{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-28657 | | Well ID: 37-129-28657 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="14" | {{#display_map: 40.194875, -79.743092 | width=100% | height=100% }} |
|- | |- | ||
− | | | + | | Country: United States |
|- | |- | ||
− | | Municipality: [[South Huntingdon Township, | + | | State: Pennsylvania |
+ | |- | ||
+ | | County: [[Westmoreland_County,_Pennsylvania|Westmoreland]] | ||
+ | |- | ||
+ | | Municipality: [[South Huntingdon Township,_Westmoreland_County,_Pennsylvania|South Huntingdon Township]] | ||
|- | |- | ||
| Operator Name: [[CHEVRON APPALACHIA LLC]] | | Operator Name: [[CHEVRON APPALACHIA LLC]] | ||
|- | |- | ||
− | | Well Pad ID: [[ | + | | Well Pad ID: [[149319]] |
|- | |- | ||
| Farm/Lease Name: SLEITH UNIT 7H-A | | Farm/Lease Name: SLEITH UNIT 7H-A | ||
|- | |- | ||
− | | | + | | License Status: Active |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | Spud Date: 02/12/2012 |
|- | |- | ||
− | | | + | | Permit Date: 8/19/2011 |
|- | |- | ||
− | | Well | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
| Latitude: 40.194875 | | Latitude: 40.194875 | ||
|- | |- | ||
− | | Longitude: -79. | + | | Longitude: -79.743092 |
− | |||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Permits Issued Detail Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
+ | !scope="col" | Water Production Days | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | style="text-align:right;" | 0. | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2012 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2013 |
− | | style="text-align:right;" | 0. | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 885,781.00 | ||
+ | | style="text-align: right;" | 208 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2015 |
− | | style="text-align:right;" | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 935,303.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2016 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 654,379.00 | ||
+ | | style="text-align: right;" | 366 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2017 |
− | | style="text-align:right;" | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 504,941.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2018 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 429,462.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | style="text-align:right;" | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 91,572.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 90 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | | + | | 2012-S01 |
− | | style="text-align:right;" | | + | | Drilling Fluid Waste (in Barrels) |
− | | | + | | style="text-align: right;" | 10,037.50 Bbl |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | | + | | WMGR123SW001 |
− | | style="text-align:right;" | | + | |- |
− | | | + | | 2012-S01 |
+ | | Drilling Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 85.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
+ | | 2012-S02 | ||
+ | | Drill Cuttings (in Tons) | ||
+ | | style="text-align: right;" | 778.41 Tons | ||
+ | | LANDFILL | ||
+ | | 100419 | ||
|- | |- | ||
− | | | + | | 2012-S02 |
− | | | + | | Drilling Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 835.50 Bbl | |
− | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | |
− | | style="text-align:right;" | | + | | WMGR123SW001 |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2012-S02 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 260.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2013-S02 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 40.00 Bbl | |
− | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | |
− | | style="text-align:right;" | | + | | WMGR123SW001 |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2014-S01 | ||
+ | | Fracing Fluid Waste (in Barrels) | ||
+ | | style="text-align: right;" | 2,470.25 Bbl | ||
+ | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2014-S01 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 5,850.50 Bbl | |
− | + | | REUSE OTHER THAN ROAD SPREADING | |
− | | style="text-align:right;" | | + | | |
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2014-S01 | ||
+ | | Fracturing Fluid Waste (in Tons) | ||
+ | | style="text-align: right;" | 30.54 Tons | ||
+ | | STORAGE PENDING DISPOSAL OR REUSE | ||
+ | | MID074259565 | ||
|- | |- | ||
− | | | + | | 2014-S02 |
− | | | + | | Fracing Fluid Waste (in Barrels) |
− | + | | style="text-align: right;" | 4,732.75 Bbl | |
− | + | | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | |
− | | style="text-align:right;" | | + | | WMGR123SW001 |
− | | | ||
− | | | ||
|- | |- | ||
− | | | + | | 2014-S02 |
− | + | | Fracing Fluid Waste (in Barrels) | |
− | + | | style="text-align: right;" | 946.25 Bbl | |
− | + | | REUSE OTHER THAN ROAD SPREADING | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2014-S02 |
− | | | + | | Produced Fluid (in Barrels) |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 3,076.75 Bbl |
− | |||
| REUSE OTHER THAN ROAD SPREADING | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
− | | REUSE | + | |- |
+ | | 2015-S01 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 1,198.00 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
+ | |- | ||
+ | | 2015-S02 | ||
+ | | Produced Fluid (in Barrels) | ||
+ | | style="text-align: right;" | 796.25 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
| | | | ||
|- | |- | ||
+ | | 2016-S01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 699.25 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2016-S02 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 503.77 Bbl |
− | |||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2016-S02 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 83.50 Bbl | ||
+ | | REUSE OTHER THAN ROAD SPREADING | ||
+ | | | ||
+ | |- | ||
+ | | 2017-M01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 111.25 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017-M02 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 56.25 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 59.62 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 56.25 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2017-M04 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW001 | | WMGR123SW001 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2017-M04 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2017-M05 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 4,620.00 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
− | | | + | | WMGR123SW001 |
− | | | + | |- |
− | | | + | | 2017-M06 |
− | | | + | | Drilling Fluid Waste (in Barrels) RWC 803 |
− | | | + | | style="text-align: right;" | 24.00 Bbl |
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
+ | |- | ||
+ | | 2017-M06 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW019 | ||
|- | |- | ||
+ | | 2017-M07 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | | + | | 2017-M08 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 32.50 Bbl |
− | + | | RESIDUAL WASTE PROCESSING FACILITY | |
− | | | ||
| WMGR123SW001 | | WMGR123SW001 | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2017-M08 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2017-M08 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 30.00 Bbl |
− | + | | REUSE (AT WELL PAD) | |
− | | REUSE | ||
| | | | ||
− | | REUSE | + | |- |
+ | | 2017-M09 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 28.75 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2017-M10 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 30.75 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
+ | |- | ||
+ | | 2017-M10 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
+ | | 2017-M11 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 55.50 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2017-M12 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 27.50 Bbl |
− | + | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
− | | | + | | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2018-M01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 138.50 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018-M02 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 57.50 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
− | + | | | |
− | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2018-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 30.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | | + | | 2018-M03 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 25.00 Bbl |
− | + | | REUSE (AT WELL PAD) | |
− | | REUSE | ||
| | | | ||
− | | REUSE | + | |- |
+ | | 2018-M04 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
+ | |- | ||
+ | | 2018-M04 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 25.00 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
+ | | 2018-M05 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 55.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018-M06 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 27.50 Bbl |
− | + | | REUSE (AT WELL PAD) | |
− | | | + | | |
− | | | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2018-M06 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018-M07 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 28.75 Bbl |
− | + | | REUSE (AT WELL PAD) | |
− | | REUSE | ||
| | | | ||
− | | REUSE | + | |- |
+ | | 2018-M08 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 82.50 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
+ | |- | ||
+ | | 2018-M09 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
| | | | ||
|- | |- | ||
+ | | 2018-M11 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 56.00 Bbl | ||
+ | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2018-M12 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 28.50 Bbl |
− | + | | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
− | | | + | | |
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2019-M01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 27.50 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2019-M02 |
− | | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 27.50 Bbl |
− | + | | REUSE (AT WELL PAD) | |
− | | REUSE | ||
− | |||
− | |||
| | | | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 85.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Waste Reports |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-03-31 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
== Inspection Data == | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Inspection ID |
− | !scope="col" | | + | !scope="col" | Inspection Category |
− | !scope="col" | | + | !scope="col" | Inspection Date |
− | !scope="col" | | + | !scope="col" | Inspection Type |
− | !scope="col" | | + | !scope="col" | Inspection Result |
− | + | !scope="col" | Inspection Comments | |
− | !scope="col" | | ||
|- | |- | ||
| 2010400 | | 2010400 | ||
− | | | + | | Primary Facility |
+ | | 10/04/2011 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| SPUDDED | | SPUDDED | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2013223 | | 2013223 | ||
− | | | + | | Primary Facility |
+ | | 10/21/2011 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Routine inspection of site due to spud notification. | | Routine inspection of site due to spud notification. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2021164 | | 2021164 | ||
− | | | + | | Primary Facility |
+ | | 11/17/2011 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| SPUDDED, MOVING YOST RIG 6 ON PAD. | | SPUDDED, MOVING YOST RIG 6 ON PAD. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2026079 | | 2026079 | ||
− | | | + | | Primary Facility |
+ | | 12/12/2011 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Site visit was part of routine inspection. | | Site visit was part of routine inspection. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2026773 | | 2026773 | ||
− | | | + | | Primary Facility |
+ | | 11/29/2011 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| SPUDDED, MOVING YOST RIG 6 ON PAD. | | SPUDDED, MOVING YOST RIG 6 ON PAD. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2030659 | | 2030659 | ||
− | | | + | | Primary Facility |
+ | | 12/21/2011 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2037558 | | 2037558 | ||
− | | | + | | Primary Facility |
+ | | 01/27/2012 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2046930 | | 2046930 | ||
− | | | + | | Primary Facility |
+ | | 02/29/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| | | | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2048776 | | 2048776 | ||
− | | | + | | Primary Facility |
+ | | 02/27/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2048785 | | 2048785 | ||
− | | | + | | Primary Facility |
+ | | 03/01/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2052486 | | 2052486 | ||
− | | 2012- | + | | Primary Facility |
+ | | 03/21/2012 | ||
+ | | Incident- Response to Accident or Event | ||
| No Violations Noted | | No Violations Noted | ||
| This was a follow up investigation to a drilling mud spill. | | This was a follow up investigation to a drilling mud spill. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2052663 | | 2052663 | ||
− | | | + | | Primary Facility |
+ | | 03/13/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2059691 | | 2059691 | ||
− | | 2012- | + | | Primary Facility |
+ | | 04/16/2012 | ||
+ | | Incident- Response to Accident or Event | ||
| In Compliance with Policy | | In Compliance with Policy | ||
| This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted. | | This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2061683 | | 2061683 | ||
− | | | + | | Primary Facility |
+ | | 04/09/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2068979 | | 2068979 | ||
− | | | + | | Primary Facility |
+ | | 05/15/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| HORIZONTAL MARCELLUS | | HORIZONTAL MARCELLUS | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2087937 | | 2087937 | ||
− | | | + | | Primary Facility |
+ | | 07/18/2012 | ||
+ | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| 7/18/2012 Back filling drill pit, and not fraced yet. | | 7/18/2012 Back filling drill pit, and not fraced yet. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2093980 | | 2093980 | ||
− | | | + | | Primary Facility |
+ | | 08/23/2012 | ||
+ | | Complaint Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| 4 wells drilled. No frac yet. 2 lined impoundments. | | 4 wells drilled. No frac yet. 2 lined impoundments. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2166032 | | 2166032 | ||
− | | | + | | Primary Facility |
+ | | 05/13/2013 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | | At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2199774 | | 2199774 | ||
− | | | + | | Primary Facility |
+ | | 08/16/2013 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | | At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2216353 | | 2216353 | ||
− | | | + | | Primary Facility |
+ | | 10/24/2013 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | | At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2228527 | | 2228527 | ||
− | | | + | | Primary Facility |
+ | | 11/11/2013 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | | At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2258933 | ||
+ | | Primary Facility | ||
+ | | 03/18/2014 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 3/18/2014 Produced fluids tanks diked and GPU's | ||
|- | |- | ||
| 2310350 | | 2310350 | ||
− | | | + | | Primary Facility |
+ | | 10/06/2014 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| 10/6/2014 Produced fluids tanks diked and GPU's | | 10/6/2014 Produced fluids tanks diked and GPU's | ||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
| 2369028 | | 2369028 | ||
− | | | + | | Primary Facility |
+ | | 05/05/2015 | ||
+ | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| 5/5/2015 Produced fluids tanks diked and GPU's | | 5/5/2015 Produced fluids tanks diked and GPU's | ||
− | | | + | |- |
− | | | + | | 2393447 |
− | | | + | | Primary Facility |
+ | | 07/02/2015 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 7/2/2015 Produced fluids tanks diked and GPU's | ||
+ | |- | ||
+ | | 2396625 | ||
+ | | Primary Facility | ||
+ | | 08/06/2015 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan. | ||
+ | |- | ||
+ | | 2439973 | ||
+ | | Primary Facility | ||
+ | | 2016-01-12 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | 1/12/2016 Produced fluids tanks diked and GPU's | ||
+ | |- | ||
+ | | 2512577 | ||
+ | | Primary Facility | ||
+ | | 2016-08-22 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to stable. | ||
+ | |- | ||
+ | | 2516764 | ||
+ | | Primary Facility | ||
+ | | 2016-08-31 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | |- | ||
+ | | 2534593 | ||
+ | | Primary Facility | ||
+ | | 2016-10-31 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | |- | ||
+ | | 2543491 | ||
+ | | Primary Facility | ||
+ | | 2016-12-08 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | |- | ||
+ | | 2554467 | ||
+ | | Primary Facility | ||
+ | | 2017-01-23 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | |- | ||
+ | | 2559627 | ||
+ | | Primary Facility | ||
+ | | 2017-02-07 | ||
+ | | Routine/Partial Inspection | ||
+ | | No Violations Noted | ||
+ | | At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. | ||
+ | |- | ||
+ | | 2566636 | ||
+ | | Primary Facility | ||
+ | | 2017-03-01 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road. | ||
+ | |- | ||
+ | | 2590625 | ||
+ | | Primary Facility | ||
+ | | 2017-05-05 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP. | ||
+ | |- | ||
+ | | 2614801 | ||
+ | | Primary Facility | ||
+ | | 2017-07-13 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition. | ||
|- | |- | ||
|} | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
− | | title = Oil and Gas | + | | title =Oil and Gas Compliance Report |
− | + | |publisher = [[Pennsylvania Department of Environmental Protection]] | |
− | + | | date = 2019-05-20 | |
− | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | + | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources |
− | | accessdate = | + | | accessdate = 2019-05-21 }}</ref> |
− | + | == Fracking Activities == | |
− | == | + | ==== Fracking Jobs ==== |
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | | 1 | ||
+ | | 09/13/2013 | ||
+ | | 09/19/2013 | ||
+ | | style="text-align: right;" | 8039 | ||
+ | | style="text-align: right;" | 4,643,070.0 | ||
+ | | style="text-align: right;" | | ||
+ | |- | ||
+ | |} | ||
+ | ==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | |||
− | |||
!scope="col" | Trade Name | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | CAS | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
|- | |- | ||
− | | | + | |- valign="top" |
+ | | rowspan="12"| 1 | ||
+ | | rowspan="1"| Scale Inhibitor A | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Scale Inhibitor | ||
| Ethylene Glycol | | Ethylene Glycol | ||
− | |||
− | |||
− | |||
| 107-21-1 | | 107-21-1 | ||
− | | | + | | style="text-align: right;" | 30 |
+ | | style="text-align: right;" | 0.00775 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Unislik ST 50 | ||
+ | | rowspan="1"| CESI | ||
+ | | rowspan="1"| Friction Reducer | ||
+ | | Hydrotreated Light Distillite | ||
+ | | 64742-47-8 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.03079 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |- valign="top" |
+ | | rowspan="1"| ASP 900 | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Friction Reducer | ||
| Ammonium Sulfate | | Ammonium Sulfate | ||
− | |||
− | |||
− | |||
| 7783-20-2 | | 7783-20-2 | ||
− | | | + | | style="text-align: right;" | 30 |
+ | | style="text-align: right;" | | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| CMHPG | ||
+ | | rowspan="1"| Ashland | ||
+ | | rowspan="1"| Water Viscosifier | ||
+ | | Carboxymethyl Hydroxporoyl Guar Blend | ||
+ | | 68130-15-4 | ||
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 0.00268 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |- valign="top" |
+ | | rowspan="1"| Iron Control A | ||
+ | | rowspan="1"| Nalco | ||
+ | | rowspan="1"| Iron Control | ||
| Ethylene Glycol | | Ethylene Glycol | ||
− | |||
− | |||
− | |||
| 107-21-1 | | 107-21-1 | ||
− | | | + | | style="text-align: right;" | 30 |
+ | | style="text-align: right;" | 0.00752 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="3"| EC 6116a | ||
+ | | rowspan="3"| Nalco | ||
+ | | rowspan="3"| Biocide | ||
+ | | Polyethylene Glycol | ||
+ | | 25322-68-3 | ||
+ | | style="text-align: right;" | 60 | ||
+ | | style="text-align: right;" | 0.01576 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Dibromoacetonitrile | | Dibromoacetonitrile | ||
− | |||
− | |||
− | |||
| 3252-43-5 | | 3252-43-5 | ||
− | | | + | | style="text-align: right;" | 5 |
− | | | + | | style="text-align: right;" | 0.00131 |
− | |- | + | | style="text-align: right;" | 0 |
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |- | ||
− | | 0 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1, 1-Dibromo-3-nitrilopropionamide | ||
+ | | 10222-01-2 | ||
+ | | style="text-align: right;" | 30 | ||
+ | | style="text-align: right;" | 0.00788 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |- valign="top" |
+ | | rowspan="1"| Clean Volume | ||
+ | | rowspan="1"| Chevron Applachia, LLC | ||
+ | | rowspan="1"| Carrier/Base Fluid | ||
| H20 | | H20 | ||
− | |||
− | |||
− | |||
| 7732-18-5 | | 7732-18-5 | ||
− | | | + | | style="text-align: right;" | 100 |
+ | | style="text-align: right;" | 91.1 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| Proppant | ||
+ | | rowspan="1"| Chevron Applachia, LLC | ||
+ | | rowspan="1"| Proppant | ||
+ | | Crystalline Silica | ||
+ | | 14808-60-7 | ||
+ | | style="text-align: right;" | 100 | ||
+ | | style="text-align: right;" | 8.9 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | |- valign="top" |
− | | | + | | rowspan="1"| 15% Hcl Acid |
− | | | + | | rowspan="1"| Reagent/PPG |
− | | | + | | rowspan="1"| Used to open perfs |
− | | | + | | Hydrochloric Acid |
− | | | + | | 7647-01-0 |
− | | | + | | style="text-align: right;" | 15 |
+ | | style="text-align: right;" | 0.08676 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | |- | + | |- valign="top" |
− | | | + | | rowspan="1"| GBL |
+ | | rowspan="1"| Clearwater | ||
+ | | rowspan="1"| Gel Breaker | ||
| Ethylene Glycol | | Ethylene Glycol | ||
− | |||
− | |||
− | |||
| 107-21-1 | | 107-21-1 | ||
− | | | + | | style="text-align: right;" | 60 |
+ | | style="text-align: right;" | 0.00004000 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
− | For data sources see<ref>{{cite web | title = FracFocus | + | For data sources see<ref>{{cite web |
− | == References == | + | | title =FracFocus Fracking Chemicals Database |
− | + | | date = 2019-04-02 | |
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-06-19 }}</ref> | ||
+ | ==References== | ||
+ | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Wells]] | + | [[Category:Pennsylvania Wells]] |
+ | [[Category:FracFocus]] |
Well ID: 37-129-28657 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.194875,"lon":-79.743092,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: South Huntingdon Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 149319 | |
Farm/Lease Name: SLEITH UNIT 7H-A | |
License Status: Active | |
Spud Date: 02/12/2012 | |
Permit Date: 8/19/2011 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.194875 | |
Longitude: -79.743092 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 885,781.00 | 208 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 935,303.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 654,379.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 504,941.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 429,462.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 91,572.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2012-S01 | Drilling Fluid Waste (in Barrels) | 10,037.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012-S01 | Drilling Fluid Waste (in Barrels) | 85.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Drill Cuttings (in Tons) | 778.41 Tons | LANDFILL | 100419 |
2012-S02 | Drilling Fluid Waste (in Barrels) | 835.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2012-S02 | Fracing Fluid Waste (in Barrels) | 260.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Fracing Fluid Waste (in Barrels) | 40.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014-S01 | Fracing Fluid Waste (in Barrels) | 2,470.25 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014-S01 | Fracing Fluid Waste (in Barrels) | 5,850.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Fracturing Fluid Waste (in Tons) | 30.54 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID074259565 |
2014-S02 | Fracing Fluid Waste (in Barrels) | 4,732.75 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014-S02 | Fracing Fluid Waste (in Barrels) | 946.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 3,076.75 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 1,198.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 796.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 699.25 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 503.77 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 83.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 111.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 56.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 59.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 56.25 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 4,620.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M06 | Drilling Fluid Waste (in Barrels) RWC 803 | 24.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 32.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 28.75 Bbl | REUSE (AT WELL PAD) | |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 30.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 55.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 138.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 57.50 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 30.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 25.00 Bbl | REUSE (AT WELL PAD) | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 25.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 55.00 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 28.75 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 82.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 56.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 28.50 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 27.50 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 85.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2010400 | Primary Facility | 10/04/2011 | Drilling/Alteration | No Violations Noted | SPUDDED |
2013223 | Primary Facility | 10/21/2011 | Routine/Complete Inspection | No Violations Noted | Routine inspection of site due to spud notification. |
2021164 | Primary Facility | 11/17/2011 | Drilling/Alteration | No Violations Noted | SPUDDED, MOVING YOST RIG 6 ON PAD. |
2026079 | Primary Facility | 12/12/2011 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. |
2026773 | Primary Facility | 11/29/2011 | Drilling/Alteration | No Violations Noted | SPUDDED, MOVING YOST RIG 6 ON PAD. |
2030659 | Primary Facility | 12/21/2011 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2037558 | Primary Facility | 01/27/2012 | Routine/Complete Inspection | No Violations Noted | |
2046930 | Primary Facility | 02/29/2012 | Drilling/Alteration | No Violations Noted | |
2048776 | Primary Facility | 02/27/2012 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2048785 | Primary Facility | 03/01/2012 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2052486 | Primary Facility | 03/21/2012 | Incident- Response to Accident or Event | No Violations Noted | This was a follow up investigation to a drilling mud spill. |
2052663 | Primary Facility | 03/13/2012 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2059691 | Primary Facility | 04/16/2012 | Incident- Response to Accident or Event | In Compliance with Policy | This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted. |
2061683 | Primary Facility | 04/09/2012 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2068979 | Primary Facility | 05/15/2012 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS |
2087937 | Primary Facility | 07/18/2012 | Drilling/Alteration | No Violations Noted | 7/18/2012 Back filling drill pit, and not fraced yet. |
2093980 | Primary Facility | 08/23/2012 | Complaint Inspection | No Violations Noted | 4 wells drilled. No frac yet. 2 lined impoundments. |
2166032 | Primary Facility | 05/13/2013 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2199774 | Primary Facility | 08/16/2013 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2216353 | Primary Facility | 10/24/2013 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2228527 | Primary Facility | 11/11/2013 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2258933 | Primary Facility | 03/18/2014 | Routine/Complete Inspection | No Violations Noted | 3/18/2014 Produced fluids tanks diked and GPU's |
2310350 | Primary Facility | 10/06/2014 | Routine/Complete Inspection | No Violations Noted | 10/6/2014 Produced fluids tanks diked and GPU's |
2369028 | Primary Facility | 05/05/2015 | Routine/Complete Inspection | No Violations Noted | 5/5/2015 Produced fluids tanks diked and GPU's |
2393447 | Primary Facility | 07/02/2015 | Routine/Complete Inspection | No Violations Noted | 7/2/2015 Produced fluids tanks diked and GPU's |
2396625 | Primary Facility | 08/06/2015 | Site Restoration | No Violations Noted | Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan. |
2439973 | Primary Facility | 2016-01-12 | Routine/Complete Inspection | No Violations Noted | 1/12/2016 Produced fluids tanks diked and GPU's |
2512577 | Primary Facility | 2016-08-22 | Routine/Partial Inspection | No Violations Noted | Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to stable. |
2516764 | Primary Facility | 2016-08-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2534593 | Primary Facility | 2016-10-31 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2543491 | Primary Facility | 2016-12-08 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2554467 | Primary Facility | 2017-01-23 | Routine/Partial Inspection | No Violations Noted | At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2559627 | Primary Facility | 2017-02-07 | Routine/Partial Inspection | No Violations Noted | At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2566636 | Primary Facility | 2017-03-01 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road. |
2590625 | Primary Facility | 2017-05-05 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP. |
2614801 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition. |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 09/13/2013 | 09/19/2013 | 8039 | 4,643,070.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Scale Inhibitor A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00775 | 0 |
Unislik ST 50 | CESI | Friction Reducer | Hydrotreated Light Distillite | 64742-47-8 | 30 | 0.03079 | 0 | |
ASP 900 | Nalco | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | |||
CMHPG | Ashland | Water Viscosifier | Carboxymethyl Hydroxporoyl Guar Blend | 68130-15-4 | 100 | 0.00268 | 0 | |
Iron Control A | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00752 | 0 | |
EC 6116a | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.01576 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.00131 | 0 | ||||
1, 1-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.00788 | 0 | ||||
Clean Volume | Chevron Applachia, LLC | Carrier/Base Fluid | H20 | 7732-18-5 | 100 | 91.1 | 0 | |
Proppant | Chevron Applachia, LLC | Proppant | Crystalline Silica | 14808-60-7 | 100 | 8.9 | 0 | |
15% Hcl Acid | Reagent/PPG | Used to open perfs | Hydrochloric Acid | 7647-01-0 | 15 | 0.08676 | 0 | |
GBL | Clearwater | Gel Breaker | Ethylene Glycol | 107-21-1 | 60 | 0.00004000 | 0 |
For data sources see[7]