37-129-28745

Well Details

Well ID: 37-129-28745
Loading map...
County: Westmoreland
Municipality: Sewickley Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 148223
Farm/Lease Name: DERMOTTA UNIT 4H
First Permit Date: 2012-02-08
Last Permit Date: 2012-02-08
Spud Date: 2012-02-22
Unconventional: Yes
Horizontal: Yes
Well Status: ACTIVE
Violations: 0
Latitude: 40.275722
Longitude: -79.765016

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 163885.0 61.0 0.0 0.0 0.0 0.0
2013-2 453393.0 184.0 0.0 0.0 0.0 0.0
2014-1 303127.0 181.0 0.0 0.0 0.0 0.0
2014-2 253314.0 184.0 0.0 0.0 0.0 0.0
2015-02 31696.0 28.0 0.0 0.0 0.0 0.0
2015-01 36747.0 31.0 0.0 0.0 0.0 0.0
2015-03 35653.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-1 DRILLING FLUID WASTE 130.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2012-1 DRILLING FLUID WASTE 3.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 DRILL CUTTINGS 893.3 Tons LANDFILL 100419 ADVANCED DISPOSAL SERVICE CHESTNUT VALLEY LANDFILL MCCLELLANDTOWN PA
2012-2 DRILLING FLUID WASTE 440.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2012-2 FRACING FLUID WASTE 20.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-1 FLOWBACK FRACTURING SAND 13.41 Tons LANDFILL 100592 SOUTH HILLS LANDFILL SOUTH HILLS PA
2013-1 FRACING FLUID WASTE 911.8 Bbl REUSE OTHER THAN ROAD SPREADING REUSE FOR DRILLING OR PLUGGING
2013-2 FLOWBACK FRACTURING SAND 11.81 Tons LANDFILL 073 114 654 US ECOLOGY IDAHO, INC. GRAND VIEW ID
2013-2 FRACING FLUID WASTE 34.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 FRACING FLUID WASTE 1.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001 RONCO WASTE PROCESSING FACILITY MASONTOWN PA
2013-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-1 FLOWBACK FRACTURING SAND 66.59 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565 US ECOLOGY DETROIT MI
2014-1 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2014-2 FLOWBACK FRACTURING SAND 16.44 Tons LANDFILL 100172 ARDEN LANDFILL WASHINGTON PA
2014-2 PRODUCED FLUID 1.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2044645 2012-02-23 No Violations Noted 2/13/12 Spud inspection. No violations.
2047962 2012-02-22 No Violations Noted Horizontal Marcellus, setting conductor and cellar
2061689 2012-04-09 No Violations Noted
2068989 2012-05-15 No Violations Noted 5/15/2012 Yost rig moving off of pad.
2070093 2012-05-22 No Violations Noted 5/22/2012 Patterson rig rigging up on pad.
2077519 2012-06-08 No Violations Noted 6/8/2012 Patterson drilling on at depth of 7869'
2138411 2013-02-12 No Violations Noted Routine inspection. ROAD DUST ISSUE.
2170269 2013-05-30 No Violations Noted At the time of inspection the well appeared to be drilled and equipped for production. The well apparatus and brine tanks located on site appear to be sound condition. The erosion and sedimentation plan was located onsite and appears to be implemented as designed. The Associate BMPS appear to be properly installed and maintained. No accelerated erosion and sedimentation observed in relation to the access road or well pad area at the time of inspection. The pit located onsite appears to be in sound condition and had the required 2' of freeboard. The Department suggests the operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2358392 2015-04-06 No Violations Noted Inspection in response to a Well Site Restoration Report file by the Operator on 10-28-2015. At the time of inspection all earth disturbance activities