Well ID: 34-111-24370 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.83,"lon":-81.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000625 | |
Farm/Lease Name: ET RUBEL UNIT | |
License Status: Producing | |
License Date: 2016-12-07 | |
Spud Date: 2013-02-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2013-04-11 | |
Well Total Depth: 15311.00 ft | |
Configuration: Horizontal | |
Latitude: 39.830000 | |
Longitude: -81.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-02-25 | Proposed Formations:POINT PLEASANT, Issued Date:2/25/2013, Expired Date:2/25/2015 12:00:00 PM, Drilling unit acres:544.44, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2013-04-11 | |
Correction to Well | 2013-06-28 | CORRECTION TO SURFACE & TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2013-08-08 | |
Correction to Well | 2014-03-14 | CHANGE IN SURFACE, TARGET AND TAKE-POINT INFORMATON (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
APP | 2016-12-07 | Proposed Formations:POINT PLEASANT, Issued Date:12/7/2016, Expired Date:12/7/2018 12:00:00 PM, Drilling unit acres:544.44, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2017-10-24 | |
Construction Permit Expires | 2018-12-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-08-12 | 8907 | 15213 | 0 |
8907 | 15213 | 0 | |
8907 | 15213 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/23/2013 | 05/30/2013 | 7901 | 8,573,330.0 | 352346 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00055 | 435 |
AI-300 | U.S. Well Services, LLC | Acid Corrosion Inhibitor | Ethylene Glycol | 107-21-1 | 40 | 0.00031 | 241.533 | |
1-Decanol | 112-30-1 | 5 | 0.00004000 | 28.9807 | ||||
2-Butoxyethanol | 111-76-2 | 15 | 0.00009000 | 74.392 | ||||
Cinnamaldehyde | 104-55-2 | 15 | 0.00011 | 85.3732 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nolylphenyl)-omega-hydroxy,
branched |
127087-87-0 | 5 | 0.00003000 | 27.4945 | ||||
N,N-Dimethylformamide | 68-12-2 | 20 | 0.00012 | 97.3178 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 15 | 0.00011 | 84.2173 | ||||
Isopropyl Alcohol | 67-63-0 | 2.5 | 0.00001000 | 10.885 | ||||
1-Octanol | 111-87-5 | 3 | 0.00002000 | 17.6031 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 8.70286 | 6,844,700.0 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.5 | 0.14367 | 112998 | |
Hydrogen Chloride | 7641-01-1 | 18 | 0.03432 | 26991.6 | ||||
SI-1000 | U.S. Well Services, LLC | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 20 | 0.00394 | 3098.43 | |
Water | 7732-18-5 | 30 | 0.00329 | 2583.83 | ||||
Anionic Copolymer | Proprietary | 0 | 0.00436 | 3427.77 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Anionic Polyacrylamide | Proprietary | 40 | 0.04199 | 33026.4 | |
Petroleum Distillates | 64742-47-8 | 40 | 0.0338 | 26586.3 | ||||
Crystalline Salt | 12125-02-9 | 5 | 0.00525 | 4128.3 | ||||
Ethoxylated alcohol blend | Proprietary | 5 | 0.00525 | 4128.3 | ||||
Water | 7732-18-5 | 40 | 0.04199 | 33026.4 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.00161 | 1266.07 | |
Guar Gum | 9000-30-0 | 50 | 0.02683 | 21101.1 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.0041 | 3227.23 | ||||
Petroleum Distillates | 64742-47-8 | 60 | 0.02541 | 19984 | ||||
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00474 | 3728.5 | |
Deionized Water | 7732-18-5 | 28 | 0.00271 | 2129.7 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 90.9125 | 71,501,600.0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-05-27 | H2O | 15 | 8553 Bbl | 358695 | US Well Services Inc | STAGE 15
60 SHOTS |
2013-05-26 | H2O | 15 | 8289 Bbl | 353770 | US Well Services Inc | STAGE 13
60 SHOTS |
2013-05-27 | H2O | 15 | 8552 Bbl | 361520 | US Well Services Inc | STAGE 16
60 SHOTS |
2013-05-24 | H2O | 15 | 9020 Bbl | 106920 | US Well Services Inc | STAGE 4
60 SHOTS |
2013-05-23 | H2O | 15 | 9003 Bbl | 202700 | US Well Services Inc | STAGE 7
60 SHOTS |
2013-05-26 | H2O | 15 | 8712 Bbl | 356025 | US Well Services Inc | STAGE 12
60 SHOTS |
2013-05-25 | H2O | 15 | 9701 Bbl | 232620 | US Well Services Inc | STAGE 8
60 SHOTS |
2013-05-28 | H2O | 15 | 8443 Bbl | 359430 | US Well Services Inc | STAGE 20
60 SHOTS |
2013-05-29 | H2O | 15 | 8410 Bbl | 355100 | US Well Services Inc | STAGE 21
60 SHOTS |
2013-05-26 | H2O | 15 | 9666 Bbl | 337500 | US Well Services Inc | STAGE 11
60 SHOTS |
2013-05-28 | H2O | 15 | 8529 Bbl | 342930 | US Well Services Inc | STAGE 18
60 SHOTS |
2013-05-26 | H2O | 15 | 8520 Bbl | 347100 | US Well Services Inc | STAGE 9
60 SHOTS |
2013-05-30 | H2O | 15 | 8810 Bbl | 358650 | US Well Services Inc | Plug set at 9142', 60 perforations total. Final stage to be stimulated.
Stage 25 |
15 | 0 | 0 | ||||
2013-05-24 | H2O | 15 | 9050 Bbl | 238400 | US Well Services Inc | STAGE 3
60 SHOTS |
2013-05-28 | H2O | 15 | 9590 Bbl | 325380 | US Well Services Inc | 60 Perforations total, Annular pressures monitored electronically.
Stage 17 |
2013-05-28 | H2O | 15 | 9590 Bbl | 325380 | US Well Services Inc | STAGE 17
60 SHOTS |
2013-05-23 | H2O | 15 | 8064 Bbl | 45190 | US Well Services Inc | STAGE 2
60 SHOTS |
2013-05-26 | H2O | 15 | 8714 Bbl | 357550 | US Well Services Inc | STAGE 10
60 SHOTS |
2013-05-24 | H2O | 15 | 9773 Bbl | 178610 | US Well Services Inc | STAGE 5
60 SHOTS |
2013-05-23 | H2O | 15 | 9840 Bbl | 305050 | US Well Services Inc | STAGE 1
60 SHOTS |
2013-05-25 | H2O | 15 | 9584 Bbl | 245170 | US Well Services Inc | STAGE 6
60 SHOTS |
2013-05-29 | H2O | 15 | 8767 Bbl | 357345 | US Well Services Inc | 60 perforations - Horizontal completion.
Stage 24 |
2013-05-28 | H2O | 15 | 8562 Bbl | 360940 | US Well Services Inc | STAGE 19
60 SHOTS |
2013-05-29 | H2O | 15 | 8556 Bbl | 356680 | US Well Services Inc | STAGE 22
60 SHOTS |
2013-05-29 | H2O | 15 | 8475 Bbl | 356915 | US Well Services Inc | STAGE 23
60 SHOTS |
2013-05-27 | H2O | 15 | 8521 Bbl | 360500 | US Well Services Inc | STAGE 14
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ANTERO RESOURCES CORPORATION | 1365378 | 1220 | 141 |
2014 | ANTERO RESOURCES CORPORATION | 1415529 | 1 | 354 |
2015 | ANTERO RESOURCES CORPORATION | 600487 | 188 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 479015 | 51 | 363 |
2017 | ANTERO RESOURCES CORPORATION | 383687 | 137 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 301916 | 259 | 365 |
2019 | ANTERO RESOURCES CORPORATION | 59109 | 66 | 77 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ANTERO RESOURCES CORPORATION | Brine | 13874 | 141 |
2014 | ANTERO RESOURCES CORPORATION | Brine | 14841 | 354 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 7481 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 2733 | 363 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 2190 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2356 | 365 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 510 | 77 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1073347933 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
-26592360 | 2015-6-17 0:00: | PL | No Violations | 0.50 |
-27743818 | 2018-3-7 0:00:0 | PW | No Violations | 0.20 |
-301834931 | 2013-4-4 0:00:0 | DD | No Violations | 1.10 |
-330606830 | 2013-3-1 0:00:0 | DD | No Violations | |
-351862596 | 2013-5-15 0:00: | CT | No Violations | 1.00 |
-392247420 | 2013-8-14 0:00: | PW | No Violations | 1.20 |
-393174543 | 2013-5-28 0:00: | CT | No Violations | 1.00 |
-863511101 | 2020-2-7 0:00:0 | PW | No Violations | 1.00 |
0015929804 | 2019-01-24 | Production Wells | No Violations | On this day, I am conducting an inspection to document the SIMOPS progress for the plug and abandonment of permit number 4446. I spoke with Antero representative Barney Etcher, and he stated the SIMOPS process is being delayed due creating a standard operating procedure between departments within Antero Resources. Containment is being set in place and steel cages for the producing wells are onsite. The well in question currently has a nightcap in place and no gauges are present. I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units (GPU), (4) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 100 psi. |
0026592360 | 2015-06-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well location has proper erosion control and vegetation established. The company has recently added additional earthen containment around the well pad perimeter. Addressing the well status the well drilling and completion process is complete with the well in production with additional gas processing equipment located on the well pad in a separate location from the producing wells, there is also a total of 8-400 barrel capacity production fluid tanks on location located inside a plastic lined metal dike area with proper well identification posted at the well head. Preliminary Restoration passed on this day. |
0027743818 | 2018-03-07 | Production Wells | No Violations | On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the front right side of the pad, and a midstream facility along the front right side, as well. |
0301834931 | 2013-04-04 | Drill / Deepen / Reopen | No Violations | Status check inspection found the current drilling depth to be 8775 using a 8.750 drill bit and drilling on oil base mud, with the current drilling position of 71 degrees and 400 from reaching the bottom of the horizontal curve. The rig superintendent indicated they should finish the well bore within the next 4 days and be running production casing to cement. |
0330606830 | 2013-03-01 | Drill / Deepen / Reopen | No Violations | Inspector on stand by flexing hours waiting to set conductor. The company man called at 8:00 Am and reported the top hole rig was broke down and they would be another 24 hours before they would be ready to cement the #2H @ #3H. |
0351862596 | 2013-05-15 | Completion Testing | No Violations | The drilling process is complete and the stimulation process is set to begin in the next 4 to 5 days. |
0391416069 | 2019-01-29 | Production Wells | No Violations | On this day, I found Antero progressing with the SimOps procedure in preparation for the plug and abandonment of permit number 4446. TekSolv is onsite installing back-pressure valves in the tubing hanger on the (6) producing wells on the pad, prior to installing the steel cages over the wellheads. Fortis Energy is also onsite installing containment and preparing to rig-up, once the SimOps procedures have been completed. I spoke with Antero Representative Barney Etcher during the inspection. |
0392247420 | 2013-08-14 | Production Wells | No Violations | The said well is now in production. The tubing pressure id 3745 psi. I asked the company man on site to place proper identification on each well head. |
0393174543 | 2013-05-28 | Completion Testing | No Violations | Status check inspection of the completion process found the wire line company setting a completion type bridge plug at 10.927 and perforating 60 shots between 10,692 and 10,877, The company is currently completing the 18th stage. |
0412769605 | 2013-04-08 | Drill / Deepen / Reopen | No Violations | Status check inspection found the well total drilling depth has been reached at 1531 using a 8.5 drill bit. With the drilling rig conditioning the bore hole and preparing to run the 5.5 production casing. |
0423768162 | 2014-03-13 | Production Wells | No Violations | Inspector Eric Conrad and myself met on site with Anteros production supervisor Daren Rader discussing several site concerns listed as follows, site entry point identification, proper site soil compaction over the recently installed production flow lines, procedures for identifying temporary storage tanks with proper liquid content identification, general procedure safety during the completion drill out process, proper mapping and identification of buried underground production lines, proper containment under all fluid vessels on site. Mr. Rader understood this was to be addressed as procedure concerns on all Antero sites in general. |
0857430858 | 2013-10-02 | Preliminary Restoration | No Violations | Status check inspection on the well and location, On this day I spoke with Anteros safety coordinator and asked that each well head have proper identification and proper identification be placed at the entry point of the location. There are also contractors on site emptying the earthen pit and preparing to close it in. The area around the site has vegetation established and the drilling equipment has been moved off with the well currently in production. The tank battery has been erected on the site pad. |
0984213128 | 2013-04-10 | Drill / Deepen / Reopen | No Violations | The well bore total drilling depth has been reached at 15,311 and 15,315 of 20# 5.5 casing has been run and set. The cementers are rigging up to cement the long string. |
1073347933 | 2018-03-07 | Production Wells | No Violations | Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 180 pounds pressure and the 9.625 casing well head reads 200 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area. |
1168698246 | 2015-06-17 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well location has proper erosion control and vegetation established. The company has recently added additional earthen containment around the well pad perimeter. Addressing the well status the well drilling and completion process is complete with the well in production with additional gas processing equipment located on the well pad in a separate location from the producing wells, there is also a total of 8-400 barrel capacity production fluid tanks on location located inside a plastic lined metal dike area with proper well identification posted at the well head. Preliminary Restoration passed on this day. |
1191942922 | 2013-05-30 | Completion Testing | No Violations | The 25th and final stage to be stimulated was completed on this day with a stage completion report enter into the database. I also discussed with the company the water recycling system in use and the storage of chemical additives on the site. |
1285998303 | 2013-07-16 | Completion Testing | No Violations | Status check inspection and status update on the well completion process. The well is has been completed and the testing and completion process is finished and the well is hooked up awaiting the completion of the on site processing facility and gas transportation lines in area to be complete. |
1362960198 | 2013-03-10 | Administrative Inspection | No Violations | Inspector received a call that the primary rig Patterson 316 was set up and would spud and be ready to set Surface casing in the next 24 hours. |
1363280517 | 2013-03-13 | Drill / Deepen / Reopen | No Violations | Inspector on site 10 hours to witness the running and cementing of the 18.625 surface casing. The last 10 had to be washed in with circulation established prior to cementing and 100% cement excess ran with 32 barrels of cement returns to surface. The casing was left shut in 8 hours and pressure tested to 1000 psi with no recorded pressure loss. A records received -casing tally- cement job and chart along with pressure test chart. |
1363455129 | 2013-03-15 | Drill / Deepen / Reopen | No Violations | Drilling progress status check inspection to check on the current drilling progress found the current drilling depth of 895 using a 17.5 drill bit, with the next casing sting to be set @ 2155 which will be 13.375. |
1363811659 | 2013-03-20 | Drill / Deepen / Reopen | No Violations | Inspection and status check of the current drilling progress found the current drilling depth of 2155 and the company drilling out the casing shoe inside the 13.375 casing. Records were received from the BOP and casing pressure test. |
1364029159 | 2013-03-22 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling progress found the current drilling depth to be 3656 using a 12.250 bit. The company has picked up a down hole motor and is running in the hole with it to make a deviation adjustment of the well bore placement. |
1364472970 | 2013-03-28 | Drill / Deepen / Reopen | No Violations | Inspector received phone notification and stopped by the drilling site in regards to the rig completing the current well bore drilling stage. A total depth of 6935 was reached using a 12.250 bit the company is conditioning the bore hole and will begin to run the 9.625 production casing within the next 12 hours. The casing program tally was reviewed and proper casing centralizer placement noted as well as the 2 stage tool placement at 4440. |
1364863216 | 2013-04-01 | Drill / Deepen / Reopen | No Violations | Inspection and documentation of the running and setting of the 9.625 casing. Inspector was in phone contact and received notification of the running and setting of 6,935 of casing in a 2 stage process with cement return to surface. All records received- casing tally- cement job and pressure test on 04/01/2013. |
1365762109 | 2013-04-10 | Drill / Deepen / Reopen | No Violations | Inspector on site to witness the beginning of the 5.5 production casing cement job, 15315 of production was set and cemented back to surface using a lead and tail cement mix with the casing being pressure tested to 2500 psi or 500 psi over lift pressure. |
1371155289 | 2013-06-13 | Completion Testing | No Violations | On this day a work over rig was rigged up on the hole completing the post stimulation drill out of the completion plugs. The current tubing and bit depth was 12,500. Proper well head control was in place and the excess gas was being flared. |
1554762052 | 2013-03-02 | Drill / Deepen / Reopen | No Violations | Inspector on site to witness the running and setting of 100 of 26 conductor pipe. The pipe was cemented back to surface with 100% excess ran and the tin horn cellar sealed 12 deep at the same time. Express anergy services were the top hole drilling contractors. The well was spudded on 02/28/13. |
15929804 | 2019-1-24 0:00: | PW | No Violations | 0.20 |
1902034828 | 2013-03-26 | Drill / Deepen / Reopen | No Violations | Status check of the current drilling progress found the current drilling depth to be 5664 using a 12.250 bit. The next casing string to be set is the 9.625 at a depth of 6935. |
2069285181 | 2013-10-27 | Production Wells | No Violations | Follow up inspection to complaint # 4510 forwarded over from Aaron Wolfe with the Ohio EPA, The photographs sent to the EPA by Ruth Partin were reviewed by my Supervisor Rocky King and Myself and along with the EPA it was found no violations were present in the photos, The request by Ruth Partin to disclose the nature of the production equipment on location will be for site safety reasons forwarded to Anteros public relations department for answering, The EPA provided only a email address and failed to document a time or day of contact as well as any personal contact information for Ruth Partin. My on site inspection found my recent request after my last inspection on 10/02/2013 to post proper identification met, All 3 wells on location are in production and a Myers tank truck was on location withdrawing processed water with proper safety grounding and spill containment in place while loading, The Myers UIC number was also properly posted on the tank truck. |
391416069 | 2019-1-29 0:00: | PW | No Violations | 0.20 |
412769605 | 2013-4-8 0:00:0 | DD | No Violations | 1.00 |
423768162 | 2014-3-13 0:00: | PW | No Violations | 1.50 |
497534115 | 2020-9-23 0:00: | PW | No Violations | 0.30 |
857430858 | 2013-10-2 0:00: | PL | No Violations | 1.20 |
984213128 | 2013-4-10 0:00: | DD | No Violations |
For data sources see[10]