X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28687"

m
m
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28687
 
| Well ID: 37-129-28687
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.266141, -79.751175 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.266142, -79.751175 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Sewickley Township, Westmoreland County, Pennsylvania|Sewickley Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 +
|-
 +
| Municipality: [[Sewickley Township,_Westmoreland_County,_Pennsylvania|Sewickley Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[145081|145081]]
+
| Well Pad ID: [[145081]]
 
|-
 
|-
 
| Farm/Lease Name: PLASSIO UNIT 6H
 
| Farm/Lease Name: PLASSIO UNIT 6H
 
|-
 
|-
| First Permit Date: 2011-10-12
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2013-03-22
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2012-06-08
+
| Permit Date: 2011-10-12
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Well Status: ACTIVE
+
| Configuration: Horizontal Well
 
|-
 
|-
| Violations: 0
+
| Conservation: Yes
 
|-
 
|-
| Latitude: 40.266141
+
| Latitude: 40.266142
 
|-
 
|-
 
| Longitude: -79.751175
 
| Longitude: -79.751175
|-
 
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Date
!scope="col" | GAS QUANTITY
+
!scope="col" | Event
!scope="col" | GAS PRODUCTION DAYS
+
|-
!scope="col" | CONDENSATE QUANTITY
+
| 2011-10-12
!scope="col" | CONDENSATE PRODUCTION DAYS
+
| New Permit Application
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2011-2
+
| 2012-06-08
| style="text-align:right;" | 0.0
+
| Performed Spud Operation
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-03-22
 +
| New Permit Application
 
|-
 
|-
| 2012-1
+
| 2013-05-12
| style="text-align:right;" | 0.0
+
| Drilling Completion
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| 2013-07-23
 +
| Perforation
 
|-
 
|-
| 2012-2
+
| 2016-06-14
| style="text-align:right;" | 0.0
+
| DEVIATED
| style="text-align:right;" | 0.0
+
|-
| style="text-align:right;" | 0.0
+
|}
| style="text-align:right;" | 0.0
+
For data sources see<ref>{{cite web
| style="text-align:right;" | 0.0
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| style="text-align:right;" | 0.0
+
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
| 1
 +
| 2013-07-23
 +
| 2013-08-01
 +
| style="text-align: right;" | 8,043
 +
| style="text-align: right;" | 5,618,950
 +
| style="text-align: right;" |
 
|-
 
|-
| 2013-1
+
|}
| style="text-align:right;" | 0.0
+
==== Fluid Composition Data ====
| style="text-align:right;" | 0.0
+
{| class="wikitable sortable" width="95%"
| style="text-align:right;" | 0.0
+
!scope="col" | Job Number
| style="text-align:right;" | 0.0
+
!scope="col" | Trade Name
| style="text-align:right;" | 0.0
+
!scope="col" | Supplier
| style="text-align:right;" | 0.0
+
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="12"| 1
 +
| rowspan="3"| EC 6116a
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.01527
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-2
+
| 1, 1-Dibromo-3-nitrilopropionamide
| style="text-align:right;" | 257708.0
+
| 10222-01-2
| style="text-align:right;" | 34.0
+
| style="text-align: right;" | 30
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00763
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00127
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
|- valign="top"
| style="text-align:right;" | 641026.0
+
| rowspan="1"| Unislik ST 50
| style="text-align:right;" | 181.0
+
| rowspan="1"| CESI
| style="text-align:right;" | 0.0
+
| rowspan="1"| Friction Reducer
| style="text-align:right;" | 0.0
+
| Hydrotreated Light Distillite
| style="text-align:right;" | 0.0
+
| 64742-47-8
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.03255
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| ASP 900
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Friction Reducer
 +
| Ammonium Sulfate
 +
| 7783-20-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
| 2014-2
+
|- valign="top"
| style="text-align:right;" | 434707.0
+
| rowspan="1"| 15% Hcl Acid
| style="text-align:right;" | 184.0
+
| rowspan="1"| Reagent/PPG
| style="text-align:right;" | 90.0
+
| rowspan="1"| Used to open perfs
| style="text-align:right;" | 184.0
+
| Hydrochloric Acid
| style="text-align:right;" | 0.0
+
| 7647-01-0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.0976
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| Chevron Applachia, LLC
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 8.78
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-02
+
|- valign="top"
| style="text-align:right;" | 59678.0
+
| rowspan="1"| CMHPG
| style="text-align:right;" | 28.0
+
| rowspan="1"| Ashland
| style="text-align:right;" | 0.0
+
| rowspan="1"| Water Viscosifier
| style="text-align:right;" | 0.0
+
| Carboxymethyl Hydroxporoyl Guar Blend
| style="text-align:right;" | 0.0
+
| 68130-15-4
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00201
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| GBL
 +
| rowspan="1"| Clearwater
 +
| rowspan="1"| Gel Breaker
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00003000
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-01
+
|- valign="top"
| style="text-align:right;" | 70415.0
+
| rowspan="1"| Clean Volume
| style="text-align:right;" | 31.0
+
| rowspan="1"| Chevron Applachia, LLC
| style="text-align:right;" | 0.0
+
| rowspan="1"| Carrier/Base Fluid
| style="text-align:right;" | 0.0
+
| H20
| style="text-align:right;" | 0.0
+
| 7732-18-5
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 91.22
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
|- valign="top"
 +
| rowspan="1"| Iron Control A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00711
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2015-03
+
|- valign="top"
| style="text-align:right;" | 62822.0
+
| rowspan="1"| Scale Inhibitor A
| style="text-align:right;" | 31.0
+
| rowspan="1"| Nalco
| style="text-align:right;" | 0.0
+
| rowspan="1"| Scale Inhibitor
| style="text-align:right;" | 0.0
+
| Ethylene Glycol
| style="text-align:right;" | 0.0
+
| 107-21-1
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00755
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =FracFocus Fracking Chemicals Database
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
| date = 2019-04-02
| date = 2015-05-26
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | accessdate = 2019-06-19 }}</ref>
  | accessdate = 2015-05-27 }}</ref>
+
<!--== Stimulation Data ==
== Waste Data ==
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator Name
!scope="col" | QUANTITY
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | UNITS
+
!scope="col" | Gas Production Days
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Oil Production Days
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Water Quantity (bbl)
!scope="col" | FACILITY CITY
+
!scope="col" | Water Production Days
!scope="col" | FACILITY STATE
+
|-
 +
| 2011
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-2
+
| 2013
| DRILL CUTTINGS
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 13.77
+
| style="text-align: right;" | 257,708.00
| Tons
+
| style="text-align: right;" | 34
| LANDFILL
+
| style="text-align: right;" | 0.00
| 100419
+
| style="text-align: right;" | 0
| ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL
+
| style="text-align: right;" | 0.00
| MCCLELLANDTOWN
+
| style="text-align: right;" | 0
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 1,075,733.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 90.00
 +
| style="text-align: right;" | 184
 
|-
 
|-
| 2012-2
+
| 2015
| DRILLING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 5.0
+
| style="text-align: right;" | 671,823.00
| Bbl
+
| style="text-align: right;" | 365
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 0.00
| WMGR123SW001
+
| style="text-align: right;" | 0
| RONCO WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 0.00
| MASONTOWN
+
| style="text-align: right;" | 0
| PA
 
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 510,971.00
 +
| style="text-align: right;" | 366
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2017
| DRILLING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 6.0
+
| style="text-align: right;" | 398,875.00
| Bbl
+
| style="text-align: right;" | 365
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 0.00
| WMGR123SW001
+
| style="text-align: right;" | 0
| RONCO WASTE PROCESSING FACILITY
+
| style="text-align: right;" | 0.00
| MASONTOWN
+
| style="text-align: right;" | 0
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 353,605.00
 +
| style="text-align: right;" | 365
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-1
+
| 2019
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 100.0
+
| style="text-align: right;" | 256,370.00
| Bbl
+
| style="text-align: right;" | 365
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
| REUSE FOR DRILLING OR PLUGGING
+
| style="text-align: right;" | 0.00
|  
+
| style="text-align: right;" | 0
|  
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2013-2
+
| 2012
| DRILL CUTTINGS
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 1.0
+
| Drill Cuttings
| Tons
+
| style="text-align: right;" | 13.77 Tons
 
| LANDFILL
 
| LANDFILL
| 100592
+
| 100419
| SOUTH HILLS LANDFILL
 
| SOUTH HILLS
 
| PA
 
 
|-
 
|-
|-
+
| 2012
| 2013-2
+
| [[CHEVRON APPALACHIA LLC]]
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 5,840.00 Bbl
| Bbl
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drill Cuttings
 +
| style="text-align: right;" | 1,249.57 Tons
 +
| LANDFILL
 +
| 100592
 
|-
 
|-
| 2013-2
+
| 2013
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 6.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,195.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,012.20 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2013-2
+
| 2013
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 6.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 175.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
| 2013-2
+
| 2013
| PRODUCED FLUID
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 1.0
+
| Fracing Fluid Waste
| Bbl
+
| style="text-align: right;" | 7,033.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
|-
+
| 2013
| 2013-2
+
| [[CHEVRON APPALACHIA LLC]]
| PRODUCED FLUID
+
| Drilling Fluid Waste
| style="text-align:right;" | 175.0
+
| style="text-align: right;" | 1,455.30 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Drilling Fluid Waste
 +
| style="text-align: right;" | 6,490.10 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW001
 
|-
 
|-
| 2014-1
+
| 2014
| FLOWBACK FRACTURING SAND
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 3.94
+
| Fracturing Fluid Waste
| Tons
+
| style="text-align: right;" | 36.21 Tons
 
| LANDFILL
 
| LANDFILL
| 100172
+
| 100592
| ARDEN LANDFILL
+
|-
| WASHINGTON
+
| 2014
| PA
+
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 6,797.33 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 23.72 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID074259565
 
|-
 
|-
| 2014-1
+
| 2014
| FLOWBACK FRACTURING SAND
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 14.92
+
| Fracturing Fluid Waste
| Tons
+
| style="text-align: right;" | 14.92 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
| KELLEY RUN LANDFILL
 
| ELIZABETH
 
| PA
 
 
|-
 
|-
|-
+
| 2014
| 2014-1
+
| [[CHEVRON APPALACHIA LLC]]
| FLOWBACK FRACTURING SAND
+
| Fracturing Fluid Waste
| style="text-align:right;" | 36.21
+
| style="text-align: right;" | 3.94 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
| 100592
+
| 100172
| SOUTH HILLS LANDFILL
 
| SOUTH HILLS
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 90.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 
|-
 
|-
| 2014-1
+
| 2014
| FLOWBACK FRACTURING SAND
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 23.72
+
| Fracing Fluid Waste
| Tons
+
| style="text-align: right;" | 39,369.66 Bbl
| STORAGE PENDING DISPOSAL OR REUSE
+
| REUSE OTHER THAN ROAD SPREADING
| MID074259565
+
|  
| US ECOLOGY
 
| DETROIT
 
| MI
 
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 4,830.67 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-1
+
| 2014
| FLOWBACK FRACTURING SAND
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 25.62
+
| Fracturing Fluid Waste
| Tons
+
| style="text-align: right;" | 25.62 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100280
 
| 100280
| VALLEY LANDFILL
 
| IRWIN
 
| PA
 
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Fracturing Fluid Waste
 +
| style="text-align: right;" | 7.85 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| MID074259565
 
|-
 
|-
| 2014-1
+
| 2015
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 39.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 1,014.99 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 337.35 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 
|-
 
|-
| 2014-1
+
| 2016
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 6.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 467.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
|-
 
| 2014-1
 
| PRODUCED FLUID
 
| style="text-align:right;" | 3.0
 
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
+
|-
|
+
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 186.67 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,582.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123SW001
 
|-
 
|-
| 2014-2
+
| 2017
| FLOWBACK FRACTURING SAND
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 7.85
+
| Produced Fluid
| Tons
+
| style="text-align: right;" | 146.67 Bbl
| RESIDUAL WASTE TRANSFER FACILITY
+
| RESIDUAL WASTE PROCESSING FACILITY
| MID074259565
+
| WMGR123SW019
| US ECOLOGY
 
| DETROIT
 
| MI
 
 
|-
 
|-
 +
| 2017
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 33.33 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 
|-
 
|-
| 2014-2
+
| 2017
| FRACING FLUID WASTE
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 145.0
+
| Drilling Fluid Waste
| Bbl
+
| style="text-align: right;" | 35.33 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW001
+
| WMGR123SW019
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2018
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 98.33 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
| 2014-2
+
| 2018
| PRODUCED FLUID
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 875.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 414.34 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
 
|  
 
|  
 +
|-
 +
| 2019
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 383.33 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
|-
 
|-
 
| 2014-2
 
| PRODUCED FLUID
 
| style="text-align:right;" | 90.0
 
| Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2054138
 
| 2054138
 +
| Primary Facility
 
| 2012-03-26
 
| 2012-03-26
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| No E&S issues noted.
 
| No E&S issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2057905
 
| 2057905
 +
| Primary Facility
 
| 2012-04-10
 
| 2012-04-10
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
|
 
|
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2075061
 
| 2075061
 +
| Primary Facility
 
| 2012-06-12
 
| 2012-06-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Routine inspection no issues noted.
 
| Routine inspection no issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2077507
 
| 2077507
 +
| Primary Facility
 
| 2012-06-08
 
| 2012-06-08
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
| Horizontal Marcellus, not spudded yet.
 
| Horizontal Marcellus, not spudded yet.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2082206
 
| 2082206
 +
| Primary Facility
 
| 2012-07-11
 
| 2012-07-11
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Impoundment and water truck inspection. No issues noted.
 
| Impoundment and water truck inspection. No issues noted.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2123134
 
| 2123134
 +
| Primary Facility
 
| 2012-11-09
 
| 2012-11-09
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Horizontal Marcellus
+
| HORIZONTAL MARCELLUS
Waiting on rig to drill lateral. 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2123138
 
| 2123138
 +
| Primary Facility
 
| 2012-11-07
 
| 2012-11-07
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Horizontal Marcellus
+
| HORIZONTAL MARCELLUS
Waiting on rig to drill lateral. 
 
 
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2188806
 
| 2188806
 +
| Primary Facility
 
| 2013-08-02
 
| 2013-08-02
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| Please refer to inspection # 218802 for observations made at the Plassio Unit on 8/2/2013.
 
| Please refer to inspection # 218802 for observations made at the Plassio Unit on 8/2/2013.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2210850
 
| 2210850
 +
| Primary Facility
 
| 2013-09-20
 
| 2013-09-20
 +
| Routine/Partial Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
| Multi-well pad. On-site inspection of drill pit closest to access road. At time of inspection, pit liner had previously been removed with top perimeter of backfilled liner remaining. Pit not backfilled. Surrounded by orange security fence.
+
| Multi-well pad. On-site inspection of drill pit closest to access road. At time of inspection, pit liner had previously been removed with top perimeter of backfilled liner remaining. Pit not backfilled. Surrounded by orange security fence.
Appears bedrock has not been reached. Sand present on pit slopes.
 
 
 
Related inspection records: 2210848, 2210849
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2210859
 
| 2210859
 +
| Primary Facility
 
| 2013-09-26
 
| 2013-09-26
 +
| Routine/Partial Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
| Multi-well pad. On-site inspection of drill pit closest to access road.  
+
| Multi-well pad. On-site inspection of drill pit closest to access road.
At time of inspection, pit backfilled with remants of liner protruding from ground. Mulched for stabilization. Spoke to Chevron construction representative who stated that backfilling was completed 9/25/2013 and plans are to remove liner remnants today. 
 
 
 
Related inspection records: 2210855, 2210858
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2244607
 
| 2244607
 +
| Primary Facility
 
| 2014-02-12
 
| 2014-02-12
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
 
| At the time of inspection the well appeared to be drilled and equipped for production.  The brine tanks and well apparatus appear to be in sound condition.  The flow back pit located onsite appeared to be in sound condition with the 2' of freeboard.
 
| At the time of inspection the well appeared to be drilled and equipped for production.  The brine tanks and well apparatus appear to be in sound condition.  The flow back pit located onsite appeared to be in sound condition with the 2' of freeboard.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2272140
 +
| Primary Facility
 +
| 2014-05-20
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  The brine tanks and well apparatus appear to be in sound condition.  The Operator was in the process of removing the pit liner of pit #2.  NO observation of accelerated erosion or sedimentation in relation to the well pad or access road.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
|-
 
|-
 
| 2339166
 
| 2339166
 +
| Primary Facility
 
| 2015-01-28
 
| 2015-01-28
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  The Operator appeared to have regraded portions of the site in preparation for restoration.  Perimeter control appear to be in place, however the Department cannot verify vegetative growth due to snow cover.  The Department suggests the Operator continue to monitor the site weekly, after significant precipitation events and snow melt.
 +
|-
 +
| 2474579
 +
| Primary Facility
 +
| 2016-04-05
 +
| Routine/Partial Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection the well appeared to be drilled and equipped for production. The Operator appeared to have regraded portions of the site in preparation for restoration. Perimeter control appear to be in place
+
| At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition.  The well site appeared to be restored. See inspection #2474577 for additional observations made during 4/5/2016 inspection.
|  
+
|-
|  
+
| 2501015
|  
+
| Primary Facility
 +
| 2016-07-13
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production.  Well apparatus, brine tank and gas production unit appear to be in sound condition.  The well site appeared to be restored. See inspection #2501011 for additional observations made during 07/13/2016 inspection.
 +
|-
 +
| 2524228
 +
| Primary Facility
 +
| 2016-09-23
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition.  The well site appeared to be restored. See inspection #2524224 for additional observations made during the 9/23/2016 site inspection
 +
|-
 +
| 2564837
 +
| Primary Facility
 +
| 2017-02-24
 +
| Site Restoration
 +
| No Violations Noted
 +
| Well drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]
 +
[[Category:FracFocus]]

Latest revision as of 13:35, 16 May 2020

Well Details

Well ID: 37-129-28687
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 145081
Farm/Lease Name: PLASSIO UNIT 6H
License Status:
Spud Date:
Permit Date: 2011-10-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.266142
Longitude: -79.751175

For data sources see[1][2][3]

Well History

Date Event
2011-10-12 New Permit Application
2012-06-08 Performed Spud Operation
2013-03-22 New Permit Application
2013-05-12 Drilling Completion
2013-07-23 Perforation
2016-06-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-23 2013-08-01 8,043 5,618,950

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC 6116a Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.01527 0
1, 1-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00763 0
Dibromoacetonitrile 3252-43-5 5 0.00127 0
Unislik ST 50 CESI Friction Reducer Hydrotreated Light Distillite 64742-47-8 30 0.03255 0
ASP 900 Nalco Friction Reducer Ammonium Sulfate 7783-20-2 30
15% Hcl Acid Reagent/PPG Used to open perfs Hydrochloric Acid 7647-01-0 15 0.0976 0
Proppant Chevron Applachia, LLC Proppant Crystalline Silica 14808-60-7 100 8.78 0
CMHPG Ashland Water Viscosifier Carboxymethyl Hydroxporoyl Guar Blend 68130-15-4 100 0.00201 0
GBL Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00003000 0
Clean Volume Chevron Applachia, LLC Carrier/Base Fluid H20 7732-18-5 100 91.22 0
Iron Control A Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00711 0
Scale Inhibitor A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00755 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 257,708.00 34 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 1,075,733.00 365 0.00 0 90.00 184
2015 CHEVRON APPALACHIA LLC 671,823.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 510,971.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 398,875.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 353,605.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 256,370.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHEVRON APPALACHIA LLC Drill Cuttings 13.77 Tons LANDFILL 100419
2012 CHEVRON APPALACHIA LLC Drilling Fluid Waste 5,840.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drill Cuttings 1,249.57 Tons LANDFILL 100592
2013 CHEVRON APPALACHIA LLC Produced Fluid 1,195.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,012.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Produced Fluid 175.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Fracing Fluid Waste 7,033.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 1,455.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013 CHEVRON APPALACHIA LLC Drilling Fluid Waste 6,490.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 36.21 Tons LANDFILL 100592
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 6,797.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 23.72 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 14.92 Tons LANDFILL 100663
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 3.94 Tons LANDFILL 100172
2014 CHEVRON APPALACHIA LLC Produced Fluid 90.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014 CHEVRON APPALACHIA LLC Fracing Fluid Waste 39,369.66 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Produced Fluid 4,830.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 25.62 Tons LANDFILL 100280
2014 CHEVRON APPALACHIA LLC Fracturing Fluid Waste 7.85 Tons RESIDUAL WASTE TRANSFER FACILITY MID074259565
2015 CHEVRON APPALACHIA LLC Produced Fluid 1,014.99 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHEVRON APPALACHIA LLC Produced Fluid 337.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016 CHEVRON APPALACHIA LLC Produced Fluid 467.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHEVRON APPALACHIA LLC Produced Fluid 186.67 Bbl REUSE (AT WELL PAD)
2017 CHEVRON APPALACHIA LLC Produced Fluid 1,582.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017 CHEVRON APPALACHIA LLC Produced Fluid 146.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017 CHEVRON APPALACHIA LLC Produced Fluid 33.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 CHEVRON APPALACHIA LLC Drilling Fluid Waste 35.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018 CHEVRON APPALACHIA LLC Produced Fluid 98.33 Bbl REUSE (AT WELL PAD)
2018 CHEVRON APPALACHIA LLC Produced Fluid 414.34 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 CHEVRON APPALACHIA LLC Produced Fluid 383.33 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2054138 Primary Facility 2012-03-26 Routine/Complete Inspection No Violations Noted No E&S issues noted.
2057905 Primary Facility 2012-04-10 Routine/Complete Inspection No Violations Noted
2075061 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2077507 Primary Facility 2012-06-08 Drilling/Alteration No Violations Noted Horizontal Marcellus, not spudded yet.
2082206 Primary Facility 2012-07-11 Routine/Complete Inspection No Violations Noted Impoundment and water truck inspection. No issues noted.
2123134 Primary Facility 2012-11-09 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2123138 Primary Facility 2012-11-07 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2188806 Primary Facility 2013-08-02 Routine/Complete Inspection No Violations Noted Please refer to inspection # 218802 for observations made at the Plassio Unit on 8/2/2013.
2210850 Primary Facility 2013-09-20 Routine/Partial Inspection In Compliance with Policy Multi-well pad. On-site inspection of drill pit closest to access road. At time of inspection, pit liner had previously been removed with top perimeter of backfilled liner remaining. Pit not backfilled. Surrounded by orange security fence.
2210859 Primary Facility 2013-09-26 Routine/Partial Inspection In Compliance with Policy Multi-well pad. On-site inspection of drill pit closest to access road.
2244607 Primary Facility 2014-02-12 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The flow back pit located onsite appeared to be in sound condition with the 2' of freeboard.
2272140 Primary Facility 2014-05-20 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The brine tanks and well apparatus appear to be in sound condition. The Operator was in the process of removing the pit liner of pit #2. NO observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2339166 Primary Facility 2015-01-28 Routine/Partial Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The Operator appeared to have regraded portions of the site in preparation for restoration. Perimeter control appear to be in place, however the Department cannot verify vegetative growth due to snow cover. The Department suggests the Operator continue to monitor the site weekly, after significant precipitation events and snow melt.
2474579 Primary Facility 2016-04-05 Routine/Partial Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2474577 for additional observations made during 4/5/2016 inspection.
2501015 Primary Facility 2016-07-13 Routine/Partial Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2501011 for additional observations made during 07/13/2016 inspection.
2524228 Primary Facility 2016-09-23 Routine/Partial Inspection No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition. The well site appeared to be restored. See inspection #2524224 for additional observations made during the 9/23/2016 site inspection
2564837 Primary Facility 2017-02-24 Site Restoration No Violations Noted Well drilled and equipped for production. Well apparatus, brine tank and gas production unit appear to be in sound condition.

For data sources see[8]

References