X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-21161

Well Details

Well ID: 34-067-21161
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Monroe Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: US-OH-000683
Farm/Lease Name: WAGNER
License Status: Plugged Back
License Date: 2013-04-01
Spud Date: 2013-07-30
Spud Drilling Contractor: NABORS DRILLING
Final Drill Date: 2013-11-28
Well Total Depth: 7345.00 ft
Configuration: Vertical
Latitude: 40.380000
Longitude: -81.260000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-01 Proposed Formations:POINT PLEASANT, Issued Date:4/1/2013, Expired Date:4/1/2015 12:00:00 PM, Drilling unit acres:108.6, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-11-28
Completion Report Received 2014-01-28
Construction Permit Expires 2015-04-01
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/13/2014 10/17/2014 6996 7,118,400.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 B466 Schlumberger Friction Reducer Alcohol Ethoxylates Proprietary 5 0.00062587 0
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.00375523 0
Ammonium Acetate 631-61-8 6 0.00075105 0
L058 Schlumberger Iron Stabilizer Sodium erythorbate 6381-77-7 100 0.00201425 0
EC6116A Nalco Biocide Polyethylene Glycol 25322-68-3 60 0.172927 0
Dibromoacetonitrile 3252-43-5 5 0.0144106 0
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30 0.0864635 0
Base Fluid Chevron Carrier/Base Fluid Water (Including Mix Water Supplied by Client) 7732-18-5 100 88.4795 0
7.5% Acid Schlumberger Perf Cleanup Hydrocloric Acid 7647-01-0 8 0.00016731 0
A264 Schlumberger Corrosion Inhibitor Aliphatic alcohols, ethoxylayed #1 Proprietary 30 0.00056475 0
Aliphatic acids Proprietary 30 0.00056475 0
Prop-2-yn-1-ol 107-19-7 10 0.00018825 0
Methanol 67-56-1 40 0.000753 0
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.00010177 0
J134 Schlumberger Gel Breaker Hemicellulase enzyme 9012-54-8 100 0.00096075 0
J580 Schlumberger Gelling Agent, Water Carbohydrate Polymer Proprietary 100 0.00059964 0
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00366919 0
Proppant Schlumberger Proppant Crystalline Silica 14808-60-7 100 11.2462 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 CHEVRON APPALACHIA LLC 0 0 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 CHEVRON APPALACHIA LLC Brine 0 0
2016 CHEVRON APPALACHIA LLC Brine 0 0
2017 CHEVRON APPALACHIA LLC Brine 2034 365
2018 CHEVRON APPALACHIA LLC Brine 4701 365
2019 CHEVRON APPALACHIA LLC Brine 502 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1379492066 2019-10-7 0:00: PW No Violations 1.00
-366438217 2015-11-2 0:00: PW No Violations 1.00
0112837611 2013-08-01 Drill / Deepen / Reopen No Violations I arrived on location for surface cement job . 20 at 312 with 726 sks got cement returns to surface. No violations this date.
0366438217 2015-11-02 Production Wells No Violations Southeast East geologist Jake Glascock requested that an inspection be conducted as part of a water well investigation. Inspector Moreland and I found the well has been completed but not placed in operation. The production tree has all the valves that operate the well shut in and locked. The tin horn has filled to ground level with rock, there are no signs of leaks spills or contamination and pollution around the well head. There is no production facility in place at this time.
0465273639 2013-08-04 Drill / Deepen / Reopen No Violations I arrived on location for a surface job , 1,157 of 13 3/8 cemented w/ 935 sks.
1058052456 2016-12-13 Preliminary Restoration No Violations On the day of my inspection I witnessed the lease road and well location to be in good repair. Upon my arrival on location I discovered that all production equipment has now been put into place and tied together. The permitted well bore is set up to be utilizing natural reservoir for means of production. The wells were not tied into a gas sales line at the time of my inspection. The production equipment for the well bore consists of the following:
8- 500 barrel production tanks 

2- Vapor recovery unit compressors 1- Condensate flash unit 2- Gas production units equipped with an internal heaters and sand separators 1- Gas sales line heater 1- Sales line compressor 1- Low pressure separator 1- Combustion unit 2- Permitted well bores set to be utilizing natural gas pressure for means of production The site passed preliminary restoration in accordance with ORC 1509.072 A.

112837611 2013-8-1 0:00:0 DD No Violations 4.50
1194218201 2017-10-31 Preliminary Restoration No Violations On the day of my inspection I found this pad with two properly labeled plunger lift wells. Production equipment includes eight 400 barrel steel production tanks, 2 gas production units, one compressor, one line heater, and a vapor reocvery system. Surface casing has 0 psi on it while intermediate has 800 psi. Truck is being loaded with condensate while onsite. Spoke with James Steel, well tender. Well is shut in with a do not operate tank on it because that got a plug stuck down hole trying to work on plunger lift. Site passes preliminary restoration per ORC 1509.072A.
1222029454 2016-07-08 Production Wells No Violations This well has a frack valve on the wellhead with no other production equipment on site. There are no production or sales lines, tanks, separators on site at this time.
1295300783 2017-10-31 Production Wells No Violations On the day of my inspection I found this pad with two properly labeled plunger lift wells. Production equipment includes eight 400 barrel steel production tanks, 2 gas production units, one compressor, one line heater, and a vapor reocvery system. Surface casing has 0 psi on it while intermediate has 800 psi. Truck is being loaded with condensate while onsite. Spoke with James Steel, well tender. Well is shut in with a do not operate tank on it because they got a plug stuck down hole trying to work on plunger lift.
1375966865 2013-08-05 Drill / Deepen / Reopen No Violations I arrived on location to inspect wellpad and pick up cement tickets , rig is moving off location. No violations on site at this date.
1426682620 2013-12-13 Drill / Deepen / Reopen No Violations I arrived today to check on the drilling status of Nabors Drilling Rig # X07 . I found them rigging down to make repairs to the sub soils below the drilling unit. The rig is tilting and the repairs are to correct this problem. I had a conference with Blake Arthur and Ron Trivisonno about the action required to remediate the sub soils. I was advised to have Chevron submit an engineered plan of remediation to Ron Trivisonno for him to approve before any further drilling could continue. Chevron told me that they have three engineers working the problem and would have a plan on Rons desk for review shortly.
465273639 2013-8-4 0:00:0 DD No Violations 6.00

For data sources see[8]

References