If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-23799 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.96,"lon":-81.54,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Jackson Township | |
Operator Name: EASTLAND ENERGY GROUP INC | |
Well Pad ID: | |
Farm/Lease Name: KOVAR UNIT | |
License Status: Producing | |
License Date: 1990-07-31 | |
Spud Date: 1990-08-22 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1990-08-27 | |
Well Total Depth: 5350.00 ft | |
Configuration: Vertical | |
Latitude: 39.960000 | |
Longitude: -81.540000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1990-07-31 | 3715 EASTLAND ENERGY GROUP INC GeoDate 7/31/90 |
Oil and Gas | 1990-07-31 | Issued Date 7/31/90 Expired Date 7/31/91 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05350 Proposed Drill Depth 05350 |
Original Spud | 1990-08-22 | |
Completed | 1990-08-27 | |
Reached Total Depth | 1990-08-27 | |
Completion Report Received | 1990-10-12 | |
Construction Permit Expires | 1991-07-31 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5102 | 5207 | 0 |
5102 | 5207 | 0 | |
2006-09-11 | 5138 | 5180 | 43 |
5138 | 5180 | 43 | |
5102 | 5207 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 450 | 500 | ? 500 SKS. SD.* | ||
H2O | 0 | 2100 Bbl | 0 | FRAC:WATER/SAND/CO2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1991 | EASTLAND ENERGY GROUP INC | 11917.00 | 3946.00 | 347 |
1992 | EASTLAND ENERGY GROUP INC | 12296.00 | 2761.00 | 365 |
1993 | EASTLAND ENERGY GROUP INC | 13742.00 | 2149.00 | 365 |
1994 | EASTLAND ENERGY GROUP INC | 13275.00 | 2253.00 | 365 |
1996 | EASTLAND ENERGY GROUP INC | 11648.00 | 1494.00 | 352 |
1997 | EASTLAND ENERGY GROUP INC | 12059.00 | 1027.00 | 365 |
1998 | EASTLAND ENERGY GROUP INC | 10851.00 | 1111.00 | 157 |
1999 | EASTLAND ENERGY GROUP INC | 6929.00 | 644.00 | 220 |
2000 | EASTLAND ENERGY GROUP INC | 8071.00 | 601.00 | 246 |
2001 | EASTLAND ENERGY GROUP INC | 1673.00 | 519.00 | 210 |
2002 | EASTLAND ENERGY GROUP INC | 2311.00 | 384.00 | 184 |
2003 | EASTLAND ENERGY GROUP INC | 5643.00 | 364.00 | 365 |
2004 | EASTLAND ENERGY GROUP INC | 4453.00 | 320.00 | 198 |
2005 | EASTLAND ENERGY GROUP INC | 5818.00 | 557.00 | 336 |
2006 | EASTLAND ENERGY GROUP INC | 2389.00 | 526.00 | 162 |
2007 | EASTLAND ENERGY GROUP INC | 2298.00 | 336.00 | 365 |
2008 | EASTLAND ENERGY GROUP INC | 48.00 | 704.00 | 352 |
2009 | EASTLAND ENERGY GROUP INC | 4323.00 | 156.00 | 153 |
2010 | EASTLAND ENERGY GROUP INC | 4372.00 | 158.00 | 213 |
2011 | EASTLAND ENERGY GROUP INC | 5448.00 | 452.00 | 365 |
2012 | EASTLAND ENERGY GROUP INC | 4813.00 | 428.00 | 366 |
2013 | EASTLAND ENERGY GROUP INC | 4156.00 | 389.00 | 340 |
2014 | EASTLAND ENERGY GROUP INC | 5240.00 | 482.00 | 350 |
2015 | EASTLAND ENERGY GROUP INC | 5083.00 | 310.00 | 350 |
2016 | EASTLAND ENERGY GROUP INC | 3744.00 | 289.00 | 365 |
2017 | EASTLAND ENERGY GROUP INC | 4619.00 | 269.00 | 365 |
2018 | EASTLAND ENERGY GROUP INC | 4284.00 | 287.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1004959734 | 2012-12-20 0:00 | PW | No Violations | |
-1796165715 | 2007-8-22 0:00: | PW | No Violations | |
-291842570 | 2008-2-8 0:00:0 | PW | No Violations | |
-339814640 | 2020-1-9 0:00:0 | PW | No Violations | 0.50 |
-629658135 | 2016-7-29 0:00: | PW | No Violations | 1.00 |
0000010994 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 11/19/91 INSPECTOR MIKE PHELPS DATE 11/1919/91 DATA FROM OLD VAX INFO | |
0163292867 | 2007-05-14 | Production Wells | No Violations | STATUS CHECK |
0291842570 | 2008-02-08 | Production Wells | No Violations | STATUS CHECK. DIKE AREA CLEANED UP. |
0629658135 | 2016-07-29 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 2-100 barrel tanks, a vertical separator, a drip, a 2 inch salesmeter with a .25 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a Lufkin pumping unit powered by electricity with valves in the open position. The 50 barrel tank has been removed along with the contamination with the area remediated. |
0666505968 | 2005-10-03 | Production Wells | No Violations | STATUS CHECK |
0942971775 | 2010-09-27 | Production Wells | No Violations | Inspection revealed that well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks with dike in place. |
1004959734 | 2012-12-20 | Production Wells | No Violations | On the day of my inspection I found a pumping unit at the well site, the valves on the production line were open, the divisions production records for the year of 2011 are current, there is (2) one hundred barrel production tanks/ steel brine tank/ separator/ drip/ chart setting inside a containment dike. |
10994 | PL | No Violations | ||
1289i48516 | 2001-03-29 | Production Wells | No Violations | NO VIOLATIONS NOTED |
1289i4851629 | 2001-3-29 0:00: | PW | No Violations | |
1333456781 | 2012-04-03 | Production Wells | No Violations | Inspection of the well head found the following equipment -4.5 production casing -2.375 tubing with the proper production valves open and the well being produced by means of a pumping unit -2-100 barrel and one 20 barrel tanks a separator and meter are present in an established dike with proper well identification. |
1369811307 | 2005-07-25 | Production Wells | No Violations | STATUS CHECK |
1469106583 | 2016-07-21 | Production Wells | No Violations | On the day of my inspection I witnessed the production equipment included 2-100 barrel tanks, a vertical separator, a drip, a 2 inch salesmeter with a .25 inch orifice and a chart recorder all within an earthen dike. Also present in a separate dike a 50 barrel brine tank with contamination present around the base. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.375 inch tubing, rods and a Lufkin pumping unit powered by electricity with valves in the open position. I advised Michael Bilaj of Eastland Energy to remediate the area around the 50 barrel tank. Mr. Bilaj responded stating that he would remediate the area immediately. |
1597849397 | 2020-8-18 0:00: | PW | No Violations | 1.00 |
163292867 | 2007-5-14 0:00: | PW | No Violations | |
1796165715 | 2007-08-22 | Production Wells | No Violations | STATUS CHECK |
427055814 | 2020-2-11 0:00: | PW | No Violations | 0.30 |
666505968 | 2005-10-3 0:00: | PW | No Violations | |
862411906 | 2020-2-11 0:00: | PW | No Violations | 0.30 |
942971775 | 2010-9-27 0:00: | PW | No Violations |
For data sources see[9]