X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28831"

m (Wiki moved page 129-28831 to 42-129-28831)
m
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 129-28831
+
| Well ID: 37-129-28831
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.127413, -79.384322 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.127414, -79.384322 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Westmoreland County, Pennsylvania|Westmoreland]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[Donegal Township, Westmoreland County, Pennsylvania|Donegal Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[WPX ENERGY APPALACHIA LLC|WPX ENERGY APPALACHIA LLC]]
+
| County: [[Westmoreland_County,_Pennsylvania|Westmoreland]]
 
|-
 
|-
| First Permit Date: 2013-01-04
+
| Municipality: [[Donegal Township,_Westmoreland_County,_Pennsylvania|Donegal Township]]
 
|-
 
|-
| Last Permit Date: 2013-01-04
+
| Operator Name: [[XPR RESOURCES LLC]]
 
|-
 
|-
| Spud Date: None
+
| Well Pad ID:  
 
|-
 
|-
| Unconventional: Yes
+
| Farm/Lease Name: BRADY 1-10H
 
|-
 
|-
| Horizontal: Yes
+
| License Status:  
 
|-
 
|-
| Violations: None
+
| Spud Date:  
 
|-
 
|-
| Latitude: 40.127413
+
| Permit Date: 2013-01-04
 +
|-
 +
| Well Type: GAS
 +
|-
 +
| Unconventional Well: Y
 +
|-
 +
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 +
|-
 +
| Latitude: 40.127414
 
|-
 
|-
 
| Longitude: -79.384322
 
| Longitude: -79.384322
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2013-01-04
 +
| New Permit Application
 
|-
 
|-
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
|}-->
 +
 
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
|}-->
 +
 
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2438632
 +
| Primary Facility
 +
| 2015-12-03
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX started the process of plugging Brady 1-2H well.  Casing and tubing had 50 psi.  Pressure was bleed off.  35 bbl. of production water was pumped into tubing.  BOP was tested to 2500 psi.  Renegade wireline was set to depth of 7500 feet.  On December 3, 2015, WPX pumped cement plug form 7500 ft. to 2700 feet by setting 1000 ft. intervals.  The plug was set by using 113 bbl. with 485 sacks of 15.2 # Class A cement (1.25 yields
 +
|-
 +
| 2438732
 +
| Primary Facility
 +
| 2015-12-07
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX completed the process of plugging Brady 1-2H well.  On December 4, 2015 WPX cleared hole to 2700 feet.  Cut 5.5 inch casing to 2690 feet.  Ran 2 3/8 inch tubing to 2700 feet.  Pumped 54 bbls comprised of 243 sacks of 15.2 # Class A cement (1.25 yields).  Plug was set at 2700 feet to 2000 feet.  On December 7, 2015, WPX set final cement plug at 1950 to surface using 700sacks (153.5 bbl.) of class A 1.25 yield.
 +
|-
 +
| 2438807
 +
| Primary Facility
 +
| 2015-12-11
 +
| Plugging(Includes Plugged/Mined Through)
 +
| No Violations Noted
 +
| WPX started the process of plugging Brady 1-4H well.  WPX set cement tubing at 7510 feet.  C&J cementers cemented 5.5” casing from 7510 feet to 2100 feet using 122 bbl. comprised of 550 sacks of 15.2 # 1.25 Class A cement.  Cement was pumped in plug intervals of 1000 feet and laying down tubing between plugs.  On 12/10/15, Casing was cut at 2070 feet.  C&J cement set cement plug from 2070 feet to 1780 feet using 22.5 bbl. with 100 sacks of Class A.  On 12/11/15, C&J cementing set a plug from 1789 feet to surface with 140 bbl. using 630 sacks of Class A.
 +
|-
 +
| 2526037
 +
| Primary Facility
 +
| 2016-10-05
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Well not drilled. See inspection #2525926 for additional observations made during the10/5/2016 site inspection.
 +
|-
 +
| 2530417
 +
| Primary Facility
 +
| 2016-10-20
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| Well not drilled. See inspection # 2530397 for additional observations made during the10/20/2016 site inspection.
 +
|-
 
|}
 
|}
== Production Data ==
+
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Inspection ID
!scope="col" | GAS QUANTITY
+
!scope="col" | Violation ID
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Violation Date
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Date Resolved
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Violation Code
!scope="col" | OIL QUANTITY
+
!scope="col" | Violation Type
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Violation Comments
|}
+
|-
== Waste Data ==
+
|}-->
 +
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Violation ID
!scope="col" | TYPE
+
!scope="col" | Penalty ID
!scope="col" | QUANTITY
+
!scope="col" | Penalty Code
!scope="col" | UNITS
+
!scope="col" | Penalty Status
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Penalty Date
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Enforcement Date
!scope="col" | WASTE FACILITY NAME
+
!scope="col" | Penalty Amount
!scope="col" | FACILITY CITY
+
!scope="col" | Amount Collected
!scope="col" | FACILITY STATE
+
|-
|}
+
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 13:52, 16 May 2020

Well Details

Well ID: 37-129-28831
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Donegal Township
Operator Name: XPR RESOURCES LLC
Well Pad ID:
Farm/Lease Name: BRADY 1-10H
License Status:
Spud Date:
Permit Date: 2013-01-04
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.127414
Longitude: -79.384322

For data sources see[1][2][3]

Well History

Date Event
2013-01-04 New Permit Application

For data sources see[4]



Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2438632 Primary Facility 2015-12-03 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-2H well. Casing and tubing had 50 psi. Pressure was bleed off. 35 bbl. of production water was pumped into tubing. BOP was tested to 2500 psi. Renegade wireline was set to depth of 7500 feet. On December 3, 2015, WPX pumped cement plug form 7500 ft. to 2700 feet by setting 1000 ft. intervals. The plug was set by using 113 bbl. with 485 sacks of 15.2 # Class A cement (1.25 yields
2438732 Primary Facility 2015-12-07 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX completed the process of plugging Brady 1-2H well. On December 4, 2015 WPX cleared hole to 2700 feet. Cut 5.5 inch casing to 2690 feet. Ran 2 3/8 inch tubing to 2700 feet. Pumped 54 bbls comprised of 243 sacks of 15.2 # Class A cement (1.25 yields). Plug was set at 2700 feet to 2000 feet. On December 7, 2015, WPX set final cement plug at 1950 to surface using 700sacks (153.5 bbl.) of class A 1.25 yield.
2438807 Primary Facility 2015-12-11 Plugging(Includes Plugged/Mined Through) No Violations Noted WPX started the process of plugging Brady 1-4H well. WPX set cement tubing at 7510 feet. C&J cementers cemented 5.5” casing from 7510 feet to 2100 feet using 122 bbl. comprised of 550 sacks of 15.2 # 1.25 Class A cement. Cement was pumped in plug intervals of 1000 feet and laying down tubing between plugs. On 12/10/15, Casing was cut at 2070 feet. C&J cement set cement plug from 2070 feet to 1780 feet using 22.5 bbl. with 100 sacks of Class A. On 12/11/15, C&J cementing set a plug from 1789 feet to surface with 140 bbl. using 630 sacks of Class A.
2526037 Primary Facility 2016-10-05 Routine/Partial Inspection No Violations Noted Well not drilled. See inspection #2525926 for additional observations made during the10/5/2016 site inspection.
2530417 Primary Facility 2016-10-20 Routine/Partial Inspection No Violations Noted Well not drilled. See inspection # 2530397 for additional observations made during the10/20/2016 site inspection.

For data sources see[5]

References