If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24361 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Green Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-000605 | |
Farm/Lease Name: TIPPENS | |
License Status: Plugged Back | |
License Date: 2012-10-17 | |
Spud Date: 2012-09-09 | |
Spud Drilling Contractor: H & D DRILLING | |
Final Drill Date: 2013-02-03 | |
Well Total Depth: 16137.00 ft | |
Configuration: Vertical | |
Latitude: 39.670000 | |
Longitude: -81.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-10-17 | Proposed Formations:TRENTON, Issued Date:10/17/2012, Expired Date:10/17/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Plugged Back | 2012-12-25 | |
Reached Total Depth | 2013-02-03 | |
Completion Report Received | 2013-04-29 | |
Construction Permit Expires | 2014-10-17 | |
Record Last Modified | 2016-03-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-04-13 | 10226 | 16074 | 904 |
10226 | 16074 | 904 | |
10226 | 16074 | 904 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/14/2013 | 04/22/2013 | 9911 | 9,097,430.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 7.5% Acid, Slickwater, WF120, YF120ST | Schlumberger | Corrosion Inhibitor, Bactericide (Myacide GA25), Scale Inhibitor, Surfactant , Acid, Breaker, Crosslinker, Gelling Agent, Friction Reducer, Iron Contr | Methanol | 67-56-1 | 0.00455 | 0.00056 | 0 |
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0.00431 | 0.00053 | 0 | ||||
Cholinium chloride | 67-48-1 | 0.16112 | 0.01982 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04876 | 0.006 | 0 | ||||
Polyethylene glycol monohexyl ether | 31726-34-8 | 0.0662 | 0.00814 | 0 | ||||
Sodium tetraborate decahydrate | 1303-96-4 | 0.07439 | 0.00915 | 0 | ||||
Dicoco dimethyl quaternary ammonium chloride | 61789-77-3 | 0.0029 | 0.00036 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.03803 | 0.00468 | 0 | ||||
Poly(oxy-1,2-ethanediyl) | 25322-68-3 | 0.00012 | 0.00001000 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.01937 | 0.00238 | 0 | ||||
Urea | 57-13-6 | 0.00265 | 0.00033 | 0 | ||||
Alcohol, C9-11-iso, C10, ethoxylated | 78330-20-8 | 0.00052 | 0.00006000 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.0012 | 0.00015 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.0085 | 0.00105 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.04024 | 0.00495 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0.00046 | 0.00006000 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0.00008000 | 0.00001000 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0.00099 | 0.00012 | 0 | ||||
Quaternary ammonium compounds chlorides derivatives | 68989-00-4 | 0.00026 | 0.00003000 | 0 | ||||
Naphtalene (impurity) | 91-20-3 | 0.00005000 | 0.00001000 | 0 | ||||
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin | 30846-35-6 | 0.00039 | 0.00005000 | 0 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0 | 0 | ||||
Water (Including Mix Water Supplied by Client)* | - | 0 | 87.6992 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.0002 | 0.00003000 | 0 | ||||
Guar gum | 9000-30-0 | 1.58133 | 0.19452 | 0 | ||||
Heavy aromatic naphtha | 64742-94-5 | 0.00026 | 0.00003000 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0.00004000 | 0 | 0 | ||||
Siloxanes and Silicones, di-Me,
reaction products with silica |
67762-90-7 | 0.00001000 | 0 | 0 | ||||
Alcohol, C11-14, ethoxylated | 78330-21-9 | 0.00026 | 0.00003000 | 0 | ||||
Alcohol, C7-9-iso, C8, ethoxylated | 78330-19-5 | 0.00052 | 0.00006000 | 0 | ||||
Propan-2-ol | 67-63-0 | 0.00058 | 0.00007000 | 0 | ||||
1, 2, 3 - Propanetriol | 56-81-5 | 0.12398 | 0.01525 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0.00031 | 0.00004000 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0.01644 | 0.00202 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.00013 | 0.00002000 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 0.46694 | 0.05744 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0.00329 | 0.0004 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0.00242 | 0.0003 | 0 | ||||
Phenolic resin | 9003-35-4 | 1.76856 | 0.21755 | 0 | ||||
Crystalline silica | 14808-60-7 | 95.5461 | 11.7529 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0.00469 | 0.00058 | 0 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ECLIPSE RESOURCES I LP | Brine | 0 | 13 |
2014 | ECLIPSE RESOURCES I LP | Brine | 132669 | 354 |
2015 | ECLIPSE RESOURCES I LP | Brine | 9728 | 362 |
2016 | ECLIPSE RESOURCES I LP | Brine | 4317 | 360 |
2017 | ECLIPSE RESOURCES I LP | Brine | 3089 | 363 |
2018 | ECLIPSE RESOURCES I LP | Brine | 2062 | 362 |
2019 | ECLIPSE RESOURCES I LP | Brine | 536 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1047586997 | 2012-10-19 0:00 | DD | No Violations | 5.00 |
-1259329012 | 2013-7-2 0:00:0 | CT | No Violations | |
-1663518604 | 2018-6-7 0:00:0 | PW | No Violations | 0.50 |
-1869237918 | 2013-7-15 0:00: | CT | No Violations | |
-519853423 | 2012-10-24 0:00 | DD | No Violations | |
-751868512 | 2018-3-8 0:00:0 | PW | No Violations | 0.50 |
-821673807 | 2012-12-10 0:00 | DD | No Violations | |
-825607401 | 2013-1-7 0:00:0 | DD | No Violations | |
-841094431 | 2013-1-11 0:00: | DD | No Violations | |
-963636438 | 2012-11-26 0:00 | DD | No Violations | |
0091802177 | 2012-11-19 | Drill / Deepen / Reopen | No Violations | Inspection of the drill site found the current hole depth to be 5665 with the company currently reaming with a 12.375 in a 12.250 hole. The Marcellus has been cored and will be logged and the company is looking to set 9.625 casing to a approximate depth of 7200. |
0382048483 | 2012-12-04 | Drill / Deepen / Reopen | No Violations | Inspection and status check of the drill site found the current drilling depth to be 7983 with the company currently tripping the drill string to change the drill bit, Total proposed depth to be reached to set the 9.625 casing string is 8300. |
0519853423 | 2012-10-24 | Drill / Deepen / Reopen | No Violations | Inspection found the current drilling depth to be 1526 using a 17.5 bit, Company man says they should be through the Berea and ready to run and cement 13.375 by 6PM on 10-25-12. |
0751868512 | 2018-03-08 | Production Wells | No Violations | Status check inspection found the well pad equipped with a casing and tubing well head assembly with (2) primary master valves on the tubing head assembly followed by an emergency shut down valve. The production valves are in the open position. There are multiple emergency shut down control points on location including the well pad entry point outside the gated and fenced well pad area. On location is a production facility consisting of a total of (5) production tanks of steel construction design all situated inside a polymer lined steel containment dike area. On this day I contacted the company production supervisor and discussed annular pressure monitoring. |
0821673807 | 2012-12-10 | Drill / Deepen / Reopen | No Violations | Inspection and status check of the drill site found the current drilling depth to be 8139 using a 12.250 TRI Cone Drill Bit. Current conditions find the Drill Sting Bottom Hole Assembly to be lost in the hole with a fishing service on their way to recover the lost 1000 Bottom Hole Assembly. Company is drilling on water based fluid. |
0825607401 | 2013-01-07 | Drill / Deepen / Reopen | No Violations | Inspection of the drill site found the current drilling depth to be 10,309 using a 8.5 bit, Inspector will note that they are currently nearing the bottom of the Horizontal curve and with a projected well bore depth of 15,622. |
0841094431 | 2013-01-11 | Drill / Deepen / Reopen | No Violations | My inspection found the current drilling depth to be 14,016 in the Horizontal section using a 8.5 bit. |
0963636438 | 2012-11-26 | Drill / Deepen / Reopen | No Violations | Inspection found the current drilling depth to be 6349 using a 12.250 bit with the company looking to set 9.625 @ 8300. |
1025455024 | 2012-12-17 | Drill / Deepen / Reopen | No Violations | Inspection and status check of the drilling progress found that 8231 of 9.625 casing was set and cemented with a 2 stage tool at 5017 with casing tally and cement job log records received. At the time of my inspection the drilling company is in the process of assembling and preparing to test the BOP and the 9.625 casing accordingly. All tests will be recorded on a chart. |
1047586997 | 2012-10-19 | Drill / Deepen / Reopen | No Violations | HAD Drilling rig #200 set conductor to depth of 102of 24casing at 76lb/ft. The open hole was 28to depth of 112. There was good circulation Universal had 30 barrel of returns. |
1259329012 | 2013-07-02 | Completion Testing | No Violations | Status check inspection on the completion found there has been a lost retrievable bridge plug at 10,630 with the company working to recover the bridge plug. |
1317635297 | 2013-01-23 | Drill / Deepen / Reopen | No Violations | Status check inspection on the recently completed well bore found the total depth drilled to be 16,198 with records received on both the 5.5 production casing tally and the production casing cement job. The well bore drilling process is now complete. Inspector Pat Shreve accompanied me on site on this day. |
1351201014 | 2012-10-25 | Drill / Deepen / Reopen | No Violations | Inspection @ 7AM found the current drilling depth of 1803 using a 17.5 bit, Company man indicated they should complete the total depth required for this string later this afternoon and have the 13.375 in the hole and ready to cement sometime close to 4 AM on 10/26. |
1351421524 | 2012-10-26 | Drill / Deepen / Reopen | No Violations | Inspector received phone call from the company man on site@ 5:30 AM that they had twisted the drill bit off @ 2052 and were calling in a fisherman to retrieve it. Further conversation through out the day indicated that formation material had covered the bit up. Inspector also had extensive conversation with the company man in regards to the permit conditions in which indicates that the BEREA zone must be isolated with this next string that they are trying to set, and that according to the formation depths of wells in the area they were app 100 short of covering the Berea. The company man indicated that they had the log from the Tippets #6HM and the current Mud loggers log both indicated that they were through the Berea. The inspector requested copies of both logs. |
1351549354 | 2012-10-29 | Drill / Deepen / Reopen | No Violations | 10:30 AM-The Company is currently drilling at a depth of 2119, using a 17.5 bit, Total depth to be reached to cement the 13.375 casing string in the ground is 2128 and should be reached within the hour. The company representative on site will notify the inspector with a approximate time that the casing is to be cemented. |
1352902459 | 2012-11-14 | Drill / Deepen / Reopen | No Violations | Inspection of the drill site found the current drilling depth to be 3577 using a 12.375 hammer bit, Drilling intentions are to core drill the Marcellus and then continue on to the Utica formations, setting their 5.625 casing in the process. |
1354317896 | 2012-11-30 | Drill / Deepen / Reopen | No Violations | Status check inspection on drilling progress found the current drilling depth to be 7535 using a 12.250 bit. Company is looking to set 9.625 intermediate casing at the approximate depth of 8300. Company also updated their permit conditions on the 9.625from a proposed depth of 5500 to 8300. |
1354815482 | 2012-12-06 | Drill / Deepen / Reopen | No Violations | Inspection and drilling status update found the current drilling depth to be 8018 and the company running back into the hole with the drill sting after tripping out of the hole for a bit change. TD of this current stage will be 8300 to set 9.625Casing. |
1355623391 | 2012-12-15 | Drill / Deepen / Reopen | No Violations | Inspector has received notification from and been in contact with the company men on site during the last 24 hours in regards to the running and cementing of the 9.625 intermediate casing string. It is the mutual understanding of both parties that approximately 8300 of New casing is being run with a 2 stage cement tool being set @ approximately 5000 with the intention of cementing the casing string back to surface level with a casing shoe-float collar-and bowstring centralizers being ran as required. The bore hole has been loaded and circulation has been established circulating bottoms up 2x before the arrival of the cement contractors. Approval was given to proceed and the company man will provide copies of job records to the inspector on his next inspection visit. |
1356014258 | 2012-12-20 | Drill / Deepen / Reopen | No Violations | Inspection of the drilling site has found the drilling company running back in the hole with the drill string preparing to drill out from under the 9.626 casing with intention to drill the vertical section to establish the formation tops and then plug back to drill their lateral bore hole. Inspector will note that the company has applied for their lateral section permit. |
1356482515 | 2012-12-25 | Drill / Deepen / Reopen | No Violations | Notification was received that the well bore vertical section total drilling depth has been reached and the company had completed the geographical logging procedures and is preparing to run in the hole with the drill string open ended to cement the vertical section back to their kick off point and then wait 24 hours to then begin drilling their horizontal section. Total depth reached was 10,030 with the top of the kick off plug to be approximately 8,530 to be set in 2 stages. |
1357148853 | 2013-01-02 | Drill / Deepen / Reopen | No Violations | Inspection found 9.625 casing set and the current drilling depth of 8333 with the company preparing to start to build their horizontal curve. |
1357476085 | 2014-07-30 | Preliminary Restoration | No Violations | Status check inspection on the preliminary restoration found the well drilling and stimulation process is now complete and the well is in line and producing with 5- 400 barrel production tanks on site servicing both 2 wells on the drill pad now in production. |
1358438028 | 2013-01-17 | Drill / Deepen / Reopen | No Violations | Inspection and status update found the current drilling depth to be 14,906 in the Horizontal section. Inspector will note that the company has applied for and received a permit correction allowing them to drill to 15,350. |
1359389957 | 2013-01-24 | Plug / Plug Back | No Violations | Francis Bros service rig was over well running 2.875 straight tubing in well to drill out composite bridge plug. The top of the plug was at 5615 not including Kelly Bushing depth. The rig drilled out the plug and ran tubing to 5751. This is where they will be setting the plug after tripping all pipe out and remove 4.5bit and sub. They are circulating on well with 10lb water based mud. |
1366158207 | 2013-04-16 | Drill / Deepen / Reopen | No Violations | Status check on stimulation process found the completion process between the 5th & 6th stage with a completion frack plug set at 14,552 and 40 perforations between 14,516 & 14,280. |
1366808130 | 2013-04-24 | Drill / Deepen / Reopen | No Violations | Status check inspection found the stimulation process complete and the company getting ready to rig up Weatherfords snubbing unit and do a cleanout run to flow test the well. |
1419839013 | 2012-11-12 | Drill / Deepen / Reopen | No Violations | Notification was made to inspector on this day that HAD Drilling rig # 105 was rigged up and has Re commenced drilling. Inspector did make 6 attempts to reach the contact number on site over the next 48 hours with no answer. |
1663518604 | 2018-06-07 | Production Wells | No Violations | On this day, I am conducting an inspection by request of ODNR Inspector William Stolarik in reference to an air quality complaint by a landowner. No unusual smells are indicated at this location. The well isnt equipped with annular pressure monitoring devices on the surface and intermediate casing strings. The company will need to have gauges installed for proper monitoring. The facility is gated with proper signage and an electronic shutdown button at the entrance. There are (5) 400 barrel steel tanks within containment, at the front left-side within containment. (2) gas processing units are located at the back left-side. There are (2) wells in production on this pad, surrounded by concrete barriers. The wellheads are properly identified. The company will be contacted to address the annular pressure monitoring issue. |
1848077268 | 2012-10-18 | Drill / Deepen / Reopen | No Violations | On location and rig is having a hard time getting 24in 26air hammer drilled well bore. After several tries of running pipe company is going to get 28tricone bit and ream hole out. |
1869237918 | 2013-07-15 | Completion Testing | No Violations | Inspection found the company finished with the completion plug drill out. The well is currently shut in and awaiting further flow testing. After observing 2 Francis Brothers water trucks on site hauling produced water notification was made to the ODNR Division UIC personnel of this matter for the to pursue. No notification noted on this day. |
2117246258 | 2014-02-19 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well has been completed and is in production with 5 - 400 barrel production tanks on site with proper well identification posted, The area affected by the pre site construction and drilling process will need addition excavation work when the weather allows. |
382048483 | 2012-12-4 0:00: | DD | No Violations | |
91802177 | 2012-11-19 0:00 | DD | No Violations |
For data sources see[7]