If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 149: | Line 149: | ||
|- | |- | ||
| 2017 | | 2017 | ||
− | | [[ALLIANCE | + | | [[ALLIANCE PETRO CO LLC]] |
| style="text-align: right;" | 3,001.00 | | style="text-align: right;" | 3,001.00 | ||
| style="text-align: right;" | 334 | | style="text-align: right;" | 334 | ||
Line 158: | Line 158: | ||
|- | |- | ||
| 2018 | | 2018 | ||
− | | [[ALLIANCE | + | | [[ALLIANCE PETRO CO LLC]] |
| style="text-align: right;" | 4,100.00 | | style="text-align: right;" | 4,100.00 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
Line 176: | Line 176: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 181: | Line 182: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0020346 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 21.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0095443 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1.00 Bbl |
− | | | + | | PUBLIC SEWAGE TREATMENT PLANT |
− | | | + | | PA0026034 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 28.00 Bbl | | style="text-align: right;" | 28.00 Bbl | ||
Line 205: | Line 210: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 175.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 301353 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 24.00 Bbl |
| PUBLIC SEWAGE TREATMENT PLANT | | PUBLIC SEWAGE TREATMENT PLANT | ||
− | | | + | | PA0026310 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 7.00 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | | + | | PA0091472 |
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[PHILLIPS EXPLORATION INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 40.00 Bbl | | style="text-align: right;" | 40.00 Bbl | ||
Line 229: | Line 238: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 59.00 Bbl | | style="text-align: right;" | 59.00 Bbl | ||
Line 235: | Line 245: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 38.00 Bbl | | style="text-align: right;" | 38.00 Bbl | ||
Line 241: | Line 252: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2013 | + | | 2013 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 23.00 Bbl | | style="text-align: right;" | 23.00 Bbl | ||
Line 247: | Line 259: | ||
| PA0020346 | | PA0020346 | ||
|- | |- | ||
− | | 2014 | + | | 2014 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 21.00 Bbl | | style="text-align: right;" | 21.00 Bbl | ||
Line 253: | Line 266: | ||
| PA0020346 | | PA0020346 | ||
|- | |- | ||
− | | 2016 | + | | 2016 |
+ | | [[XTO ENERGY INC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 46.48 Bbl | | style="text-align: right;" | 46.48 Bbl | ||
Line 259: | Line 273: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[ALLIANCE PETRO CO LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 30.00 Bbl | | style="text-align: right;" | 30.00 Bbl |
Well ID: 37-129-27829 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.414245,"lon":-79.455928,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Salem Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: LESLIE S KELLY 5 | |
License Status: Active | |
Spud Date: 2009-07-28 | |
Permit Date: 2009-02-20 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.414245 | |
Longitude: -79.455928 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | 15,129.00 | 291 | 0.00 | 0 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 8,377.00 | 331 | 0.00 | 0 | 0.00 | 0 |
2012 | XTO ENERGY INC | 6,906.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | XTO ENERGY INC | 6,067.00 | 365 | 29.37 | 365 | 0.00 | 0 |
2014 | XTO ENERGY INC | 4,908.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | XTO ENERGY INC | 3,640.30 | 348 | 18.39 | 348 | 0.00 | 0 |
2016 | XTO ENERGY INC | 3,722.00 | 318 | 3.40 | 318 | 0.00 | 0 |
2017 | ALLIANCE PETRO CO LLC | 3,001.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2018 | ALLIANCE PETRO CO LLC | 4,100.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 1.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 21.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 1.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026034 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 28.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 175.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 24.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0026310 |
2010 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 7.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | PHILLIPS EXPLORATION INC | Produced Fluid (in Barrels) | 40.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012 | XTO ENERGY INC | Produced Fluid (in Barrels) | 59.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid (in Barrels) | 38.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2013 | XTO ENERGY INC | Produced Fluid (in Barrels) | 23.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2014 | XTO ENERGY INC | Produced Fluid (in Barrels) | 21.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 |
2016 | XTO ENERGY INC | Produced Fluid (in Barrels) RWC 802 | 46.48 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
2018 | ALLIANCE PETRO CO LLC | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095273 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1819349 | Primary Facility | 2009-07-29 | Drilling/Alteration | No Violations Noted | rig on-site - not set up/E&S ok/ID ok |
1835433 | Primary Facility | 2009-10-05 | Routine/Complete Inspection | No Violations Noted | Well has been drilled, but it is not equipped for production. Erosion and sedimentation controls are in place. There is no evidence of accelerated erosion or sedimentation on the access road or well site. The pits are still open. The E&S plan and Site ID sign are present. The operator should continue to monitor the site for erosion and sedimentation. |
2509255 | Primary Facility | 2016-08-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site and appear to be structurally sound. No E&S issues in relation to site and/or access road. |
For data sources see[6]