If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22008 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.46,"lon":-81.06,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Middlefield Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: CARDINAL LOCAL SCHOOL DISTRICT | |
License Status: Producing | |
License Date: 2007-12-11 | |
Spud Date: 2008-02-01 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2008-02-07 | |
Well Total Depth: 4118.00 ft | |
Configuration: Vertical | |
Latitude: 41.460000 | |
Longitude: -81.060000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-12-11 | Proposed Formations:CLINTON, Issued Date:12/11/2007, Expired Date:12/10/2008 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-02-07 | |
Completion Report Received | 2008-04-28 | |
Construction Permit Expires | 2008-12-10 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-08-25 | 3906 | 3972 | 131 |
3906 | 3972 | 131 | |
3906 | 3972 | 131 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 76050 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DAVID R HILL INC | 20154.00 | 305.00 | 183 |
2009 | DAVID R HILL INC | 18016.00 | 256.00 | 365 |
2010 | DAVID R HILL INC | 12005.00 | 135.00 | 365 |
2011 | DAVID R HILL INC | 8570.00 | 105.00 | 365 |
2012 | DAVID R HILL INC | 7430.00 | 131.00 | 366 |
2013 | DAVID R HILL INC | 5926.00 | 100.00 | 365 |
2014 | DAVID R HILL INC | 4997.00 | 114.00 | 365 |
2015 | DAVID R HILL INC | 4372.00 | 95.00 | 365 |
2016 | DAVID R HILL INC | 4119.00 | 51.00 | 365 |
2017 | DAVID R HILL INC | 2892.00 | 91.00 | 365 |
2018 | DAVID R HILL INC | 4113.00 | 71.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | DAVID R HILL INC | Brine | 558 | 183 |
2009 | DAVID R HILL INC | Brine | 441 | 365 |
2010 | DAVID R HILL INC | Brine | 249 | 365 |
2011 | DAVID R HILL INC | Brine | 121 | 365 |
2012 | DAVID R HILL INC | Brine | 95 | 366 |
2013 | DAVID R HILL INC | Brine | 130 | 365 |
2014 | DAVID R HILL INC | Brine | 150 | 365 |
2015 | DAVID R HILL INC | Brine | 97 | 365 |
2016 | DAVID R HILL INC | Brine | 57 | 365 |
2017 | DAVID R HILL INC | Brine | 21 | 365 |
2018 | DAVID R HILL INC | Brine | 58 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1803059611 | 2008-2-1 0:00:0 | DD | No Violations | |
-2122083426 | 2008-7-31 0:00: | PL | No Violations | |
-986567239 | 2017-12-13 0:00 | PW | No Violations | |
0259865204 | 2008-02-06 | Drill / Deepen / Reopen | No Violations | Drainage contained NE corner of the site. Operator has also been pumping drainage into frac tank on location. Area has received more than 3 inches of rain in the past 24 hours. Pits are in good repair. East side of blow pit, liner had slumped, operator repaired before inspection. Pit liner is staked at this time. Drill depth 3815. 3522 operator changed over to fluid do to the Newburg gas. Lease road is stable. Safety fence is up. |
0819401266 | 2010-12-20 | UrbanProduction Wells | No Violations | Snow on site was 2 feet in depth. Man door on the tank battery needs repaired. Hasp on the door is lose, door can be pushed opened and closed with lock in place. Fencing is short. Fence need barbed wire installed on top of fencing. Letter will be sent to David R INC. |
0986567239 | 2017-12-13 | Production Wells | No Violations | During this inspection, the well was equipped with a plunger lift assembly and the annulus and flow line valves were open. The well was fenced and locked. Production records for this well were current. The tank battery consisted of one 140 BBL production tank, one 25 BBL poly brine tank and a mechanical separator. Valves on the separator were open and the chart showed production. The tank battery was diked and fenced with a locked man door. Legible signage was located at the tank battery and the lease access was stable. No violations observed. |
1413466542 | 2014-10-16 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The well and tank battery are in good repair and are surrounded by a chain link fence. The tank battery consists of a 100 BBL production tank, a 25 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery and the wellhead. The lease road is in stable condition. |
1437489098 | 2015-07-21 | Production Wells | No Violations | My inspection found the oil has been cleaned up inside the tank battery. After speaking with Gary McIntosh the well tender for the company, he has plans to replace the stone removed from the location. No other changes to the location since my last inspection. |
1564081653 | 2019-7-25 0:00: | UP | No Violations | |
1771528497 | 2015-06-12 | Production Wells | No Violations | My inspection found a 5 ft by 10 ft oil saturated stain inside the South West corner of the tank battery. The oil was recently hauled off of the production tank and the spill was caused when the truck driver removed his hose from the tank. I contacted Dave Hill the owner of the company and he was sending a crew out immediatley to clean up the oil saturated stone. He will contact me when the work is completed. |
1803059611 | 2008-02-01 | Drill / Deepen / Reopen | No Violations | Operator is actively digging pits. Bottom of pits is in shale. All precautions will need to be taken to prevent shale from cutting liners. Spoke to Spike regarding thin till. No ground water noted in the pits. Soil is dry. Operator will not need to cement conductor pipe. On joint of conductor will be driven in. Spoke to Rick Simmers regarding conductor, per Rick thin till conditions and less then one joint of conductor set, inspector can wave cementing. Safety fence is up around site. |
1956816671 | 2008-02-06 | Administrative Inspection | No Violations | Call from Spike, tool pusher Kilbarger Rig 11. Hit Newburg gas at 3522. Changing over to fluid drilling. Call from Don Cagier 02/12/08 Long string cement 92 above Lockport. Long string cemented 12/08/2008. |
2122083426 | 2008-07-31 | Preliminary Restoration | No Violations | Site has been graded and seeded. Vegetation is established. Tank battery and well head are fenced. Lease road is stable. |
259865204 | 2008-2-6 0:00:0 | DD | No Violations | |
819401266 | 2010-12-20 0:00 | UP | No Violations |
For data sources see[9]