{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28657
 
| Well ID: 37-129-28657
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.194875, -79.743091 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.194875, -79.743092 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[South Huntingdon Township, Westmoreland County, Pennsylvania|South Huntingdon Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[South Huntingdon Township,_Westmoreland_County,_Pennsylvania|South Huntingdon Township]]
 +
|-
 +
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
 
| Well Pad ID: [[149319]]
 
| Well Pad ID: [[149319]]
Line 15: Line 19:
 
| Farm/Lease Name: SLEITH UNIT 7H-A
 
| Farm/Lease Name: SLEITH UNIT 7H-A
 
|-
 
|-
| First Permit Date: 2011-08-19
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2011-08-19
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2012-02-12
+
| Permit Date: 2011-08-19
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.194875
 
| Latitude: 40.194875
 
|-
 
|-
| Longitude: -79.743091
+
| Longitude: -79.743092
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-08-19
 +
| New Permit Application
 +
|-
 +
| 2012-01-12
 +
| Drilling Completion
 +
|-
 +
| 2012-02-12
 +
| Performed Spud Operation
 +
|-
 +
| 2012-04-16
 +
| Drilling Completion
 +
|-
 +
| 2013-01-11
 +
| NEWLY DRILLED
 +
|-
 +
| 2013-09-13
 +
| Perforation
 +
|-
 +
| 2016-06-14
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2013-09-13
 +
| 2013-09-19
 +
| style="text-align: right;" | 8,039
 +
| style="text-align: right;" | 4,643,070
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="12"| 1
 +
| rowspan="1"| Scale Inhibitor A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00775
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Unislik ST 50
 +
| rowspan="1"| CESI
 +
| rowspan="1"| Friction Reducer
 +
| Hydrotreated Light Distillite
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.03079
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium Sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| CMHPG
 +
| rowspan="1"| Ashland
 +
| rowspan="1"| Water Viscosifier
 +
| Carboxymethyl Hydroxporoyl Guar Blend
 +
| 68130-15-4
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00268
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00752
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC 6116a
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.01576
 +
| style="text-align: right;" | 0
 +
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00131
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1, 1-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00788
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Clean Volume
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Carrier/Base Fluid
 +
| H20
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 91.1
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 8.9
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Hcl Acid
 +
| rowspan="1"| Reagent/PPG
 +
| rowspan="1"| Used to open perfs
 +
| Hydrochloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.08676
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| GBL
 +
| rowspan="1"| Clearwater
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00004000
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 885,781.00
 +
| style="text-align: right;" | 208
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 935,303.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 654,379.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 504,941.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 429,462.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 353,931.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 85.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 778.41 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 260.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 10,873.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 7,203.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,076.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 30.54 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID074259565
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,796.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,994.25 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 503.77 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 782.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4,707.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 254.62 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.25 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 83.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 24.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 170.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 221.25 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 385.50 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 446.25 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 32.50 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2010400
 
| 2010400
 +
| Primary Facility
 
| 2011-10-04
 
| 2011-10-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED
 
| SPUDDED
|
 
|-
 
 
|-
 
|-
 
| 2013223
 
| 2013223
 +
| Primary Facility
 
| 2011-10-21
 
| 2011-10-21
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection of site due to spud notification.
 
| Routine inspection of site due to spud notification.
Pad was in final stages of construction.  Four wells had been spudded.
 
Drill pit was installed.  Construction on impoundment was ongoing. 
 
Pad and access road were rocked and stable.
 
BMPs in place.  Toes of slope to be seeded asap.
 
No violations noted.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2021164
 
| 2021164
 +
| Primary Facility
 
| 2011-11-17
 
| 2011-11-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED, MOVING YOST RIG 6 ON PAD.
 
| SPUDDED, MOVING YOST RIG 6 ON PAD.
|
 
|-
 
 
|-
 
|-
 
| 2026079
 
| 2026079
 +
| Primary Facility
 
| 2011-12-12
 
| 2011-12-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.
 
| Site visit was part of routine inspection.
INspection was conducted with James Grayson (Safety Chevron).
 
All equipment was on individual containment.  Some areas where pipes laid on containmnet comprimised containment.  No grease or oil stained the pad.  Stands were being made to keep pipes from laying on walls of containment and causing them to collapse.
 
Pit and impoundment were sound.  No freeboard issues.
 
Slopes of pad were not vegetated but had been hydroseeded.  Other outlying areas of disturbed area had good vegetative cover.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2026773
 
| 2026773
 +
| Primary Facility
 
| 2011-11-29
 
| 2011-11-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED, MOVING YOST RIG 6 ON PAD.
 
| SPUDDED, MOVING YOST RIG 6 ON PAD.
|
 
|-
 
 
|-
 
|-
 
| 2030659
 
| 2030659
 +
| Primary Facility
 
| 2011-12-21
 
| 2011-12-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DRILLING THE 9H.
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2037558
 
| 2037558
 +
| Primary Facility
 
| 2012-01-27
 
| 2012-01-27
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2046930
 
| 2046930
 +
| Primary Facility
 
| 2012-02-29
 
| 2012-02-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2048776
 
| 2048776
 +
| Primary Facility
 
| 2012-02-27
 
| 2012-02-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 2995'
 
PIT & HOUSEKEEPING GOOD
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048785
 
| 2048785
 +
| Primary Facility
 
| 2012-03-01
 
| 2012-03-01
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 3493'
 
PIT & HOUSEKEEPING GOOD
 
INSPECTION CONDUCTED W/OGI D. ORRAHOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2052486
 
| 2052486
 +
| Primary Facility
 
| 2012-03-21
 
| 2012-03-21
 +
| Incident- Response to Accident or Event
 
| No Violations Noted
 
| No Violations Noted
 
| This was a follow up investigation to a drilling mud spill.
 
| This was a follow up investigation to a drilling mud spill.
|
 
|-
 
 
|-
 
|-
 
| 2052663
 
| 2052663
 +
| Primary Facility
 
| 2012-03-13
 
| 2012-03-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  HORIZONTAL MARCELLUS
 
|  HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 3493'
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2059691
 
| 2059691
 +
| Primary Facility
 
| 2012-04-16
 
| 2012-04-16
 +
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
 
| This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted.
 
| This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted.
|
 
|-
 
 
|-
 
|-
 
| 2061683
 
| 2061683
 +
| Primary Facility
 
| 2012-04-09
 
| 2012-04-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 7228'
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2068979
 
| 2068979
 +
| Primary Facility
 
| 2012-05-15
 
| 2012-05-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  HORIZONTAL MARCELLUS
 
|  HORIZONTAL MARCELLUS
SPUDDED, PATTERSON RIG ON PAD, DEPTH 13841' TD
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2087937
 
| 2087937
 +
| Primary Facility
 
| 2012-07-18
 
| 2012-07-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 7/18/2012 Back filling drill pit, and not fraced yet.
 
| 7/18/2012 Back filling drill pit, and not fraced yet.
|
 
|-
 
 
|-
 
|-
 
| 2093980
 
| 2093980
 +
| Primary Facility
 
| 2012-08-23
 
| 2012-08-23
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| 4 wells drilled. No frac yet. 2 lined impoundments.
 
| 4 wells drilled. No frac yet. 2 lined impoundments.
|
 
 
|-
 
|-
|}
+
| 2166032
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2013-05-13
!scope="col" | PERIOD
+
| Routine/Complete Inspection
!scope="col" | GAS QUANTITY
+
| No Violations Noted
!scope="col" | GAS PRODUCTION DAYS
+
| At the time of inspection the well appeared to be drilled but not equipped for production.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
!scope="col" | CONDENSATE QUANTITY
+
|-
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| 2199774
!scope="col" | OIL QUANTITY
+
| Primary Facility
!scope="col" | OIL PRODUCTION DAYS
+
| 2013-08-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2216353
 +
| Primary Facility
 +
| 2013-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the Operator appears to have finished stimulation of the well.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2228527
 +
| Primary Facility
 +
| 2013-11-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2258933
 +
| Primary Facility
 +
| 2014-03-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 3/18/2014 Produced fluids tanks diked and GPU's
 +
|-
 +
| 2310350
 +
| Primary Facility
 +
| 2014-10-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 10/6/2014 Produced fluids tanks diked and GPU's
 
|-
 
|-
| 2012-2
+
| 2369028
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2015-05-05
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| 5/5/2015 Produced fluids tanks diked and GPU's
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2393447
 +
| Primary Facility
 +
| 2015-07-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 7/2/2015 Produced fluids tanks diked and GPU's
 
|-
 
|-
| 2012-1
+
| 2396625
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2015-08-06
| style="text-align:right;" | 0.0
+
| Site Restoration
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2439973
 +
| Primary Facility
 +
| 2016-01-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 1/12/2016  Produced fluids tanks diked and GPU's
 
|-
 
|-
| 2011-2
+
| 2512577
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2016-08-22
| style="text-align:right;" | 0.0
+
| Routine/Partial Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site  appeared to stable.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
|}
+
| 2516764
== Waste Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2016-08-31
!scope="col" | PERIOD
+
| Routine/Partial Inspection
!scope="col" | TYPE
+
| No Violations Noted
!scope="col" | QUANTITY
+
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
!scope="col" | UNITS
 
!scope="col" | DISPOSAL METHOD
 
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2534593
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 835.5
+
| 2016-10-31
| Bbl
+
| Routine/Partial Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0253723
+
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2543491
 +
| Primary Facility
 +
| 2016-12-08
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
|-
 
|-
| 2012-2
+
| 2554467
| FRACING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 260.0
+
| 2017-01-23
| Bbl
+
| Routine/Partial Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
 
|-
 
|-
 +
| 2559627
 +
| Primary Facility
 +
| 2017-02-07
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection, the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
|-
 
|-
| 2012-1
+
| 2566636
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 10037.5
+
| 2017-03-01
| Bbl
+
| Routine/Complete Inspection
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| No Violations Noted
| PA0253723
+
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road.
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2590625
 +
| Primary Facility
 +
| 2017-05-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP.
 
|-
 
|-
| 2012-1
+
| 2614801
| DRILLING FLUID WASTE
+
| Primary Facility
| style="text-align:right;" | 85.0
+
| 2017-07-13
| Bbl
+
| Routine/Complete Inspection
| REUSE OTHER THAN ROAD SPREADING
+
| No Violations Noted
|  
+
| Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition.
| REUSE FOR DRILLING OR PLUGGING
 
|
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:32, 16 May 2020

Well Details

Well ID: 37-129-28657
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149319
Farm/Lease Name: SLEITH UNIT 7H-A
License Status:
Spud Date:
Permit Date: 2011-08-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.194875
Longitude: -79.743092

For data sources see[1][2][3]

Well History

Date Event
2011-08-19 New Permit Application
2012-01-12 Drilling Completion
2012-02-12 Performed Spud Operation
2012-04-16 Drilling Completion
2013-01-11 NEWLY DRILLED
2013-09-13 Perforation
2016-06-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-13 2013-09-19 8,039 4,643,070

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00775 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03079 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00268 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00752 0
EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.01576 0
Dibromoacetonitrile 3252-43-5 5 0.00131 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00788 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91.1 0
Proppant Chevron Applachia, LLC Proppant Crystalline Silica 14808-60-7 100 8.9 0
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.08676 0
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00004000 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 885,781.00 208 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 935,303.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 654,379.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 504,941.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 429,462.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 353,931.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 85.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 778.41 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste 260.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 10,873.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,203.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,076.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 30.54 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,796.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,994.25 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 503.77 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 782.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 4,707.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 254.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 58.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 83.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 170.00 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 221.25 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 385.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 446.25 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 32.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2010400 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted SPUDDED
2013223 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Routine inspection of site due to spud notification.
2021164 Primary Facility 2011-11-17 Drilling/Alteration No Violations Noted SPUDDED, MOVING YOST RIG 6 ON PAD.
2026079 Primary Facility 2011-12-12 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2026773 Primary Facility 2011-11-29 Drilling/Alteration No Violations Noted SPUDDED, MOVING YOST RIG 6 ON PAD.
2030659 Primary Facility 2011-12-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2037558 Primary Facility 2012-01-27 Routine/Complete Inspection No Violations Noted
2046930 Primary Facility 2012-02-29 Drilling/Alteration No Violations Noted
2048776 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2048785 Primary Facility 2012-03-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052486 Primary Facility 2012-03-21 Incident- Response to Accident or Event No Violations Noted This was a follow up investigation to a drilling mud spill.
2052663 Primary Facility 2012-03-13 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2059691 Primary Facility 2012-04-16 Incident- Response to Accident or Event In Compliance with Policy This was a small drilling mud spill inspection. Mud spilled onto plastic containment. No issues noted.
2061683 Primary Facility 2012-04-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2068979 Primary Facility 2012-05-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2087937 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted 7/18/2012 Back filling drill pit, and not fraced yet.
2093980 Primary Facility 2012-08-23 Complaint Inspection No Violations Noted 4 wells drilled. No frac yet. 2 lined impoundments.
2166032 Primary Facility 2013-05-13 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2199774 Primary Facility 2013-08-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216353 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228527 Primary Facility 2013-11-11 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2258933 Primary Facility 2014-03-18 Routine/Complete Inspection No Violations Noted 3/18/2014 Produced fluids tanks diked and GPU's
2310350 Primary Facility 2014-10-06 Routine/Complete Inspection No Violations Noted 10/6/2014 Produced fluids tanks diked and GPU's
2369028 Primary Facility 2015-05-05 Routine/Complete Inspection No Violations Noted 5/5/2015 Produced fluids tanks diked and GPU's
2393447 Primary Facility 2015-07-02 Routine/Complete Inspection No Violations Noted 7/2/2015 Produced fluids tanks diked and GPU's
2396625 Primary Facility 2015-08-06 Site Restoration No Violations Noted Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
2439973 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 Produced fluids tanks diked and GPU's
2512577 Primary Facility 2016-08-22 Routine/Partial Inspection No Violations Noted Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to stable.
2516764 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2534593 Primary Facility 2016-10-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2543491 Primary Facility 2016-12-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2554467 Primary Facility 2017-01-23 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2559627 Primary Facility 2017-02-07 Routine/Partial Inspection No Violations Noted At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2566636 Primary Facility 2017-03-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road.
2590625 Primary Facility 2017-05-05 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP.
2614801 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition.

For data sources see[8]