X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-21979

Well Details

Well ID: 34-059-21979
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Cambridge Township
Operator Name: PETTA ENTERPRISES OF OHIO LLC
Well Pad ID:
Farm/Lease Name: AMETEK CORPORATION
License Status: Producing
License Date: 2010-03-02
Spud Date: 1976-10-02
Spud Drilling Contractor:
Final Drill Date: 1976-10-23
Well Total Depth: 4906.00 ft
Configuration: Vertical
Latitude: 40.030000
Longitude: -81.600000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1976-09-23 2838 ROSCOE GAS & OIL CO GeoDate 9/23/76
Oil and Gas 1976-09-23 Issued Date 9/23/76 Expired Date 9/23/77 Acres 0000000 Tool Type Proposed Formation Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1976-10-02
Completed 1976-10-23
Reached Total Depth 1976-10-23
Change of Owner 1999-03-19 Operator changed from 2838, ROSCOE GAS & OIL CO to 213, RANGE OPERATING COMPANY
Change of Owner 2000-06-27 Operator changed from 213, RANGE OPERATING COMPANY to 6674, GREAT LAKES ENERGY PTNSHP LLC
APP 2010-03-02 Proposed Formations:CLINTON, Issued Date:3/2/2010, Expired Date:3/2/2011 6:00:00 AM, Drilling unit acres:53.556, Proposed Well Type:OG, Proposed Well Class:
Change of Owner 2010-04-01 Operator changed from 6674, RANGE RESOURCES-APPALACHIA LLC to 5935, DOVER ATWOOD CORP.
Construction Permit Expires 2011-03-02
Change of Owner 2015-05-14 Operator changed from 5935, DOVER ATWOOD CORP. to 5567, BERRY ENTERPRISES INC
Change of Owner 2018-07-25 Operator changed from 5567, BERRY ENTERPRISES INC to 10068, A BERRY ENTERPRISES LLC
Change of Owner 2019-01-14 Operator changed from 10068, A BERRY ENTERPRISES LLC to 10302, PETTA ENTERPRISES OF OHIO LLC
Record Last Modified 2019-01-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4757 4797 22
4757 4797 22
4757 4797 22

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1425 Bbl 59000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 ROSCOE GAS & OIL CO 0.00 0.00 0
1988 ATWOOD RESOURCES INC 2485.00 202.00 365
1989 ROSCOE GAS & OIL CO 3235.00 149.00 365
1990 ROSCOE GAS & OIL CO 2641.00 0.00 365
1993 ATWOOD RESOURCES INC 1736.00 0.00 365
1995 TRANSFUEL RESOURCES CO 773.00 0.00 270
1996 RANGE OPERATING COMPANY 1170.00 72.00 335
1997 RANGE OPERATING COMPANY 1830.00 166.00 365
1998 RANGE OPERATING COMPANY 1961.00 56.00 365
1999 RANGE RESOURCES-APPALACHIA LLC 166.00 0.00 61
2000 RANGE RESOURCES-APPALACHIA LLC 1019.00 0.00 365
2001 RANGE RESOURCES-APPALACHIA LLC 246.00 0.00 120
2010 DOVER ATWOOD CORP. 0.00 0.00 365
2011 DOVER ATWOOD CORP. 0.00 0.00 0
2013 DOVER ATWOOD CORP. 0.00 0.00 0
2014 DOVER ATWOOD CORP. 0.00 0.00 0
2015 BERRY ENTERPRISES INC 0.00 0.00 0
2016 BERRY ENTERPRISES INC 0.00 0.00 20
2017 BERRY ENTERPRISES INC 302.00 10.00 30
2018 BERRY ENTERPRISES INC 0.00 0.00 30

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 ROSCOE GAS & OIL CO Brine 0 0
1988 ATWOOD RESOURCES INC Brine 0 365
1989 ROSCOE GAS & OIL CO Brine 70 365
1990 ROSCOE GAS & OIL CO Brine 185 365
1993 ATWOOD RESOURCES INC Brine 0 365
1995 TRANSFUEL RESOURCES CO Brine 0 270
1996 RANGE OPERATING COMPANY Brine 0 335
1997 RANGE OPERATING COMPANY Brine 0 365
1998 RANGE OPERATING COMPANY Brine 365
1999 RANGE OPERATING COMPANY Brine 0 273
2000 RANGE RESOURCES-APPALACHIA LLC Brine 0 365
2001 RANGE RESOURCES-APPALACHIA LLC Brine 0 120
2010 DOVER ATWOOD CORP. Brine 0 365
2011 DOVER ATWOOD CORP. Brine 0
2013 DOVER ATWOOD CORP. Brine 0 0
2014 DOVER ATWOOD CORP. Brine 0 0
2015 BERRY ENTERPRISES INC Brine 0 0
2016 BERRY ENTERPRISES INC Brine 0 20
2017 BERRY ENTERPRISES INC Brine 0 30
2018 BERRY ENTERPRISES INC Brine 0 30

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1044179457 2016-3-9 0:00:0 PW No Violations 1.50
-1238692922 2018-2-7 0:00:0 PW No Violations 1.00
-1309538804 2013-5-1 0:00:0 PW No Violations
-1409424915 2017-6-22 0:00: PW No Violations 1.00
-1452140164 2013-5-2 0:00:0 PW No Violations
-1544661708 2020-2-25 0:00: PW No Violations 0.50
-1546953392 2018-3-15 0:00: PW No Violations 0.80
-1631157914 2020-2-25 0:00: PW No Violations 0.50
-1659661566 2008-1-29 0:00: PW No Violations
-178011517 2015-12-11 0:00 PW No Violations 1.50
-189773913 2016-11-28 0:00 PW No Violations 1.50
-22134244 2016-7-25 0:00: PW No Violations 1.50
-327026817 2003-6-4 0:00:0 PW No Violations
-624184511 2016-8-23 0:00: PW No Violations 1.50
-731671556 2009-12-17 0:00 PW No Violations
-748739820 2019-11-26 0:00 PW No Violations 0.40
0022134244 2016-07-25 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip with the sales line now connected. A horizontal line heater adjacent to the production equipment is now plumbed. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with a motor present and not wired. The valves are open on the casing and closed on the tubing and flowline disconnected with casing pressure reduced from 960 pounds per square inches to 165 pounds per square inches. The salesline leaves the location and ties in at the north side of Encore Industries plant near a Columbia Gas metering station. I placed call to Berry Enterprises requesting an update on when the well and Mr. Berry returned my call stating that Columbia Gas is testing the gas and if the gas is approved a master meter will be set at that location for sales.
0166414346 2015-10-15 Production Wells No Violations I received a call back from Allen Berry of Berry Enterprises regarding NOV-1452140164, Mr. Berry stated that he is negotiating with the Encore factory to begin to sell them gas. Mr. Berry also stated that the flowline and the salesline will be hooked up very soon and the motor will be installed next week. I stated that issues need to be addressed as soon as possible as the NOV is past due.
0178011517 2015-12-11 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed the production equipment included a 100bbl tanks within an earthen dike also present was a horizontal separator, a drip with the sales line disconnected. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing and flowline disconnected. There has been no change in the status of said well. Photographs were taken with proper identification was present. I placed a call to Alan Berry of Berry Enterprises and advised him that no action has been taken to bring the well into compliance and I needed a timeline for getting the well back online or further legal actions may be taken to bring these violations into compliance.
0189773913 2016-11-28 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves have been closed at the wellhead since the last inspection on October 25, 2016 and no communication has been received from operator on the status. I placed call to Berry Enterprises and advised them that I need an update on the well.
0219690321 2010-03-04 Production Wells No Violations At site with company rep Nick Berlsman to discuss plug job.
0327026817 2003-06-04 Production Wells No Violations STATUS CHECK
0344627190 2010-02-18 Production Wells Violations Noted Inspection revealed that there has been no change in status of well it still remains idle, called company rep Mark Moody and discussed future plan for said well and he stated that he would inquire with corporate officer and get back with me with future plan for placing well into production or plug said well.
0572866151 2018-10-25 Production Wells No Violations The purpose of my inspection was a follow up on Compliance Notice-1452140164. The well was equipped with 4.5-inch diameter production casing with a tubing head, 1.5-inch diameter tubing, rods, and a pumping unit. All production valves were in the closed position and the production line gauge read zero pounds per square inch. The production equipment consisted of one 100-barrel tank and one horizontal separator. The separator was equipped with a gauge reading zero pounds per square inch.
0624184511 2016-08-23 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip with the sales line now connected and a horizontal line heater. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with a motor present and not wired. The valves are open on the casing and closed on the tubing. I placed call to Berry Enterprises requesting an update on when the well and Mr. Berry returned my call stating that he is still waiting on Columbia Gas to approve a master meter which will be set at the north side of the Encore Industries plant for sales.
0731671556 2009-12-17 Production Wells No Violations Inspection revealed that well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks and 1-50 bbl tank in need of proper dike construction, inspected site along with supervisor Robert Stonerock.
0948982223 2015-02-09 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed that the production equipment included 2-100bbl tanks and a 50bbl brine tank within an earthen dike also present was a horizontal separator. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing. I placed a call to Brian Levengood of Dover Atwood and he stated they are trying to get a line hooked up to the plastic plant to put the well back in production.
0973281145 2016-10-25 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line iby electricity. The valves are open on the casing and closed on the tubing. There is no change since the last inspection on October 12, 2016 and no communication has been received from operator on the status. I placed call to Berry Enterprises and advised them that I need an update on the well.
1044179457 2016-03-09 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed there was no change in the status of the well since the last inspection on 12/11/15. The production equipment included a 100bbl tanks within an earthen dike also present was a horizontal separator, a drip with the sales line disconnected and a horizontal line heater. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing and flowline disconnected. Photographs were taken with proper identification was present.
1056443460 2015-10-14 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed the production equipment included a 100bbl tanks within an earthen dike also present was a horizontal separator, a drip with the sales line disconnected. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing and flowline disconnected. Photographs were taken with proper identification was present. I placed a call to Alan Berry of Berry Enterprises and advised him that no action has been taken to bring the well into compliance and I needed a timeline for getting the well back online or further legal actions may be taken to bring these violations into compliance.
1157160012 2016-07-07 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Scott Scheiner following up on NOV-1452140164, I witnessed the production equipment included a 100bbl tank within an earthen dike also present was a horizontal separator, a drip with the sales line now connected. A horizontal line heater adjacent to the production equipment is now plumbed. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with a motor present and not wired. The valves are closed on the casing and tubing and flowline disconnected. There has been no change in the status of said well. Photographs were taken with proper identification was present. I placed call to Berry Enterprises requesting an update on when the well will be online. Mr. Berry returned my call and stated that the line has been repaired and tested with talks ongoing with Encore to begin selling gas to the factory and should begin producing the well this week. Mr. Berry also stated that he is in talks with Columbia Gas to also
1212505390 2008-06-03 Production Wells No Violations CALLED TED HAAS, RANGE RESOURCES, INQUIRED ON P# 1979. HE HAD NO KNOWLEDGE OF NOV ON WELL. WOULD CALL ME BACK AS SOON AS HE HAD FOUND OUT SOMETHING. WELL IS STILL IDLE AND NEEDS PLUGGED OR PRODUCED.
1238692922 2018-02-07 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves remained in the closed position at the wellhead with no change in the status since the last inspection on September 28, 2017.
1309538804 2013-05-01 Production Wells No Violations Inspected site along with local inspector and it was determined that there has been no change in status of well it still remains idle and all valves at wellhead were shut on this day of our inspection.
1377011229 2013-08-20 Production Wells No Violations On the day of my inspection I witnessed no change in the status of the well pryor to my last inspection.
1409424915 2017-06-22 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves remained in the closed position at the wellhead with no change in the status since the last inspection on January 20, 2017.
1434027909 2015-06-11 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed that the well has been transferred to Berry Enterprises and the production equipment included 2-100bbl tanks and a disconnected 50bbl brine tank within an earthen dike also present was a horizontal separator, a drip. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing. I placed a call to Alan Berry of Berry Enterprises and he stated that he recently acquired well and did not know there was an outstanding violation and that he is in the process of getting electric service hooked up to get the well back in production. I stated that I needed a timeline for his plan and he stated that he would call me as soon as the electric was hooked up.
1452140164 2013-05-02 Production Wells Violations Noted On the day of my inspection I meet with inspector David Ball to check the status of this well, the well still remains idle, there is a pumping unit at the well, the valves on the production line at the well head are closed. At the entry way there is a separator/ drip and (2) one hundred barrel production tanks and (1) fifty barrel steel brine tank with the I.D. posted setting inside a containment dike. The requirements to meet The Division of Oil and Gas standards will be to make the well capable of commercial production within thirty days or plugging is required within ninety days, failure to comply may result in forfeiture of bond.
1461155000 2016-04-20 Production Wells No Violations On the day of my inspection following up on NOV-1452140164, I witnessed there was no change in the status of the well since the last inspection on 3/9/16. The production equipment included a 100bbl tanks within an earthen dike also present was a horizontal separator, a drip with the sales line disconnected and a horizontal line heater. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity with no motor present and valves closed on the casing and tubing and flowline disconnected. Photographs were taken with proper identification being present. I received correspondence from Berry Enterprises requesting an extension to June 30, 2016 on the Compliance Notice. After reviewing the proposed plan to get the well back into production with ODNR Supervision the extension has been granted.
1506623175 2017-09-28 Production Wells No Violations proOn the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves remained in the closed position at the wellhead with no change in the status since the last inspection on June 22, 2017.
1546953392 2018-03-15 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves remained in the closed position at the wellhead with no change in the status since the last inspection on February 7, 2018. I placed call to Alan Berry of Berry Enterprises requesting an update on the well. Mr. Berry stated that Encore is installing a new HVAC system and will be utilizing the gas upon completion. Mr. Berry stated he would notify me as things progress.
1587865955 2019-01-18 Production Wells No Violations The purpose of my inspection was a follow up on Compliance Notice-1452140164. The well was equipped with 4.5-inch diameter production casing with a tubing head, 1.5-inch diameter tubing, rods, and a pumping unit. All production valves were in the closed position and the production line gauge read zero pounds per square inch. The production equipment consisted of one 100-barrel tank, one horizontal separator, and on indirect line heater. The separator was equipped with a gauge reading zero pounds per square inch. I spoke with the Manager at the Encore Industries located by the well and he stated that they are not receiving any natural gas from the well. Berry Enterprises has submitted reports of gas production for the year 2017.
1591112779 2020-6-2 0:00:0 PW No Violations 1.00
1640705838 2017-01-20 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, rods and a Cabot pumping unit powered by electricity with the power in the off position. All valves remained in the closed position at the wellhead with no change in the status since the last inspection on November 28, 2016. There has been no communication from operator on the status. I placed call to Berry Enterprises and advised them that I need an update on the well.
1659661566 2008-01-29 Production Wells Violations Noted INSPECTION REVEALED WELL TO BE IDLE. ALL SURFACE CONNECTIONS ARE DISCONNECTED.
166414346 2015-10-15 0:00 PW No Violations 1.00
2010776587 2016-10-12 Production Wells No Violations On the day of my inspection following up on Compliance Notice-1452140164, I witnessed the production equipment included a 100 barrel tank within an earthen dike also present was a horizontal separator, a drip and a horizontal line heater. The well was equipped with 8.625 inch casing, 4.5 inch casing, 1.5 inch tubing, rods and pumping unit powered by electricity. The valves are open on the casing and closed on the tubing. I placed call to Berry Enterprises requesting an update on status of the well.
219690321 2010-3-4 0:00:0 PW No Violations
344627190 2010-2-18 0:00: PW No Violations
572866151 2018-10-25 0:00 PW No Violations 0.30
70645266 2020-8-11 0:00: PW No Violations 1.00
717104175 2020-8-11 0:00: PW No Violations 1.00
948982223 2015-2-9 0:00:0 PW No Violations 1.50
973281145 2016-10-25 0:00 PW No Violations 1.50

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0344627190 US-OH-123614 2008-01-29 Well shall be plugged
1452140164 US-OH-113086 2013-05-23 General Safety
1452140164 US-OH-113087 2013-05-23 Unlawful venting or flaring of gas
1452140164 US-OH-113088 2013-05-23 Well shall be plugged
1452140164 US-OH-113089 2013-05-23 Defective casing, leaking well
1452140164 US-OH-113090 2013-05-23 Statement of annual production not filed
1659661566 US-OH-116401 2008-01-29 Well shall be plugged

For data sources see[9]

References