facility
 +
| 10/02/2013
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| The appropriate E&S controls are in and the site is stabilized for the winter. 
 
 
Chevron has successfully addressed the issues identified in the February 16, 2012 NOV and with regard to these issues the site is in compliance.
 
 
Please note, that this only covers issues documented by the February 16, 2012 NOV.  Any other issues will have to be dealt with separately.
 
 
 
|  
 
|  
 +
|-
 +
| 2353958
 +
| Primary Facility
 +
| 03/19/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 
|  
 
|  
 +
|-
 +
| 2405354
 +
| Primary Facility
 +
| 09/04/2015
 +
| Site Restoration
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2212397
+
|}-->
| 2013-10-02
+
For data sources see<ref>{{cite web
| No Violations Noted
+
| title =Oil and Gas Compliance Report
|  
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
|  
+
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 03/01/2011
 +
| 03/01/2011
 +
| style="text-align: right;" | 8347.0
 +
| style="text-align: right;" | 5975229.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="8"| 1
 +
| rowspan="4"|  
 +
| rowspan="4"|
 +
| rowspan="4"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.006
 +
| style="text-align: right;" |
 +
|-
 +
| Carboxymethylhydroxyporoyl guar bln
 +
| Mixture
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 0.015
 +
| style="text-align: right;" |
 +
|-
 +
| Hydrocholoric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 32.0
 +
| style="text-align: right;" | 1.964
 +
| style="text-align: right;" |
 +
|-
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.007
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Sand
 +
| rowspan="1"|
 +
| rowspan="1"| Proppant
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 10.51
 +
| style="text-align: right;" |
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"|
 +
| rowspan="1"|
 +
| rowspan="1"| Used to open perfs
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30.0
 +
| style="text-align: right;" | 0.035
 +
| style="text-align: right;" |
 
|-
 
|-
| 2353958
+
|- valign="top"
| 2015-03-19
+
| rowspan="0"|
| No Violations Noted
+
| rowspan="0"|
 +
| rowspan="0"| Iron Control Agent
 +
|- valign="top"
 +
| rowspan="1"| Water
 +
| rowspan="1"|
 +
| rowspan="1"| Carrier/Base Fluid
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | 100.0
 +
| style="text-align: right;" | 89.48
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Water Viscosifier
 +
|- valign="top"
 +
| rowspan="0"|
 +
| rowspan="0"|
 +
| rowspan="0"| Friction Reducer
 +
|- valign="top"
 +
| rowspan="1"| The chemical additive information reported herein is identical to the information reported by Chevron to the Pennsylvania Department of Environmental Protection.
 +
| rowspan="1"|
 +
| rowspan="1"|
 
|  
 
|  
 
|  
 
|  
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" | None
 +
| style="text-align: right;" |
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
==References==
== References ==
+
<references/>
{{reflist}}
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Revision as of 11:57, 15 July 2019

Well Details

Well ID: 37-125-24278
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Robinson Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149201
Farm/Lease Name: ROBINHILL 18H
License Status: Regulatory Inactive Status
Spud Date: 09/16/2010
Permit Date: 9/9/2010
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.454944
Longitude: -80.340611

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 ATLAS RESOURCES LLC 0.00 0 0.00 0 0.00 0
2011 ATLAS RESOURCES LLC 251,239.00 184 0.00 0 1,357.47 192
2012 CHEVRON APPALACHIA LLC 55,773.00 366 0.00 0 148.01 182
2013 CHEVRON APPALACHIA LLC 421,849.00 365 0.00 0 1,751.91 334
2014 CHEVRON APPALACHIA LLC 28,230.00 31 341.17 15 219.04 31
2015 CHEVRON APPALACHIA LLC 357,880.00 281 923.93 251 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-2 Drilling Fluid Waste (in Barrels) 4,260.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Fracing Fluid Waste (in Barrels) 725.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-1 Fracing Fluid Waste (in Barrels) 4,055.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011-1 Fracing Fluid Waste (in Barrels) 175.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-1 Fracing Fluid Waste (in Barrels) 1,081.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011-1 Produced Fluid (in Barrels) 657.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-1 Produced Fluid (in Barrels) 1,376.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2011-2 Fracing Fluid Waste (in Barrels) 175.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-2 Produced Fluid (in Barrels) 9,388.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2012-1 Produced Fluid (in Barrels) 3,440.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-1 Produced Fluid (in Barrels) 1,600.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-2 Produced Fluid (in Barrels) 4,462.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-1 Produced Fluid (in Barrels) 220.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2014-2 Produced Fluid (in Barrels) 122.50 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015-1 Produced Fluid (in Barrels) 840.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2015-2 Produced Fluid (in Barrels) 1,717.50 Bbl INJECTION DISPOSAL WELL 34-121-23995

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1934233 Primary Facility 10/14/2010 Drilling/Alteration No Violations Noted Whipstock 17 - TD@ 1679, drilling ahead, site and location good, returns on cement
1934241 Primary Facility 12/06/2010 Drilling/Alteration No Violations Noted Crown 8 - TD@6495, building curve, site and location good, pit good
1938167 Primary Facility 12/16/2010 Drilling/Alteration No Violations Noted Crown 8 - TD@11086 drilling completed and 5.5 production cemented back to surface, site and location good, pit good
2054786 Primary Facility 02/16/2012 Incident- Response to Accident or Event In Compliance with Policy Investigated condensate spill. Violations noted on 15H well. Efacts# 2054746
2054918 Primary Facility 02/21/2012 Follow-up Inspection In Compliance with Policy Sampled, results pending.
2055017 Primary Facility 03/28/2012 Follow-up Inspection In Compliance with Policy Remediation check, no new problems.
2062133 Primary Facility 04/24/2012 Administrative/File Review In Compliance with Policy On April 12, 2012, at about 16:20 Nick Staffieri contacted WQSS Vince Yantko about a minor spill that happened at about 15:20 that day. This was followed up by a written incident report written by Nick on April 24, 2012. The review of the incident was assigned to WQS, John Carson who requested and received a copy of the Bill of Landing from Brian Rankin (also of Chevron).
2065723 Primary Facility 04/11/2012 Follow-up Inspection In Compliance with Policy On April 11, 2012, Ed Bates (Soil Scientist 2 with ECUP), Bill Keefer and I went to Chevron’s Robin Hill site to check on the clean-up progress and so Ed could discuss clean-up standards with them. We met primarily with Blake Loke and Matthew Barch.
2071631 Primary Facility 05/03/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd On May 3, 2012, several representatives from DEP in both the Environmental Clean-Up Program and the Oil and Gas Program met with several representatives of Chevron and their subcontractors at the Robinhill site to get an update of the condensate spill remediation and to discuss where to go from there.
2071691 Primary Facility 05/29/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd Site is now an Act 2 site. Still has some VOC hits but getting less. Making plans to handle contaminated and uncontaminated soil.
2082289 Primary Facility 07/06/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd On July 6, 2012, I stopped at Robinhill #15 & #18 to check on their remediation progress. About half of the total pad has been removed. Chevron established a stockpile area about a quarter mile from the site (near the compressor station and crossroads) and the removed material is temporarily stored there.
2083749 Primary Facility 07/12/2012 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Check the E&S controls and found no problems.
2097624 Primary Facility 08/22/2012 Follow-up Inspection Outstanding Violations - No Viols Req'd On August 22, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
2127382 Primary Facility 01/04/2013 Administrative/File Review In Compliance with Policy An Administrative Review of this incident revealed the following:
2130409 Primary Facility 12/12/2012 Routine/Partial Inspection Outstanding Violations - No Viols Req'd On September 12, 2012, I stopped at Robinhill #15 & #18 to check on the clean-up.
2133732 Primary Facility 01/10/2010 Routine/Complete Inspection No Violations Noted On January 10, 2013 I stopped at the Robinhill #15 & #18 site to check the progress. The site was at grade and crews were working on the production equipment. The site is nearly done but needs temporarily stabilized.
2133735 Primary Facility 01/17/2013 Follow-up Inspection No Violations Noted On January 17, 2013 I stopped at the Robinhill #15 & #18 site to check the progress. The site was still not stabilized.
2134433 Primary Facility 01/24/2013 Follow-up Inspection No Violations Noted The appropriate E&S controls are in and the site is stabilized for the winter.
2212397 Primary Facility 10/02/2013 Routine/Complete Inspection No Violations Noted
2353958 Primary Facility 03/19/2015 Routine/Complete Inspection No Violations Noted
2405354 Primary Facility 09/04/2015 Site Restoration No Violations Noted

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/01/2011 03/01/2011 8347.0 5975229.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor Ethylene Glycol 107-21-1 30.0 0.006
Carboxymethylhydroxyporoyl guar bln Mixture 100.0 0.015
Hydrocholoric Acid 7647-01-0 32.0 1.964
Ethylene Glycol 107-21-1 30.0 0.007
Sand Proppant 100.0 10.51
Used to open perfs Hydrotreated Light Distillite 64742-47-8 30.0 0.035
Iron Control Agent
Water Carrier/Base Fluid 100.0 89.48
Water Viscosifier
Friction Reducer
The chemical additive information reported herein is identical to the information reported by Chevron to the Pennsylvania Department of Environmental Protection. None None

For data sources see[7]

References