If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21192 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36,"lon":-81.1,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000710 | |
Farm/Lease Name: WRIGHT 35-11-5 | |
License Status: Producing | |
License Date: 2014-06-19 | |
Spud Date: 2014-07-03 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-09-05 | |
Well Total Depth: 16657.00 ft | |
Configuration: Horizontal | |
Latitude: 40.360000 | |
Longitude: -81.100000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-21 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-02-27 | Proposed Formations:POINT PLEASANT, Issued Date:2/27/2014, Expired Date:2/27/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2014-06-19 | Proposed Formations:POINT PLEASANT, Issued Date:6/19/2014, Expired Date:6/18/2016 12:00:00 PM, Drilling unit acres:1197.73, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-09-05 | |
Correction to Well | 2015-04-03 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-07-31 | UPDATE TO TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2016-02-01 | |
Construction Permit Expires | 2016-06-18 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-02-05 | 8401 | 16321 | 995 |
8401 | 16321 | 995 | |
8401 | 16321 | 995 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/18/2015 | 05/05/2015 | 8159 | 7,374,490.0 | 708634 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | ||||||||
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.0001 | 0 | |
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.0004 | 0 | ||||
Aliphatic acid | NA | 30 | 0.0003 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00059 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 16.8292 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.0003 | 0 | ||||
Water | 007732-18-5 | 93 | 0.81106 | 0 | ||||
Hydrochloric Acid | 007647-01-0 | 8 | 0.06576 | 0 | ||||
Water | 007732-18-5 | 85 | 0.15176 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00464 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00298 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.0006 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.00804 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.02678 | 0 | ||||
Potassium Hydroxide | 001310-58-3 | 15 | 0.00869 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00059 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.00804 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.0939 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.01738 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.00042 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 0.59101 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 0.41661 | 0 | |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.8938 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-04-18 | H2O | 0 | 4794 Bbl | 330821 | Schlumberger | STAGE 1/40
25 SHOTS STAGES 2-39 SEE IMAGES |
2015-05-05 | H2O | 0 | 4088 Bbl | 329611 | Schlumberger | STAGE 40/40
25 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 246171 | 24685 | 98 |
2016 | CHESAPEAKE EXPLORATION LLC | 613690 | 36733 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 317017 | 12749 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 221840 | 7258 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 47814 | 1458 | 89 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 1537 | 98 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 7700 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3590 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 4169 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 624 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1070921524 | 2014-8-19 0:00: | DD | No Violations | 1.00 |
-390770753 | 2018-10-18 0:00 | PW | No Violations | 1.00 |
0390770753 | 2018-10-18 | Production Wells | No Violations | |
1070921524 | 2014-08-19 | Drill / Deepen / Reopen | No Violations | On the date of inspection I witnessed that the Patterson 261 rig had drilled to a depth of 828 feet and was currently broke down awaiting parts. |
1104893587 | 2015-05-28 | Preliminary Restoration | No Violations | On this date I am on site to conduct an inspection on the well site for Preliminary Restoration. The well passes for Preliminary Restoration per ORC 1509.072(A). |
1408399471 | 2014-08-18 | Casing String Witnessed | No Violations | Patterson 261 has drilled a 17.5 open hole to a depth of 595. The 20 conductor was set to 120. 583 of 13.375 54.5#/ft casing was ran. Otex is onsite to cement the casing back to surface using 540 sacks of class H (15.6 ppg; 1.21 yield) cement at 50% excess. Displacement calculated to be 83.8 bbl leaving a 44 shoe. Estimated 23 bbl of cement returned to surface. |
1409670109 | 2014-09-02 | Drill / Deepen / Reopen | No Violations | On the date of inspection I was informed by company man Joe Herbert that the Patterson 261 rig was currently drilling a 8.25 inch diameter hole at a depth of 11,419 feet in the lateral. After walking around the site I noticed that the chemical containment liner had a large hole (6 inch diameter) in one corner. There were noticeable amounts of chemicals within the containment including oils and powders outside of their own containers. The containment was located over the French drain system which is believed to be in the shut position. I notified Joe Herbert of the containment issues and he made requests from contractors to immediately fix the containment and check the drain system to determine if it needed to be sucked down. Joe plans to sucks up all liquids within the containment system and fix it. |
1965695177 | 2014-08-25 | Drill / Deepen / Reopen | No Violations | On the date of inspection I spoke with the company man on site, Rodney Bean. I was informed that the Patterson 261 was drilling its 8.25 inch diameter hole for its production string. It was at a depth of 5857 feet at the time of my inspection. |
1966128143 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted wells are producing off of natural reservoir pressure. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 12 400 bbl. Production tanks 8 Producing wells 8 Sand separators 2 Horizontal heater-treaters 1 combustor 1 low pressure separator/ Vapor recovery system 4 compressors 2 NGL tanks The site passed preliminary restoration in accordance with ORC 1509.072 A. |
530142032 | 2019-11-29 0:00 | PW | No Violations | 1.00 |
For data sources see[10]