If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.38,"lon":-81.26,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Monroe Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: US-OH-000683 | |
Farm/Lease Name: WAGNER | |
License Status: Plugged Back | |
License Date: 2013-04-01 | |
Spud Date: 2013-07-30 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2013-11-28 | |
Well Total Depth: 7345.00 ft | |
Configuration: Vertical | |
Latitude: 40.380000 | |
Longitude: -81.260000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-01 | Proposed Formations:POINT PLEASANT, Issued Date:4/1/2013, Expired Date:4/1/2015 12:00:00 PM, Drilling unit acres:108.6, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-11-28 | |
Completion Report Received | 2014-01-28 | |
Construction Permit Expires | 2015-04-01 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/13/2014 | 10/17/2014 | 6996 | 7,118,400.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | B466 | Schlumberger | Friction Reducer | Alcohol Ethoxylates | Proprietary | 5 | 0.00062587 | 0 |
Distillates (petroleum), hydrotreated light | 64742-47-8 | 30 | 0.00375523 | 0 | ||||
Ammonium Acetate | 631-61-8 | 6 | 0.00075105 | 0 | ||||
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00201425 | 0 | |
EC6116A | Nalco | Biocide | Polyethylene Glycol | 25322-68-3 | 60 | 0.172927 | 0 | |
Dibromoacetonitrile | 3252-43-5 | 5 | 0.0144106 | 0 | ||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30 | 0.0864635 | 0 | ||||
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 88.4795 | 0 | |
7.5% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 8 | 0.00016731 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00056475 | 0 | |
Aliphatic acids | Proprietary | 30 | 0.00056475 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00018825 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.000753 | 0 | ||||
EC6486A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00010177 | 0 | |
J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00096075 | 0 | |
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.00059964 | 0 | |
EC6673W | Nalco | Iron Control | Ethylene Glycol | 107-21-1 | 30 | 0.00366919 | 0 | |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 11.2462 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | CHEVRON APPALACHIA LLC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHEVRON APPALACHIA LLC | Brine | 0 | 0 |
2016 | CHEVRON APPALACHIA LLC | Brine | 0 | 0 |
2017 | CHEVRON APPALACHIA LLC | Brine | 2034 | 365 |
2018 | CHEVRON APPALACHIA LLC | Brine | 4701 | 365 |
2019 | CHEVRON APPALACHIA LLC | Brine | 502 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1379492066 | 2019-10-7 0:00: | PW | No Violations | 1.00 |
-366438217 | 2015-11-2 0:00: | PW | No Violations | 1.00 |
0112837611 | 2013-08-01 | Drill / Deepen / Reopen | No Violations | I arrived on location for surface cement job . 20 at 312 with 726 sks got cement returns to surface. No violations this date. |
0366438217 | 2015-11-02 | Production Wells | No Violations | Southeast East geologist Jake Glascock requested that an inspection be conducted as part of a water well investigation. Inspector Moreland and I found the well has been completed but not placed in operation. The production tree has all the valves that operate the well shut in and locked. The tin horn has filled to ground level with rock, there are no signs of leaks spills or contamination and pollution around the well head. There is no production facility in place at this time. |
0465273639 | 2013-08-04 | Drill / Deepen / Reopen | No Violations | I arrived on location for a surface job , 1,157 of 13 3/8 cemented w/ 935 sks. |
1058052456 | 2016-12-13 | Preliminary Restoration | No Violations | On the day of my inspection I witnessed the lease road and well location to be in good repair. Upon my arrival on location I discovered that all production equipment has now been put into place and tied together. The permitted well bore is set up to be utilizing natural reservoir for means of production. The wells were not tied into a gas sales line at the time of my inspection. The production equipment for the well bore consists of the following:
8- 500 barrel production tanks 2- Vapor recovery unit compressors 1- Condensate flash unit 2- Gas production units equipped with an internal heaters and sand separators 1- Gas sales line heater 1- Sales line compressor 1- Low pressure separator 1- Combustion unit 2- Permitted well bores set to be utilizing natural gas pressure for means of production The site passed preliminary restoration in accordance with ORC 1509.072 A. |
112837611 | 2013-8-1 0:00:0 | DD | No Violations | 4.50 |
1194218201 | 2017-10-31 | Preliminary Restoration | No Violations | On the day of my inspection I found this pad with two properly labeled plunger lift wells. Production equipment includes eight 400 barrel steel production tanks, 2 gas production units, one compressor, one line heater, and a vapor reocvery system. Surface casing has 0 psi on it while intermediate has 800 psi. Truck is being loaded with condensate while onsite. Spoke with James Steel, well tender. Well is shut in with a do not operate tank on it because that got a plug stuck down hole trying to work on plunger lift. Site passes preliminary restoration per ORC 1509.072A. |
1222029454 | 2016-07-08 | Production Wells | No Violations | This well has a frack valve on the wellhead with no other production equipment on site. There are no production or sales lines, tanks, separators on site at this time. |
1295300783 | 2017-10-31 | Production Wells | No Violations | On the day of my inspection I found this pad with two properly labeled plunger lift wells. Production equipment includes eight 400 barrel steel production tanks, 2 gas production units, one compressor, one line heater, and a vapor reocvery system. Surface casing has 0 psi on it while intermediate has 800 psi. Truck is being loaded with condensate while onsite. Spoke with James Steel, well tender. Well is shut in with a do not operate tank on it because they got a plug stuck down hole trying to work on plunger lift. |
1375966865 | 2013-08-05 | Drill / Deepen / Reopen | No Violations | I arrived on location to inspect wellpad and pick up cement tickets , rig is moving off location. No violations on site at this date. |
1426682620 | 2013-12-13 | Drill / Deepen / Reopen | No Violations | I arrived today to check on the drilling status of Nabors Drilling Rig # X07 . I found them rigging down to make repairs to the sub soils below the drilling unit. The rig is tilting and the repairs are to correct this problem. I had a conference with Blake Arthur and Ron Trivisonno about the action required to remediate the sub soils. I was advised to have Chevron submit an engineered plan of remediation to Ron Trivisonno for him to approve before any further drilling could continue. Chevron told me that they have three engineers working the problem and would have a plan on Rons desk for review shortly. |
465273639 | 2013-8-4 0:00:0 | DD | No Violations | 6.00 |
For data sources see[8]