X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28658"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28658
 
| Well ID: 37-129-28658
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.194822, -79.742944 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.194822, -79.742944 | width=100% | height=100% }}
 +
|-
 +
| Country: United States
 +
|-
 +
| State: Pennsylvania
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| Municipality: [[South Huntingdon Township, Westmoreland County, Pennsylvania|South Huntingdon Township]]
+
| Municipality: [[South Huntingdon Township,_Westmoreland_County,_Pennsylvania|South Huntingdon Township]]
 
|-
 
|-
| Operator Name: [[CHEVRON APPALACHIA LLC|CHEVRON APPALACHIA LLC]]
+
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
 
| Well Pad ID: [[149319]]
 
| Well Pad ID: [[149319]]
Line 14: Line 19:
 
| Farm/Lease Name: SLEITH UNIT 8H
 
| Farm/Lease Name: SLEITH UNIT 8H
 
|-
 
|-
| First Permit Date: 2011-08-19
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2011-08-19
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-10-03
+
| Permit Date: 2011-08-19
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 1
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.194822
 
| Latitude: 40.194822
 
|-
 
|-
 
| Longitude: -79.742944
 
| Longitude: -79.742944
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-08-19
 +
| New Permit Application
 +
|-
 +
| 2011-10-03
 +
| Performed Spud Operation
 +
|-
 +
| 2012-05-04
 +
| Drilling Completion
 +
|-
 +
| 2013-09-26
 +
| Perforation
 +
|-
 +
| 2016-06-14
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 491,160.00
 +
| style="text-align: right;" | 208
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 525,734.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 379,548.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 285,981.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 222,691.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 170,638.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 365.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 778.41 Tons
 +
| LANDFILL
 +
| 100419
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 3,443.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 +
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 40.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 7,203.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 3,076.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 30.54 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID074259565
 +
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,796.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,994.25 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 503.77 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 782.75 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4,707.50 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 254.62 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 58.25 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 83.00 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 24.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW019
 +
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 168.75 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 193.75 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 385.50 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 30.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW005
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 446.25 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 32.50 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 
|-
 
|-
 
| 2010414
 
| 2010414
 +
| Primary Facility
 
| 2011-10-04
 
| 2011-10-04
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED
 
| SPUDDED
|
 
|-
 
 
|-
 
|-
 
| 2013220
 
| 2013220
 +
| Primary Facility
 
| 2011-10-21
 
| 2011-10-21
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection of site due to spud notification.
 
| Routine inspection of site due to spud notification.
Pad was in final stages of construction.  Four wells had been spudded.
 
Drill pit was installed.  Construction on impoundment was ongoing. 
 
Pad and access road were rocked and stable.
 
BMPs in place.  Toes of slope to be seeded asap.
 
No violations noted.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2021172
 
| 2021172
 +
| Primary Facility
 
| 2011-11-17
 
| 2011-11-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED, MOVING YOST RIG 6 ONTO PAD.
 
| SPUDDED, MOVING YOST RIG 6 ONTO PAD.
|
 
|-
 
 
|-
 
|-
 
| 2026110
 
| 2026110
 +
| Primary Facility
 
| 2011-12-12
 
| 2011-12-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Site visit was part of routine inspection.
 
| Site visit was part of routine inspection.
INspection was conducted with James Grayson (Safety Chevron).
 
All equipment was on individual containment.  Some areas where pipes laid on containmnet comprimised containment.  No grease or oil stained the pad.  Stands were being made to keep pipes from laying on walls of containment and causing them to collapse.
 
Pit and impoundment were sound.  No freeboard issues.
 
Slopes of pad were not vegetated but had been hydroseeded.  Other outlying areas of disturbed area had good vegetative cover.
 
No violations noted at this time.
 
 
|
 
|-
 
 
|-
 
|-
 
| 2026740
 
| 2026740
 +
| Primary Facility
 
| 2011-11-29
 
| 2011-11-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| YOST RIG 6 RUNNING 85/8" CSG. TO DEPTH OF 2868'.  GAS SHOW @ 2338' FLARED FOR APPROX 10HRS THEN DIED DOWN.
 
| YOST RIG 6 RUNNING 85/8" CSG. TO DEPTH OF 2868'.  GAS SHOW @ 2338' FLARED FOR APPROX 10HRS THEN DIED DOWN.
|
 
|-
 
 
|-
 
|-
 
| 2026763
 
| 2026763
 +
| Primary Facility
 
| 2011-11-29
 
| 2011-11-29
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| SPUDDED, MOVING YOST RIG 6 ONTO PAD.
 
| SPUDDED, MOVING YOST RIG 6 ONTO PAD.
|
 
|-
 
 
|-
 
|-
 
| 2030604
 
| 2030604
 +
| Primary Facility
 
| 2011-12-21
 
| 2011-12-21
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DRILLING THE 9H.
 
PIT & HOUSEKEEPING GOOD
 
INSPECTION CONDUCTED W/OGI J. OLSON
 
 
|
 
|-
 
 
|-
 
|-
 
| 2037028
 
| 2037028
 +
| Primary Facility
 
| 2012-01-17
 
| 2012-01-17
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DRILLING THE 9H.
 
PIT & HOUSEKEEPING GOOD
 
INSPECTION CONDUCTED W/OGI P. WYRWAS
 
 
|
 
|-
 
 
|-
 
|-
 
| 2037562
 
| 2037562
 +
| Primary Facility
 
| 2012-01-27
 
| 2012-01-27
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|
 
|-
 
 
|-
 
|-
 
| 2048807
 
| 2048807
 +
| Primary Facility
 
| 2012-02-27
 
| 2012-02-27
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 7892'
 
PIT & HOUSEKEEPING GOOD
 
 
 
|
 
|-
 
 
|-
 
|-
 
| 2048831
 
| 2048831
 +
| Primary Facility
 
| 2012-03-01
 
| 2012-03-01
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 7892'
 
PIT & HOUSEKEEPING GOOD
 
INSPECTION CONDUCTED W/OGI D. ORRAHOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2052256
 
| 2052256
 +
| Primary Facility
 
| 2012-03-13
 
| 2012-03-13
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 7892'
 
PIT & HOUSEKEEPING GOOD
 
MOVED RIR BACK OVER THE WELL TO SET A PLUG ON TOP OF MUD MOTOR, (7746' - 7892).
 
 
|
 
|-
 
 
|-
 
|-
 
| 2052487
 
| 2052487
 +
| Primary Facility
 
| 2012-03-21
 
| 2012-03-21
 +
| Incident- Response to Accident or Event
 
| No Violations Noted
 
| No Violations Noted
 
| This is a folow up Investigation to a spill.
 
| This is a folow up Investigation to a spill.
|
 
|-
 
 
|-
 
|-
 
| 2061688
 
| 2061688
 +
| Primary Facility
 
| 2012-04-09
 
| 2012-04-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
SPUDDED, YOST RIG 6 ON PAD, DEPTH 7892'
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2068976
 
| 2068976
 +
| Primary Facility
 
| 2012-05-15
 
| 2012-05-15
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| HORIZONTAL MARCELLUS
 
| HORIZONTAL MARCELLUS
PATTERSON RIG  ON PAD, DEPTH 11794'
 
PIT & HOUSEKEEPING GOOD
 
 
|
 
|-
 
 
|-
 
|-
 
| 2087934
 
| 2087934
 +
| Primary Facility
 
| 2012-07-18
 
| 2012-07-18
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| 7/18/2012 Back filling drill pit, and not fraced yet.
 
| 7/18/2012 Back filling drill pit, and not fraced yet.
|
 
|-
 
 
|-
 
|-
 
| 2093986
 
| 2093986
 +
| Primary Facility
 
| 2012-08-23
 
| 2012-08-23
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| 4 wells drilled. No frac yet. 2 lined impoundments. E&S ok.
 
| 4 wells drilled. No frac yet. 2 lined impoundments. E&S ok.
|
 
|-
 
 
|-
 
|-
 
| 2108285
 
| 2108285
 +
| Primary Facility
 
| 2012-10-04
 
| 2012-10-04
 +
| Incident- Response to Accident or Event
 
| Violation(s) Noted
 
| Violation(s) Noted
 
| Company had an uncontrolled release of Frack fluids onto the ground. This happened while they were fracking the 8H well.
 
| Company had an uncontrolled release of Frack fluids onto the ground. This happened while they were fracking the 8H well.
| 651551
 
|-
 
 
|-
 
|-
 
| 2113337
 
| 2113337
 +
| Primary Facility
 
| 2012-10-05
 
| 2012-10-05
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Checking on site after wellhead on 8H was dismantled and repaired; Location is covered and protected; no signs of any surface oil or material from well; annular pipe was replaced; Preparing location for remediation work;
 
| Checking on site after wellhead on 8H was dismantled and repaired; Location is covered and protected; no signs of any surface oil or material from well; annular pipe was replaced; Preparing location for remediation work;
|
 
|-
 
 
|-
 
|-
 
| 2115816
 
| 2115816
 +
| Primary Facility
 
| 2012-11-15
 
| 2012-11-15
 +
| Follow-up Inspection
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
| This was a followup to a spill. No violations noted.
+
| This was a followup to a spill.
|
 
|-
 
 
|-
 
|-
 
| 2120056
 
| 2120056
 +
| Primary Facility
 
| 2012-12-03
 
| 2012-12-03
 +
| Routine/Complete Inspection
 
| Pending
 
| Pending
 
| Follow up inspection to a recent brine spill. No issues noted.
 
| Follow up inspection to a recent brine spill. No issues noted.
|
 
 
|-
 
|-
|}
+
| 2153743
== Production Data ==
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2013-04-04
!scope="col" | PERIOD
+
| Follow-up Inspection
!scope="col" | GAS QUANTITY
+
| Outstanding Violations - No Viols Req'd
!scope="col" | GAS PRODUCTION DAYS
+
| Conducted a follow up inspection with Ed Bates. Chevron went over the cleanup of the well pad from the  October 2012 brine release.
!scope="col" | CONDENSATE QUANTITY
+
|-
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| 2166037
!scope="col" | OIL QUANTITY
+
| Primary Facility
!scope="col" | OIL PRODUCTION DAYS
+
| 2013-05-13
 +
| Follow-up Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| At the time of inspection the well appeared to be drilled but not equipped for production.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department is still awaiting the results of the October 2012 clean up process to be approved. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2199776
 +
| Primary Facility
 +
| 2013-08-16
 +
| Follow-up Inspection
 +
| Outstanding Violations - No Viols Req'd
 +
| At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator submit sample results from the October 2012 casing failure, in order for the Department to verify cleanup was conducted to restore background. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2216357
 +
| Primary Facility
 +
| 2013-10-24
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the Operator appears to have finished stimulation of the well.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2228530
 +
| Primary Facility
 +
| 2013-11-11
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road.  The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained.  No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2258938
 +
| Primary Facility
 +
| 2014-03-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 3/18/2014 Produced fluids tanks diked and GPU's
 +
|-
 +
| 2260022
 +
| Primary Facility
 +
| 2014-04-07
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
|                                                  4/7/14 CEI Inspection
 +
|-
 +
| 2260027
 +
| Primary Facility
 +
| 2014-04-07
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
|                                                  4/7/14 CEI Inspection
 +
|-
 +
| 2310356
 +
| Primary Facility
 +
| 2014-10-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 10/6/2014 Produced fluids tanks diked and GPU's
 +
|-
 +
| 2369029
 +
| Primary Facility
 +
| 2015-05-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 5/5/2015 Produced fluids tanks diked and GPU's
 +
|-
 +
| 2393448
 +
| Primary Facility
 +
| 2015-07-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 7/2/2015 Produced fluids tanks diked and GPU's
 +
|-
 +
| 2396622
 +
| Primary Facility
 +
| 2015-08-06
 +
| Site Restoration
 +
| No Violations Noted
 +
| Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015.  At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete.  The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
 +
|-
 +
| 2439977
 +
| Primary Facility
 +
| 2016-01-12
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| 1/12/2016  Produced fluids tanks diked and GPU's
 +
|-
 +
| 2512578
 +
| Primary Facility
 +
| 2016-08-22
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site  appeared to be stable.
 +
|-
 +
| 2516766
 +
| Primary Facility
 +
| 2016-08-31
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2534596
 +
| Primary Facility
 +
| 2016-10-31
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2543498
 +
| Primary Facility
 +
| 2016-12-08
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
|-
 
|-
| 2012-2
+
| 2554470
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-01-23
| style="text-align:right;" | 0.0
+
| Routine/Partial Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2559630
 +
| Primary Facility
 +
| 2017-02-07
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection, the well was drilled and equipped for production.  The well apparatus and brine tank appeared to be in sound condition.  No observation of accelerated erosion or sedimentation in relation to the well pad or access road.  See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
|-
 
|-
| 2012-1
+
| 2566638
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-03-01
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2590627
 +
| Primary Facility
 +
| 2017-05-05
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP.
 
|-
 
|-
| 2011-2
+
| 2614802
| style="text-align:right;" | 0.0
+
| Primary Facility
| style="text-align:right;" | 0.0
+
| 2017-07-13
| style="text-align:right;" | 0.0
+
| Routine/Complete Inspection
| style="text-align:right;" | 0.0
+
| No Violations Noted
| style="text-align:right;" | 0.0
+
| Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition.
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
== Waste Data ==
+
==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | TYPE
+
!scope="col" | Violation ID
!scope="col" | QUANTITY
+
!scope="col" | Violation Date
!scope="col" | UNITS
+
!scope="col" | Date Resolved
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Violation Code
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Violation Type
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Violation Comments
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
| 2012-2
+
| 2108285
| DRILLING FLUID WASTE
+
| 651551
| style="text-align:right;" | 135.5
+
| 10/04/2012
| Bbl
+
| 2012-10-04
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
| PA0253723
+
| Environmental Health & Safety
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
+
| Site assessment/Remedial Plan recvd SWRO 8/21/13
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
|}
 +
==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 
|-
 
|-
| 2012-2
+
| 651551
| DRILLING FLUID WASTE
+
| 306648
| style="text-align:right;" | 365.0
+
| NOV - Notice of Violation
| Bbl
+
| Comply/Closed
| REUSE OTHER THAN ROAD SPREADING
 
 
|  
 
|  
| REUSE FOR DRILLING OR PLUGGING
+
| 2014-05-07
|
+
| style="text-align: right;" |  
| PA
+
| style="text-align: right;" |  
|-
 
|-
 
| 2012-1
 
| DRILLING FLUID WASTE
 
| style="text-align:right;" | 3307.5
 
| Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0253723
 
| APPALACHIAN WATER SERVICES LLC (RONCO WTP)
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Latest revision as of 13:32, 16 May 2020

Well Details

Well ID: 37-129-28658
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 149319
Farm/Lease Name: SLEITH UNIT 8H
License Status:
Spud Date:
Permit Date: 2011-08-19
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.194822
Longitude: -79.742944

For data sources see[1][2][3]

Well History

Date Event
2011-08-19 New Permit Application
2011-10-03 Performed Spud Operation
2012-05-04 Drilling Completion
2013-09-26 Perforation
2016-06-14 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 491,160.00 208 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 525,734.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 379,548.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 285,981.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 222,691.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 170,638.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 365.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHEVRON APPALACHIA LLC Drill Cuttings 778.41 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 3,443.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 40.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,203.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Produced Fluid 3,076.75 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 30.54 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,796.75 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,994.25 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 503.77 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 782.75 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 4,707.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 254.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 58.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 CHEVRON APPALACHIA LLC Produced Fluid 83.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 168.75 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 193.75 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 385.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 CHEVRON APPALACHIA LLC Produced Fluid 30.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 CHEVRON APPALACHIA LLC Produced Fluid 446.25 Bbl REUSE (AT WELL PAD)
2019 CHEVRON APPALACHIA LLC Produced Fluid 32.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2010414 Primary Facility 2011-10-04 Drilling/Alteration No Violations Noted SPUDDED
2013220 Primary Facility 2011-10-21 Routine/Complete Inspection No Violations Noted Routine inspection of site due to spud notification.
2021172 Primary Facility 2011-11-17 Drilling/Alteration No Violations Noted SPUDDED, MOVING YOST RIG 6 ONTO PAD.
2026110 Primary Facility 2011-12-12 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2026740 Primary Facility 2011-11-29 Drilling/Alteration No Violations Noted YOST RIG 6 RUNNING 85/8" CSG. TO DEPTH OF 2868'. GAS SHOW @ 2338' FLARED FOR APPROX 10HRS THEN DIED DOWN.
2026763 Primary Facility 2011-11-29 Drilling/Alteration No Violations Noted SPUDDED, MOVING YOST RIG 6 ONTO PAD.
2030604 Primary Facility 2011-12-21 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2037028 Primary Facility 2012-01-17 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2037562 Primary Facility 2012-01-27 Routine/Complete Inspection No Violations Noted
2048807 Primary Facility 2012-02-27 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2048831 Primary Facility 2012-03-01 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052256 Primary Facility 2012-03-13 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2052487 Primary Facility 2012-03-21 Incident- Response to Accident or Event No Violations Noted This is a folow up Investigation to a spill.
2061688 Primary Facility 2012-04-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2068976 Primary Facility 2012-05-15 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2087934 Primary Facility 2012-07-18 Drilling/Alteration No Violations Noted 7/18/2012 Back filling drill pit, and not fraced yet.
2093986 Primary Facility 2012-08-23 Complaint Inspection No Violations Noted 4 wells drilled. No frac yet. 2 lined impoundments. E&S ok.
2108285 Primary Facility 2012-10-04 Incident- Response to Accident or Event Violation(s) Noted Company had an uncontrolled release of Frack fluids onto the ground. This happened while they were fracking the 8H well.
2113337 Primary Facility 2012-10-05 Routine/Complete Inspection No Violations Noted Checking on site after wellhead on 8H was dismantled and repaired; Location is covered and protected; no signs of any surface oil or material from well; annular pipe was replaced; Preparing location for remediation work;
2115816 Primary Facility 2012-11-15 Follow-up Inspection Outstanding Violations - No Viols Req'd This was a followup to a spill.
2120056 Primary Facility 2012-12-03 Routine/Complete Inspection Pending Follow up inspection to a recent brine spill. No issues noted.
2153743 Primary Facility 2013-04-04 Follow-up Inspection Outstanding Violations - No Viols Req'd Conducted a follow up inspection with Ed Bates. Chevron went over the cleanup of the well pad from the October 2012 brine release.
2166037 Primary Facility 2013-05-13 Follow-up Inspection Outstanding Violations - No Viols Req'd At the time of inspection the well appeared to be drilled but not equipped for production. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department is still awaiting the results of the October 2012 clean up process to be approved. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2199776 Primary Facility 2013-08-16 Follow-up Inspection Outstanding Violations - No Viols Req'd At the time of inspection the well appeared to be drilled but not equipped for production. The Operator was in the process of reconfiguring the site for stimulation. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator submit sample results from the October 2012 casing failure, in order for the Department to verify cleanup was conducted to restore background. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2216357 Primary Facility 2013-10-24 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2228530 Primary Facility 2013-11-11 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appears to have finished stimulation of the well, however no production equipment on site. During the inspection the Operator was in the process of backfilling the pit closest to the well heads, when viewed from the access road. The Erosion and Sedimentation plan was onsite and all associated BMPs appeared to properly installed and maintained. No observation of accelerated erosion or sedimentation observed in relation to the well pad or access road during inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2258938 Primary Facility 2014-03-18 Routine/Complete Inspection No Violations Noted 3/18/2014 Produced fluids tanks diked and GPU's
2260022 Primary Facility 2014-04-07 Compliance Evaluation No Violations Noted 4/7/14 CEI Inspection
2260027 Primary Facility 2014-04-07 Compliance Evaluation No Violations Noted 4/7/14 CEI Inspection
2310356 Primary Facility 2014-10-06 Routine/Complete Inspection No Violations Noted 10/6/2014 Produced fluids tanks diked and GPU's
2369029 Primary Facility 2015-05-05 Routine/Complete Inspection No Violations Noted 5/5/2015 Produced fluids tanks diked and GPU's
2393448 Primary Facility 2015-07-02 Routine/Complete Inspection No Violations Noted 7/2/2015 Produced fluids tanks diked and GPU's
2396622 Primary Facility 2015-08-06 Site Restoration No Violations Noted Inspection in response to the Operators submittal of a "Well Site Restoration Report" on 1/29/2015. At the time of inspection all earth disturbance activities at the site authorized by the Well Permit were complete. The site was restored and PSCM BMPs appeared to be installed as outline in the PCSM plan.
2439977 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 Produced fluids tanks diked and GPU's
2512578 Primary Facility 2016-08-22 Routine/Partial Inspection No Violations Noted Well drilled and equipped for production. Well apparatus appeared to be in sound condition. Brine tanks placed in containment, no sheen observed in standing water inside containment. No accelerated erosion or sedimentation observed in relation to the well site or access road. The sediment basin located on site appeared to be stable.
2516766 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516759 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2534596 Primary Facility 2016-10-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2534563 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2543498 Primary Facility 2016-12-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2543478 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2554470 Primary Facility 2017-01-23 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2554449 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2559630 Primary Facility 2017-02-07 Routine/Partial Inspection No Violations Noted At the time of inspection, the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 2559624 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2566638 Primary Facility 2017-03-01 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion observed on well site or access road.
2590627 Primary Facility 2017-05-05 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well tag present. Well apparatus and brine tank appear to be in sound condition. No accelerated erosion or sedimentation observed in relation to the well site or access road. See inspection report #2590100 for additional observations related to the ESCGP.
2614802 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted Well drilled and equipped for production. Well apparatus, brine tanks and gas production units appeared to be in sound condition.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2108285 651551 10/04/2012 2012-10-04 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety Site assessment/Remedial Plan recvd SWRO 8/21/13

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
651551 306648 NOV - Notice of Violation Comply/Closed 2014-05-07

For data sources see[7]

References