If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-099-22992 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.92,"lon":-80.99,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Smith Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR | |
Well Pad ID: | |
Farm/Lease Name: WYSS | |
License Status: Producing | |
License Date: 2005-08-11 | |
Spud Date: 2006-08-06 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-08-13 | |
Well Total Depth: 5595.00 ft | |
Configuration: Directional | |
Latitude: 40.920000 | |
Longitude: -80.990000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-08-11 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:8/11/2005, Expired Date:8/11/2006 6:00:00 AM, Drilling unit acres:49.56, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2005-08-12 | TARGET INFORMATION: FOOTAGE= 2490'SL & 655'WL OF SEC. 25. X= 2,416,830. Y= 461,250. ELEV.= 1140'. |
Correction to Well | 2006-07-14 | CHANGE IN SURFACE COORDINATES: X= 2,417,125; Y= 460,965. |
Original Spud | 2006-08-06 | RBDMS Rec |
Construction Permit Expires | 2006-08-11 | RBDMS Rec |
Completed | 2006-08-13 | RBDMS Rec |
Reached Total Depth | 2006-08-13 | RBDMS Rec |
Completion Report Received | 2006-11-09 | RBDMS Rec |
Correction to Well | 2006-11-10 | CORRECTION TO TARGET LOCATION: 2545'SL & 600'WL OF SEC. 25; X= 2,416,780; Y= 461,300. UNIT SIZE INCREASED TO 49.56 ACRES. |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-01-11 | 5334 | 5393 | 104 |
5334 | 5393 | 104 | |
5334 | 5393 | 104 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 3240 Bbl | 100000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | 2846.00 | 3287.00 | 234 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | 7299.00 | 2643.00 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | 4135.00 | 1845.00 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 2679.00 | 1212.00 | 367 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 1213.00 | 1293.00 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | 1298.00 | 952.00 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | 340.00 | 627.00 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | 492.00 | 506.00 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | 844.00 | 372.00 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | 824.00 | 426.00 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | 880.00 | 491.00 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | 747.00 | 473.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 882 | 234 |
2008 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 435 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 398 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 87 | 367 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 285 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 43 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 124 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 56 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 43 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1007945060 | 2011-4-26 0:00: | PW | No Violations | |
-125954175 | 2011-4-12 0:00: | PW | No Violations | |
-917635755 | 2006-9-21 0:00: | DD | No Violations | |
0125954175 | 2011-04-12 | Production Wells | No Violations | I received a call from Dale Nething of Ohio Valley about a spill inside the dike on this well. I arrived on location and Kurt Bruderly of Bruderly Excavating was on location cleaning up the oil inside the dike. The oil spilled was approximately 6 barrels. The tank, separator will be taken out and the dirt, rocks will be hauled to a accepted land fill. This clean up continues. |
0388043020 | 2011-04-13 | Production Wells | No Violations | Bruderly Excavating has started the cleanup process. The dike area was cleaned out. The stock tank was emptied. This cleanup continues. |
0917635755 | 2006-09-21 | Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and closed. J-Well was on site to complete the well. No violations at this time. |
1007945060 | 2011-04-26 | Production Wells | No Violations | I met with Chris Grimm for a check of the dike area. The dike area has been cleaned up. Two inches of rain water were inside the dike with no show of a oil sheen. There were no violations at this time. |
1011008839 | 2006-08-21 | Drill / Deepen / Reopen | No Violations | The drilling pits are full and I called Dale Nething and requested that Ohio Valley remove several loads of water to draw the water away from the wellhead. |
1170340530 | 2009-04-30 | Preliminary Restoration | No Violations | I performed a preliminary restoration status check. I GPSd both the wellhead and the tank battery for the first time. The drilling rig and debris are gone. The pits are closed. Good vegetation is growing. This well PASSES PRELIMINARY RESTORATION. |
1302799761 | 2011-04-14 | Production Wells | No Violations | The spill inside the dike continues. Bruderly Excavating is taking the stock tank out. The rock is being picked up and hauled to a qualified land fill. |
1690119772 | 2006-08-10 | Drill / Deepen / Reopen | No Violations | Wildcat is back to drilling after completing the directional kick. They should finish this weekend. The drilling pits are lined and in good condition. |
388043020 | 2011-4-13 0:00: | PW | No Violations |
For data sources see[9]