34-059-24388

Well Details

Well ID: 34-059-24388
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001064
Farm/Lease Name: WEEKENDER
License Status: Plugged Back
License Date: 2014-06-06
Spud Date: 2014-06-23
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Directional
Latitude: 40.050000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-06 Proposed Formations:TRENTON, Issued Date:6/6/2014, Expired Date:6/5/2016 12:00:00 PM, Drilling unit acres:650.448, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2014-09-02
Construction Permit Expires 2016-06-05
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-03-22 8327 14623 983
8327 14623 983
8327 14623 983

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/29/2015 05/29/2015 8099 8,193,830.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
BC-140, FE-1A ACIDIZING COMPOSITION,

FR-76, HAI-OS ACID INHIBITOR, LOSURF-300D, OPTIFLO-HTE, SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK, SP BREAKER, WG-36 GELLING AGENT

Halliburton Additive, Breaker, Corrosion Inhibitor, Crosslinker, Friction Reducer, Gelling Agent, Non-ionic Surfactant, Proppant NA NA 0 0 0
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 87.6399 68,254,400.0
HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0
HP 2220, MB 7530 One Aqua Source Biocide, Scale Inhibitor NA NA 0 0 0
Hazardous and Non-Hazardous Ingredients Methanol 67-56-1 60 0.000661787 516
Hydrochloric acid 7647-01-0 60 0.8095 630442
Acetic acid 64-19-7 60 0.00320087 2493
Bentonite, benzyl(hydrogenated

tallow alkyl) dimethylammonium stearate complex

121888-68-4 5 0.00290866 2266
Crystalline Silica, Quartz 14808-60-7 0.1 0.00005817 46
Olefins Confidential 5 0.000132357 104
Sodium chloride 7647-14-5 30 0.0335507 26130
Fatty acids, tall oil Confidential 30 0.000330893 258
Acrylamide acrylate polymer Confidential 30 0.0335507 26130
Organic Phosphate 71050-62-9 25 0.00338824 2639
Propargyl alcohol 107-19-7 10 0.000110298 86
Sodium sulfate 7757-82-6 0.1 0.00000193 2
Guar gum 9000-30-0 100 0.0581733 45306
Crystalline silica, quartz 14808-60-7 100 10.7778 8,393,790.0
Naphthalene 91-20-3 5 0.00005597 44
C.I. Pigment Red 5 6410-41-9 1 0.00001240 10
Acetic anhydride 108-24-7 100 0.00533478 4155
Silica gel 112926-00-8 1 0.000581733 454
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000330893 258
Dazomet 533-74-4 24 0.00700902 5459
Sodium Hydroxide 1310-73-2 4 0.00116817 910
Monoethanolamine borate 26038-87-9 60 0.00600228 4675
Cured acrylic resin Confidential 30 0.000384313 300
Sodium persulfate 7775-27-1 100 0.0019336 1506
Walnut hulls NA 100 0.00123972 966
1,2,4 Trimethylbenzene 95-63-6 1 0.00001119 9
Oxyalkylated phenolic resin Confidential 30 0.000447741 350
Water 7732-18-5 100 1.42227 1,107,670.0
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,

branched

127087-87-0 5 0.00005597 44
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000335805 262
Reaction product of acetophenone,

formaldehyde, thiourea and oleic acid in dimethyl formamide

68527-49-1 30 0.000330893 258
Enzyme Confidential 5 0.00006199 49
Hydrotreated light petroleum distillate 64742-47-8 30 0.0335507 26130
Surfactant mixture Confidential 1 0.00116347 908
Ethanol 64-17-5 60 0.000671611 524
Ethylene glycol 107-21-1 30 0.00300114 2338

For data sources see[4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 ECLIPSE RESOURCES I LP Brine 5648 102
2016 ECLIPSE RESOURCES I LP Brine 19132 360
2017 ECLIPSE RESOURCES I LP Brine 6771 363
2018 ECLIPSE RESOURCES I LP Brine 3347 362
2019 ECLIPSE RESOURCES I LP Brine 661 90

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-109235313 2014-6-23 0:00: DD No Violations
-1105390596 2017-6-7 0:00:0 PW No Violations 0.40
-1195391320 2020-9-3 0:00:0 PW No Violations 1.00
-1202560795 2016-6-13 0:00: PW No Violations 0.50
-1497872366 2015-4-16 0:00: PL No Violations 0.30
-278050287 2014-9-10 0:00: DD No Violations 1.50
-347227646 2015-9-22 0:00: CT No Violations 2.00
-677815932 2014-9-8 0:00:0 DD No Violations 2.00
0109235313 2014-06-23 Drill / Deepen / Reopen No Violations On the day of my inspection, I witnessed Universal Well Service break circulation with fresh water then displace 440 sacks of Type-1 cement to a depth of one hundred foot with twenty barrel of cement returns into the cellar.
0161797931 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
0278050287 2014-09-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that clean-up from Sunday nights spill was completed and done satisfactorily. Patterson UTI Drilling Rig #328 had successfully ran and cemented their production string and were setting their slips and preparing to skid to the Weekender 4H. Completed walk around with Company Man Billy Shafer and pointed out the rig containment had two small tears. Billy Shafer stated that a containment crew will be on site after rig skid is completed and repairs will be made.
0347227646 2015-09-22 Completion Testing No Violations On the day of my inspection I witnessed that Tetra Services was on site with flowback testing completed. Production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the closed position with 2900psi on the tubing and casing. The well will go to production tomorrow with all fluids and gas going to the Borton CGF. Completed walk around with Consultant Cristo Giannareas revealing that secondary containment and proper identification was in place and preparations were being made to flowback the 4H.
0677815932 2014-09-08 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that the rig has been cleaned and the majority of the stone removed and replaced. Contaminated vegetation removal is underway and should be completed by this evening. I made request to Company Man Billy Shaffer to begin cleaning the top of the two trailers that got hit by mist and then finish the removal of contaminated stone.
1105390596 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with a plunger lift system with valves in the open position with 420 pounds per square inch on the tubing and 625 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1202560795 2016-06-13 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the closed position with 2005psi on the tubing and 2010psi on the casing
1243390556 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit, a blow case skid and 2-400 barrel purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 825 pounds per square inch on the tubing and 1100 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1410146457 2014-09-07 Drill / Deepen / Reopen No Violations On the day of my inspection I received a phone call from Eclipse that at approximately 6:00pm a 4 inch line supplying oil based drilling mud from the suitcase to the standpipe ruptured. Upon arrival I met with Company Man Sam Bond-Zielinski and Eclipse EHS Representative Mike Hartshorn completing walk around I witnessed that 5.5bbls of oil based mud had sprayed the side of the doghouse, derrick and misted across the south side of the well pad. The light mist affected 40 foot by 50 foot area of vegetation outside well pad containment and a 40 foot by 50 foot outside the drilling rig primary containment. Grant Smith, PETA and the Patterson Drilling Rig #328 crew were on site removing contaminated stone and power washing the drilling rig with a vacuum truck on site pulling up contaminated water. Eclipse was instructed to remove contaminated vegetation, dispose of properly and to continue fluid recovery within the well pad.
1440878253 2019-11-27 0:00 PW No Violations 0.20
1450883518 2015-12-23 Production Wells No Violations On the day of my inspection accompanied by ODNR Inspector Jim Nicholson I witnessed production equipment included a sand trap, a line heater, a GP Unit along with 2-400bbl purge tanks within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 2100psi on the tubing and 2150psi on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF.
1497872366 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
161797931 2015-4-16 0:00: PL No Violations 0.20
2088258742 2020-6-17 0:00: PW No Violations 1.00

For data sources see[7]