X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28863"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28863
 
| Well ID: 37-129-28863
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.196853, -79.748311 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.196853, -79.748311 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 06/06/2014
+
| Spud Date: 2014-06-06
 
|-
 
|-
| Permit Date: 10/18/2013
+
| Permit Date: 2013-10-18
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2015-03-13
 +
| 2015-03-19
 +
| style="text-align: right;" | 8034
 +
| style="text-align: right;" | 6,338,600.0
 +
| style="text-align: right;" |
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="18"| 1
 +
| rowspan="1"| EC6673W
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Iron Control
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00073816
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| EC6486A
 +
| rowspan="1"| Nalco
 +
| rowspan="1"| Scale Inhibitor
 +
| Ethylene Glycol
 +
| 107-21-1
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00079749
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="4"| A264
 +
| rowspan="4"| Schlumberger
 +
| rowspan="4"| Corrosion Inhibitor
 +
| Prop-2-yn-1-ol
 +
| 107-19-7
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00001027
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic acids
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00003081
 +
| style="text-align: right;" | 0
 +
|-
 +
| Aliphatic alcohols, ethoxylayed #1
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00003081
 +
| style="text-align: right;" | 0
 +
|-
 +
| Methanol
 +
| 67-56-1
 +
| style="text-align: right;" | 40
 +
| style="text-align: right;" | 0.00004108
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| B466
 +
| rowspan="3"| Schlumberger
 +
| rowspan="3"| Friction Reducer
 +
| Alcohol Ethoxylates
 +
| Proprietary
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00056641
 +
| style="text-align: right;" | 0
 +
|-
 +
| Ammonium Acetate
 +
| 631-61-8
 +
| style="text-align: right;" | 6
 +
| style="text-align: right;" | 0.00067969
 +
| style="text-align: right;" | 0
 +
|-
 +
| Distillates (petroleum), hydrotreated light
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00339845
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="3"| EC6116A
 +
| rowspan="3"| Nalco
 +
| rowspan="3"| Biocide
 +
| Dibromoacetonitrile
 +
| 3252-43-5
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00012332
 +
| style="text-align: right;" | 0
 +
|-
 +
| Polyethylene Glycol
 +
| 25322-68-3
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.00147988
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2,2-Dibromo-3-nitrilopropionamide
 +
| 10222-01-2
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00073994
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Proppant
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Proppant
 +
| Crystalline Silica
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 10.5004
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| J580
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gelling Agent, Water
 +
| Carbohydrate Polymer
 +
| Proprietary
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.0244586
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| J134
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Gel Breaker
 +
| Hemicellulase enzyme
 +
| 9012-54-8
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00111917
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| L058
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Iron Stabilizer
 +
| Sodium erythorbate
 +
| 6381-77-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.00033625
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| 15% Acid
 +
| rowspan="1"| Schlumberger
 +
| rowspan="1"| Perf Cleanup
 +
| Hydrocloric Acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.00932754
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Base Fluid
 +
| rowspan="1"| Chevron
 +
| rowspan="1"| Carrier/Base Fluid
 +
| Water (Including Mix Water Supplied by Client)
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 89.337
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 496: Line 685:
 
| 2275497
 
| 2275497
 
| Primary Facility
 
| Primary Facility
| 06/02/2014
+
| 2014-06-02
 
| Preoperation Inspection
 
| Preoperation Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 503: Line 692:
 
| 2275807
 
| 2275807
 
| Primary Facility
 
| Primary Facility
| 06/03/2014
+
| 2014-06-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 510: Line 699:
 
| 2283290
 
| 2283290
 
| Primary Facility
 
| Primary Facility
| 06/17/2014
+
| 2014-06-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 517: Line 706:
 
| 2286171
 
| 2286171
 
| Primary Facility
 
| Primary Facility
| 06/30/2014
+
| 2014-06-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 524: Line 713:
 
| 2290745
 
| 2290745
 
| Primary Facility
 
| Primary Facility
| 07/08/2014
+
| 2014-07-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 531: Line 720:
 
| 2290753
 
| 2290753
 
| Primary Facility
 
| Primary Facility
| 07/18/2014
+
| 2014-07-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 538: Line 727:
 
| 2292321
 
| 2292321
 
| Primary Facility
 
| Primary Facility
| 08/04/2014
+
| 2014-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 545: Line 734:
 
| 2293952
 
| 2293952
 
| Primary Facility
 
| Primary Facility
| 07/24/2014
+
| 2014-07-24
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 552: Line 741:
 
| 2304231
 
| 2304231
 
| Primary Facility
 
| Primary Facility
| 08/05/2014
+
| 2014-08-05
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 559: Line 748:
 
| 2304253
 
| 2304253
 
| Primary Facility
 
| Primary Facility
| 08/08/2014
+
| 2014-08-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 566: Line 755:
 
| 2304257
 
| 2304257
 
| Primary Facility
 
| Primary Facility
| 09/03/2014
+
| 2014-09-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 573: Line 762:
 
| 2304750
 
| 2304750
 
| Primary Facility
 
| Primary Facility
| 09/18/2014
+
| 2014-09-18
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 580: Line 769:
 
| 2305464
 
| 2305464
 
| Primary Facility
 
| Primary Facility
| 09/22/2014
+
| 2014-09-22
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 587: Line 776:
 
| 2306194
 
| 2306194
 
| Primary Facility
 
| Primary Facility
| 09/23/2014
+
| 2014-09-23
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 594: Line 783:
 
| 2320597
 
| 2320597
 
| Primary Facility
 
| Primary Facility
| 10/05/2014
+
| 2014-10-05
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 601: Line 790:
 
| 2328059
 
| 2328059
 
| Primary Facility
 
| Primary Facility
| 12/04/2014
+
| 2014-12-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 608: Line 797:
 
| 2340797
 
| 2340797
 
| Primary Facility
 
| Primary Facility
| 01/27/2015
+
| 2015-01-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 615: Line 804:
 
| 2340806
 
| 2340806
 
| Primary Facility
 
| Primary Facility
| 02/03/2015
+
| 2015-02-03
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 622: Line 811:
 
| 2362707
 
| 2362707
 
| Primary Facility
 
| Primary Facility
| 04/20/2015
+
| 2015-04-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 741: Line 930:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 03/13/2015
 
| 03/19/2015
 
| style="text-align: right;" | 8034
 
| style="text-align: right;" | 6,338,600.0
 
| style="text-align: right;" |
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="18"| 1
 
| rowspan="1"| EC6673W
 
| rowspan="1"| Nalco
 
| rowspan="1"| Iron Control
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00073816
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| EC6486A
 
| rowspan="1"| Nalco
 
| rowspan="1"| Scale Inhibitor
 
| Ethylene Glycol
 
| 107-21-1
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00079749
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="4"| A264
 
| rowspan="4"| Schlumberger
 
| rowspan="4"| Corrosion Inhibitor
 
| Prop-2-yn-1-ol
 
| 107-19-7
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 0.00001027
 
| style="text-align: right;" | 0
 
|-
 
| Aliphatic acids
 
| Proprietary
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00003081
 
| style="text-align: right;" | 0
 
|-
 
| Aliphatic alcohols, ethoxylayed #1
 
| Proprietary
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00003081
 
| style="text-align: right;" | 0
 
|-
 
| Methanol
 
| 67-56-1
 
| style="text-align: right;" | 40
 
| style="text-align: right;" | 0.00004108
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="3"| B466
 
| rowspan="3"| Schlumberger
 
| rowspan="3"| Friction Reducer
 
| Alcohol Ethoxylates
 
| Proprietary
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.00056641
 
| style="text-align: right;" | 0
 
|-
 
| Ammonium Acetate
 
| 631-61-8
 
| style="text-align: right;" | 6
 
| style="text-align: right;" | 0.00067969
 
| style="text-align: right;" | 0
 
|-
 
| Distillates (petroleum), hydrotreated light
 
| 64742-47-8
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00339845
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="3"| EC6116A
 
| rowspan="3"| Nalco
 
| rowspan="3"| Biocide
 
| Dibromoacetonitrile
 
| 3252-43-5
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.00012332
 
| style="text-align: right;" | 0
 
|-
 
| Polyethylene Glycol
 
| 25322-68-3
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.00147988
 
| style="text-align: right;" | 0
 
|-
 
| 2,2-Dibromo-3-nitrilopropionamide
 
| 10222-01-2
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00073994
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| Proppant
 
| rowspan="1"| Schlumberger
 
| rowspan="1"| Proppant
 
| Crystalline Silica
 
| 14808-60-7
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 10.5004
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| J580
 
| rowspan="1"| Schlumberger
 
| rowspan="1"| Gelling Agent, Water
 
| Carbohydrate Polymer
 
| Proprietary
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.0244586
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| J134
 
| rowspan="1"| Schlumberger
 
| rowspan="1"| Gel Breaker
 
| Hemicellulase enzyme
 
| 9012-54-8
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.00111917
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| L058
 
| rowspan="1"| Schlumberger
 
| rowspan="1"| Iron Stabilizer
 
| Sodium erythorbate
 
| 6381-77-7
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.00033625
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| 15% Acid
 
| rowspan="1"| Schlumberger
 
| rowspan="1"| Perf Cleanup
 
| Hydrocloric Acid
 
| 7647-01-0
 
| style="text-align: right;" | 15
 
| style="text-align: right;" | 0.00932754
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| Base Fluid
 
| rowspan="1"| Chevron
 
| rowspan="1"| Carrier/Base Fluid
 
| Water (Including Mix Water Supplied by Client)
 
| 7732-18-5
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 89.337
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 14:40, 1 August 2019

Well Details

Well ID: 37-129-28863
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: South Huntingdon Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 144564
Farm/Lease Name: BONDI UNIT 4H
License Status: Active
Spud Date: 2014-06-06
Permit Date: 2013-10-18
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.196853
Longitude: -79.748311

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-03-13 2015-03-19 8034 6,338,600.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00073816 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00079749 0
A264 Schlumberger Corrosion Inhibitor Prop-2-yn-1-ol 107-19-7 10 0.00001027 0
Aliphatic acids Proprietary 30 0.00003081 0
Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00003081 0
Methanol 67-56-1 40 0.00004108 0
B466 Schlumberger Friction Reducer Alcohol Ethoxylates Proprietary 5 0.00056641 0
Ammonium Acetate 631-61-8 6 0.00067969 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00339845 0
EC6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5 0.00012332 0
Polyethylene Glycol 25322-68-3 60 0.00147988 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.00073994 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 10.5004 0
J580 Schlumberger Gelling Agent, Water Carbohydrate Polymer Proprietary 100 0.0244586 0
J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00111917 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00033625 0
15% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 15 0.00932754 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 89.337 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 966,068.00 205 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 1,102,179.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 801,118.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 626,193.00 365 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 130,576.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2014-S01 Drilling Fluid Waste (in Barrels) 2.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-S02 Drill Cuttings (in Tons) 235.11 Tons LANDFILL 100172
2014-S02 Drill Cuttings (in Tons) 64.50 Tons LANDFILL 100592
2014-S02 Drill Cuttings (in Tons) 813.85 Tons LANDFILL 100663
2014-S02 Drilling Fluid Waste (in Barrels) 390.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracing Fluid Waste (in Barrels) 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S01 Fracing Fluid Waste (in Barrels) 2,474.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S01 Fracturing Fluid Waste (in Tons) 10.72 Tons LANDFILL 100172
2015-S01 Fracturing Fluid Waste (in Tons) 13.53 Tons LANDFILL 100592
2015-S01 Produced Fluid (in Barrels) 75.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Drilling Fluid Waste (in Barrels) 17.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Fracing Fluid Waste (in Barrels) 737.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Fracing Fluid Waste (in Barrels) 5,470.25 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Fracturing Fluid Waste (in Tons) 0.63 Tons LANDFILL 100592
2015-S02 Produced Fluid (in Barrels) 12.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Produced Fluid (in Barrels) 4,245.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 1,723.75 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.03 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2016-S01 Waste Water Treatment Sludge (in Tons) RWC 804 4.81 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2016-S02 Produced Fluid (in Barrels) RWC 802 935.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 166.26 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 169.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M02 Produced Fluid (in Barrels) RWC 802 146.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 58.57 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 82.50 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M04 Produced Fluid (in Barrels) RWC 802 27.50 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 3,465.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M06 Drilling Fluid Waste (in Barrels) RWC 803 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 57.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M07 Produced Fluid (in Barrels) RWC 802 26.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M07 Produced Fluid (in Barrels) RWC 802 28.00 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 25.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M08 Produced Fluid (in Barrels) RWC 802 28.75 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 28.75 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 56.25 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 28.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M11 Produced Fluid (in Barrels) RWC 802 56.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M12 Produced Fluid (in Barrels) RWC 802 56.25 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M01 Produced Fluid (in Barrels) RWC 802 56.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2018-M01 Produced Fluid (in Barrels) RWC 802 83.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 28.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M03 Produced Fluid (in Barrels) RWC 802 27.50 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M04 Produced Fluid (in Barrels) RWC 802 56.25 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 84.75 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 55.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 28.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M08 Produced Fluid (in Barrels) RWC 802 52.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M09 Produced Fluid (in Barrels) RWC 802 72.50 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Produced Fluid (in Barrels) RWC 802 28.50 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 28.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M12 Produced Fluid (in Barrels) RWC 802 56.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Produced Fluid (in Barrels) RWC 802 27.50 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 30.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 87.50 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2275497 Primary Facility 2014-06-02 Preoperation Inspection No Violations Noted Pre-drill inspection at the request of the Operator. This inspection fulfills the requirements set forth by Act 13 Section 32.58. At the time of inspection perimeter E&S controls appear to be in sound condition. The Department notes that the site appears to be constructed as outlined in the ESCGP. No observation of accelerated erosion or sedimentation in relation to the access road or well pad area. The Department suggest that the Operator continue to monitor the site weekly and after significant precipitation events to ensure that the well pad and access road remain in stable condition.
2275807 Primary Facility 2014-06-03 Drilling/Alteration No Violations Noted Horizontal Marcellus
2283290 Primary Facility 2014-06-17 Drilling/Alteration No Violations Noted 6/17/2014 rig moved off of pad.
2286171 Primary Facility 2014-06-30 Drilling/Alteration No Violations Noted 6/30/2014 waiting on rig to drill top hole.
2290745 Primary Facility 2014-07-08 Drilling/Alteration No Violations Noted 7/8/2014 Yost 5 drilling on the 1H.
2290753 Primary Facility 2014-07-18 Drilling/Alteration No Violations Noted 7/18/2014 Yost 5 drilling on the 3H.
2292321 Primary Facility 2014-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was actively drilling. The depth of drilling at the time of inspection was 1100'. The drill rig was placed on containment. The well site appeared to be in stable condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2293952 Primary Facility 2014-07-24 Drilling/Alteration No Violations Noted 7/24/2014 Yost 5 drilling @ depth of 590'.
2304231 Primary Facility 2014-08-05 Drilling/Alteration No Violations Noted 8/5/2014 Nabors finished drilling intermediate portion of bore. They will be running 95/8csg. this evening.
2304253 Primary Facility 2014-08-08 Drilling/Alteration No Violations Noted 8/8/2014 Nabors X8 drilling at depth of 5580'.
2304257 Primary Facility 2014-09-03 Drilling/Alteration No Violations Noted 9/3/2014 Drilling on 1H
2304750 Primary Facility 2014-09-18 Drilling/Alteration No Violations Noted 9/18/2014 Nabors rig X8 drilling on Bondi 2H.
2305464 Primary Facility 2014-09-22 Drilling/Alteration No Violations Noted 9/22/2014 Nabors rig X8 drilling on Bondi 2H.
2306194 Primary Facility 2014-09-23 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated the well was drilled to total depth. The drill rig was onsite and placed on containment. The well site appeared to be in stable condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2320597 Primary Facility 2014-10-05 Drilling/Alteration No Violations Noted 11/5/2014 Waiting to be stimulated
2328059 Primary Facility 2014-12-04 Drilling/Alteration No Violations Noted 12/4/2014 Waiting to be stimulated
2340797 Primary Facility 2015-01-27 Drilling/Alteration No Violations Noted 1/14/2015 Waiting to be stimulated
2340806 Primary Facility 2015-02-03 Drilling/Alteration No Violations Noted 2/3/2015 Waiting to be stimulated
2362707 Primary Facility 2015-04-20 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator appeared to be finished with stimulation, however the well was not equipped for production.
2439956 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted 1/12/2016 Produced fluids tanks diked and GPU's
2444594 Primary Facility 2016-01-28 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2470524 Primary Facility 2016-03-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2509127 Primary Facility 2016-08-08 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2509121 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2512609 Primary Facility 2016-08-22 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. Also see inspection # 2512597 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2516758 Primary Facility 2016-08-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. DEP personnel on site during inspection Donna Davis and Sam Steingrabe and Also see inspection # 2516752 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2534622 Primary Facility 2016-10-31 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. See inspection # 253614 for additional observation related to the ESCGP. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2568877 Primary Facility 2017-03-07 Routine/Complete Inspection No Violations Noted At the time of inspection well was drilled. The well apparatus in brine tank to be in sound condition. No observation of accelerated erosion or sedimentation on the well pad or access road.
2585576 Primary Facility 2017-04-18 Complaint Inspection No Violations Noted Inspection conducted in response to complaint (CTS ID 326330). At the time of inspection, well pad site gated and locked. No evidence of a spill and/or earth disturbance relating to a spill. Brine tank appears to be structurally sound, within secondary containment. No visible sheen indicating a spill within secondary containment.
2629655 Primary Facility 2017-08-28 Site Restoration No Violations Noted Well drilled snd equipped for production. Well apparatus, brine tank and gas production unit appeared to be in sound condition. Also see inspection report #2629651 for additional observations related to the well site.
2809082 Primary Facility 2018-11-30 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Two brine tanks within earthen dike and appears structurally sound. No E&S issues.
2845563 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[7]

References