If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-27501 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.235106,"lon":-79.744313,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Sewickley Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 146505 | |
Farm/Lease Name: SHOAF 7 | |
License Status: Plugged OG Well | |
Spud Date: 07/24/2008 | |
Permit Date: 6/13/2008 | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Latitude: 40.235106 | |
Longitude: -79.744313 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2008 | ATLAS RESOURCES LLC | 26,194.00 | 366 | 0.00 | 0.00 | ||
2009 | ATLAS RESOURCES LLC | 49,384.00 | 365 | 0.00 | 0.00 | ||
2010 | ATLAS RESOURCES LLC | 34,517.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2011 | ATLAS RESOURCES LLC | 17,616.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 7,066.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2008-A00 | Brine | 3,215.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2008-A00 | Brine | 270.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2008-A00 | Brine | 765.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2008-A00 | Brine | 80.00 Bbl | Municipal Sewage Treatment Plant | |
2008-A00 | Brine | 14,585.00 Bbl | Municipal Sewage Treatment Plant | PA0026891 |
2008-A00 | Fracking Fluid | 1,270.00 Bbl | Reuse other than road spreading | |
2009-A00 | Brine | 2,236.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095273 |
2009-A00 | Brine | 575.00 Bbl | Municipal Sewage Treatment Plant | |
2009-A00 | Brine | 295.00 Bbl | Other | |
2009-A00 | Brine | 140.00 Bbl | Reuse other than road spreading | |
2010-A01 | Produced Fluid (in Barrels) | 210.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-A01 | Produced Fluid (in Barrels) | 2,244.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010-S01 | Produced Fluid (in Barrels) | 105.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S01 | Produced Fluid (in Barrels) | 1,122.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010-S02 | Produced Fluid (in Barrels) | 1,355.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010-S02 | Produced Fluid (in Barrels) | 275.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-S02 | Produced Fluid (in Barrels) | 82.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Fracing Fluid Waste (in Barrels) | 384.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
2011-S01 | Produced Fluid (in Barrels) | 90.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 |
2011-S02 | Produced Fluid (in Barrels) | 250.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2012-S01 | Produced Fluid (in Barrels) | 65.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012-S01 | Produced Fluid (in Barrels) | 320.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2012-S01 | Produced Fluid (in Barrels) | 767.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 146.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 40.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 325.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 129.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 120.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 26.09 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 37,590.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 4,249.00 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 6.14 Bbl | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2017-M06 | Synthetic Liner Materials (in Tons) RWC 806 | 3.63 Tons | LANDFILL | 100663 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1723189 | Primary Facility | 07/25/2008 | Drilling/Alteration | No Violations Noted | Well spudded 7/24/08. Rig drilling @ 37' @ time of inspection. Pit/freeboard/E&S controls OK. |
1723689 | Primary Facility | 07/28/2008 | Drilling/Alteration | No Violations Noted | Spudded 7/24/08. Rig drilling @ 1472' @ time of inspection. Pit/freeboard/E&S controls OK. |
1725912 | Primary Facility | 08/06/2008 | Drilling/Alteration | No Violations Noted | Spudded 7/24/08. Hole TD'd @ 8338' @ time of inspection. Pit/freeboard/E&S controls OK. |
2205437 | Primary Facility | 09/18/2013 | Routine/Complete Inspection | No Violations Noted | Marcellus |
2284535 | Primary Facility | 07/07/2014 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. Well site appears to be restored. |
2433439 | Primary Facility | 12/15/2015 | Routine/Complete Inspection | No Violations Noted | Tag, tanks, e&s ok. |
2588167 | Primary Facility | 2017-04-21 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | 4/21/2017 - Rigging up over well to start plugging. |
2613415 | Primary Facility | 2017-07-10 | Routine/Complete Inspection | No Violations Noted | Well appeared to be plugged. No monument observed. Well apparatus and brine tank removed. The site has been regraded, seeded and temporary stabilized. The site does not meet the 70 % uniform vegetative coverage criteria. The Department recommends the Operator continue to monitor the site until the vegetative restoration criteria is achieved. |
For data sources see[6]